Bath 6 to 6 with a second floor. Installation of finishing floors, cladding of ceilings and walls

If you live in Moscow, you have definitely thought more than once about how to spend your free time in nature. But sometimes the construction of a steam room and country cottage alone is too expensive.

In the company "Tsar Bath" you can order exclusive project baths, combining a room for thermal procedures and relaxation rooms. This will allow you to save money on the arrangement of a cozy country house and at the same time invest in healthy lifestyle life.

Two-story wooden baths: traditions of national recreation in a new way

If it seems to you that the log cabin of a bathhouse usually looks standard, we will change your idea of ​​​​this structure. As soon as you contact our company, your dream of a real elite bath will become a reality.

If you are interested in projects two-story baths, You will surely appreciate the advantages of cooperation with us:

  1. Each of our projects is unique. Our experts will ask the client in detail about all his wishes and on the basis years of experience develop a sketch of the bath with original design that will meet the most stringent building codes.
  2. In our projects of two-story baths, everything is thought out to the smallest detail, so you will get real pleasure from a weekend spent in your own steam room.
  3. We will definitely pick suitable option for any customer, regardless of his financial capabilities, because your comfort is important to us. You can choose a bathhouse not only with a toilet, shower, swimming pool, terrace or barbecue, but also become the proud owner of a building with an attic or a balcony.
  4. Profitable price for high quality - something that will dispel your doubts when choosing construction company. After all, it is these factors that most of all concern most customers. By contacting our company you will be able to evaluate the quality of our buildings, we will show you completed project which you want to order. If you want to make changes to the finished project, we will gladly fulfill your wishes. At the same time, the price of the future structure will not change.

Secrets of building two-story baths: what you should know

Any turnkey two-story bath has its own characteristics, which must be taken into account in the practical implementation of the project. In the case of two-story buildings, this is especially important, since its repair will be quite expensive. For us, the construction of two-story baths is not difficult at all thanks to our extensive experience in this area.

Among the advantages of working with us, we highlight the following:

  1. We carefully calculate all the risks in the construction of two-story baths, in particular, the load on the foundation and the strength of the beams.
  2. At your request, it can be a bathhouse made of logs or profiled timber. Our company works only with materials High Quality so the final choice is yours.
  3. During the construction of two-story baths, we clearly indicate the period after which you can already bathe in your own steam room.

Our company cares about the reliability of its reputation. Therefore, feel free to order a two-story bath of excellent quality from us. Turnkey bath house two-story from the manufacturer - rational choice at the best price.

Bases (piping) in two rows, made of unplaned (sawn) timber 100 × 150mm (for professional timber 90 × 140mm) - timber 150 × 150mm (for professional timber 140 × 140mm) - timber 200 × 150mm (for professional timber .beam 190×140mm). A ruberoid is laid between the first row of strapping and the foundation.

Exterior finish (cornices, gables) is done with galvanized nails.

The assembly of corners is carried out - In a warm corner (thorn-groove).

Ceiling height from the floor 1st floor - 2.25 cm ± 5 cm (16 rows of timber).

Ceiling height from the floor 2nd floor - 2.25 cm.

Roof - Gable (according to the project).

The height from the interfloor ceiling to the ridge is at least 3.40 cm.

Interfloor floors ( ceiling beams) - is made from a board with a section of 150 × 40 mm (in increments of 90 cm per edge).

Rafters (installed between interfloor ceilings) from a board with a section of 100 × 40 mm, (in 90 cm increments).

Floor of the 1st floor:
— A. Rough edged board 20-25mm. 1st grade 20-22 mm. It is laid across or along the genital lags on a cranial bar 40X50mm.

Walls made of profiled timber are not sheathed.

Partitions on the 2nd floor are missing.

Door and window openings 1st floor with bandaging of timber.

Under the under-lattice along the rafters, Izespan D film or analogs of equal characteristics are stretched. With a vein gap of 20 mm, if the roof is covered with metal tiles.

Approach (technological) of 2/4 steps, 1.5 m wide

Foundation - Column-point (cement blocks) 12 supports. Four blocks in one support.

The bases (piping) are two rows, made of unplaned (sawn) timber 100 × 150mm (for professional timber 90 × 140mm) - timber 150 × 150mm (for professional timber 140 × 140mm) - timber 200 × 150mm (for professional timber 140 × 140mm) timber 190×140mm). A ruberoid is laid between the first row of strapping and the foundation.

Log cabin (walls of the 1st floor) - Profiled beam 90 × 140mm, 140 × 140mm or 190 × 140mm with a crescent, it is possible to replace it with a straight-cut beam with an unloading cut. Upon agreement, specify the shape of the beam. bar natural humidity.

Floor logs are made of unplaned (sawn) timber - timber 100 × 150 mm. (in 60cm increments)

The log house is assembled (knocked together) on a birch dowel

outdoor and interior decoration done with galvanized nails.

The assembly of corners is carried out - In a warm corner (thorn-groove)

A flax-jute cloth is laid between the crowns.

Partitions of the 1st floor - Profiled timber 90 × 140mm. Straight. Installation with chasing into main walls, 2-4 cm deep. Bar of natural humidity.

Roof overhang 0.30m is hemmed with clapboard. Ventilation grilles are installed on the gables.

Ceiling height from floor 1st floor -2.20cm±5cm (16 rows)

Ceiling height from the floor 2nd floor - 2.20 cm

Roof - Gable (according to the project)

Height from the interfloor ceiling to the ridge - at least 3.40 cm

Roof Ondulin (Red. Brown. Green) Upon agreement, specify the selected color.

Interfloor ceilings (ceiling beams) - made from unplaned boards 150 × 40 mm (in increments of 90 cm per edge)

Rafters (installed between interfloor ceilings) from a board with a section of 100 × 40mm, (in 90 cm increments)

Ceiling of the 1st floor:
- a. Hemmed with coniferous lining, dry lining of class B

Floor of the 1st floor:
Gender double:
- a. Rough edged board 20-25mm. Grade 1st (natural humidity). Thickness 20-22 mm. It is laid across or along the genital lags on a cranial bar 40 × 50 mm.
— b. Wind insulation Ondutis (izespan) or analogs equal in characteristics.
— c. Insulation Roll "Isover" 100 mm
— d. Finish sheet piling batten 36 mm chamber dried (dry)
— f. When laying the floorboard, the boards are attached to the joists every fifth board, to enable the Customer to carry out the hauling of the floors on their own after they have dried out over the years.

The doors are blind paneled. Hinges are included with the doors, as well as work on installing doors, fittings for paneled doors are not provided. Doors are installed according to the plan.

Doorways on both sides are trimmed with platbands from coniferous lining.

Floor in the attic - floor (tongue) board - 36mm (chamber drying). Installation according to the first floor.

Wooden double glazed windows (single-chamber) with fittings 1000×1200mm and 500×500mm. In the amount of the corresponding scheme of the house.

The walls of the 2nd floor are frame-panel, finished with clapboard, dry class B (chamber drying)

Window openings on both sides are trimmed with platbands made of coniferous lining.

Attic frame-panel
- a. Sheathed with coniferous clapboard - Dry clapboard class B (chamber drying)
— b. Insulation Roll "Isover" 100 mm
— c. Vapor barrier - Ondutis (izespan) or analogues equal in characteristics.

The first floor and the attic are connected by a single-flight staircase with a protective border. Finishing stairs: railings (carved), balusters - chiseled (volumetric). Starting poles are set. Steps planed board 40×200mm. The length of the march and the angle of inclination is determined by the availability of free space where it will be installed.

The junctions of the floor-wall, ceiling-wall, corners are trimmed with carved plinth.

Roof slats made of edged board 100×20mm, step 22 cm.

Under the under-lattice along the rafters, Izespan D film or analogs of equal characteristics are stretched. With a vein gap of 20 mm, if covered with metal tiles.

The pediments are frame-panel, upholstered with outer side dry lining class B (chamber drying) with wind insulation.

When installing doors and windows, a space is left between the box and the wall, for the shrinkage of the timber, this space is not insulated and does not foam.

External corners are sewn up with coniferous dry clapboard of class B (chamber drying)

Approach of 2/4 steps, 1.5m wide

Entrance metal door

In the steam room, the ceiling and walls are hemmed with a layer of foil from class A dry aspen lining.

Furnace - Not provided in the basic configuration. Selected individually.

A shower tray with a siphon (drain) outlet is installed in the sink.

In the steam room, a two-tiered aspen canopy is mounted. Vent.

The door to the steam room-Wedge ( conifers)

The frame two-story house-bath will be a great place to relax with family or friends on the weekends. Built from highly environmentally friendly natural materials, such a house will provide its residents with maximum comfort and functionality. From the point of view of the ratio of price and possible amenities, a bath 6x8 is considered optimal.

On its area it is quite possible to arrange a fairly spacious bath, shower room, utility rooms, small pool, gym, bedroom, loggia. Expenses land area and the money for the construction of such a house will be much lower than for the construction of an ordinary frame house with amenities and a separate bath.

The best projects of two-story frame houses-baths 6x8

The first step on the path of building or acquiring for recreation should be the selection or development of a project. Most often, the customer or owner is not able to independently design a bath house, taking into account all their needs, and is forced to turn to professionals for help.

For owners who are not very demanding on the uniqueness of the structure of the structure, there are many standard projects, on which you can build your house for free.

The most popular typical projects are:

  • Residential house-bath. The project is designed for year-round full-fledged living of a small family. On the ground floor there is a bathhouse (steam room, shower room, bathroom), small room rest (dressing room or dressing room), a spacious kitchen, a hall with stairs and a veranda with access to the outside. In the attic - 2 living rooms and spacious loggia.
  • House-bath for a noisy holiday with a large friendly company. On the ground floor there is a terrace to sit outdoors, sheltered from the sun. Guests will appreciate the large bath rooms and a spacious relaxation room, which can be equipped with a swimming pool or exercise equipment. The attic floor is given over three quarters for a huge bedroom, which can be additionally equipped with a billiard table or game consoles. The loggia with an area of ​​9 sq.m will serve as an excellent place for storing things and smoking for all guests at the same time.
  • An intermediate option for a more intimate and longer pastime, wherein attic floor divided into several separate small bedrooms and common room recreation, a smaller loggia, and the first floor is additionally equipped with a dressing room and a vestibule.

How to build a two-story house-bath 6x8

Self-construction of such a structure will significantly save money, but will require significant construction and design skills. The process of building a house-bath is in many ways similar to the construction of an ordinary small frame house. The functional specialization of individual rooms requires a special approach to the planning of engineering and insulation systems.

Layout features


The invariable features of the layout of two-story bathhouses are:

  • Location on the ground floor of all bath and office space. The ceiling of the first floor needs a thorough vapor barrier.
  • Availability on the ground floor sauna stove. Places increased demands on the system fire protection, thermal insulation and ventilation.
  • Attic living quarters directly above the bathhouse. They require enhanced thermal insulation and air conditioning systems.

Special mention must be made possible installation swimming pool in the recreation room on the ground floor. This greatly changes the foundation work required, as the pool is much easier to install before the house is assembled. A cheaper option that does not require major changes to the foundation would be to install a Jacuzzi-type mini-pool in the shower room.

Construction stages

After creation or selection finished project, you must choose land plot for its implementation.

When choosing, you need to consider:

  • Soil type and terrain slope. Building in the wrong place can lead to premature destruction of the structure, and the cost of laying the foundation will be much higher.
  • Proximity to public water supply and sanitation systems, or availability well water. Water supply can cost as much as the price of the whole house.
  • Location of gas supply systems. Only when choosing a gas oven.
  • Availability of storage space for firewood. When choosing wood.

Foundation construction

Frame two-story structures usually have a very small weight and do not need a powerful foundation.

In most cases they are placed on pile foundations built in this order:

  • Site clearing. It is necessary to get rid of all plants and remove upper layer soil with grass.
  • Markup. Produced with stakes and cord. At the first stage, only the marking of four corner piles is carried out, according to horizontal level and at right angles. After their installation, the marking of the remaining piles around the perimeter and inside. The pitch of the piles is chosen as close as possible to 120 cm, taking into account the length of the wall. For example, on a side with a length of 6 m, the step will be exactly 120 cm, and on a side with a length of 8 m - 133 cm.
  • Preparatory earthworks. This can be drilling to a depth of 30 cm below the freezing point for cast piles, or digging 40 cm for screw piles. The lower point of the well for a cast pile is expanded using a special drill blade.
  • Installation of piles. Screw piles are twisted manually with a lever, like a screw, until it stops, to a depth of one and a half meters. If the stop is not reached, it is possible that a place with too soft soils has been chosen and it is worth choosing a different type of foundation. Cast piles are made by laying ruberoid formwork and reinforcement from steel pipe, and subsequent pouring of the entire structure with concrete. A variant with the involvement of special equipment is also possible - steel piles are driven into the ground with strong blows.
  • Alignment of piles and installation of grillage. Screw piles and piles installed by machinery are cut along the cord. The grillage can be in the form of pile heads and a crown of large section, or a continuous channel / I-beam welded onto the piles. In the latter case, the I-beam is able to take on part of the load on the crown and significantly strengthen the structure.

For foundations of frame structures permanent residence they use a strip foundation, which is structurally simpler than a pile foundation, does not require a separate arrangement of the grillage, and is more resistant to seasonal soil deformations.

Such a foundation is a monolithic reinforced or reinforced concrete underground wall around the entire perimeter of the house, on which the frame rests. The disadvantage of such a foundation is the many times increased cost of materials and the need for special equipment to deliver it.

The foundation elements inside the perimeter of the bath house must be positioned so that there are support points at the installation sites of the stove, stairs and mini-pool.

Frame installation


The frame is mounted in the following order:

  • Crown installation. For solid grillage or strip foundation a board 50x150 mm is used, mounted flat, for a house on pile heads - a bar 150x150 mm. The crown is laid on waterproofing made of roofing felt or polyethylene foam, and attached to the foundation with anchors.
  • Performance bottom strapping. Two boards 50x150 mm are placed with an edge parallel to each other at a distance of 5 cm along the entire outer perimeter of the crown.
  • Installation of longitudinal logs. A board 50x150 is placed with an edge in the center of all the inner boards of the crown and cut into the harness with a cut.
  • Installation of transverse logs. A 50x150 board is cut with a cut perpendicular to the longitudinal lags with a step of 60 cm.
  • Assembly of wall frames. The walls are assembled from the same board, step uprights- 60 cm. Installation of door and window openings. At the end of the assembly, all internal wall openings are reinforced with diagonal braces. Frontal and internal bearing walls are carried out a floor high, and have an upper crown similar to that installed on the first floor. The side walls are made of higher racks and completed with the installation of a mauerlat.
  • Performance top harness and installation of an attic floor log. The process is similar to installing the first floor log, but there is no support for the crowns and the foundation. Spans of more than 4.5 meters are fixed to the supporting walls.

The best material for the manufacture of baths is glued laminated timber, which provides the necessary strength and insulation characteristics. Ordinary lumber will require careful treatment with water-repellent, fire-resistant and antiseptic agents.

Most lumber is supplied in 6m lengths, so for the 8m side, you will have to use a build-up of the timber using special cuts and cotter pins. All fasteners are made with self-tapping screws using metal corners.

Equipment of the subfloor and draft floors of the first floor and attic, installation of stairs

  • The arrangement of the underground is used to increase the durability of the structure. The gaps between the piles around the perimeter of the house are clogged construction waste and close decorative trim, for example, under granite. The subfloor is laid with geotextiles, covered with a layer of compacted sand 10 cm and expanded clay to the level of the log.
  • A solid draft floor can be made from OSB sheets or boards 25x100 mm installed on 40x40 mm bars stuffed around the perimeter of the lags. In the ceilings and floors that will be in the bath room, it is imperative to use waterproof materials, for example, water-repellent plywood.
  • Installation of the stairs is carried out in a predetermined place with reinforced floor lags.

Roof installation

  • Assembly and installation of the frame gable. The pediment is assembled on the second floor and sheathed on the outside with OSB or plywood. After the rise, the pediment is temporarily fixed with jibs.
  • Installation of a ridge beam between the gables. A span of more than 6 m requires the presence of at least one transverse wall lintel between the attic rooms, into which it will be possible to build in an additional support for the ridge beam. In the simplest case, this role is played by a jumper for the loggia. The support can be made either as a column/bearing wall or as a horizontal support beam.
  • Laying on the Mauerlat and ridge beam of rafters from a board 50x150 mm in increments of 60 cm. The rafters must converge tightly with each other, forming a rafter pair, so that on the ridge beam after complete installation roofs were not created vertical loads. The rafter pair in the upper third should be fastened with a puff from a board with a section of less than 40x100 mm.
  • Installation of waterproofing and lathing on the rafters according to the instructions for the selected roofing material.
  • Installation of roofing material and ridge according to the instructions. For frame structures, it is recommended to choose lightweight types of roofing - soft tiles, metal tile, ondulin.

External wall cladding, installation of secondary partitions, installation of windows, doors

The walls are sheathed sheet material or clapboard, the frame is pre-laid with waterproofing. Partitions are attached to the cladding and floors, made in the form of a frame of timber 50x50 mm. After installing windows and doors, the structure begins to resemble a residential building.

Insulation of walls and attic

  • Wall insulation on the first floor, not related to the bath room, is made with mineral wool or extruded polystyrene foam (EPS) with a thickness of 10-15 cm.
  • For the attic as thermal insulation, mineral wool would be a good option. 15-20 cm thick or ecowool 15 cm thick.
  • For bath rooms, the best option would be use of polyurethane foam or multiple layers mineral wool stone type. The outer layer of multilayer insulation can be made of XPS.
  • At the end of the insulation, the frame is hemmed with vapor barrier, for bath rooms it is better to use a vapor barrier with a reflective layer and aluminum sizing along the edges.

Installation of engineering systems, furnaces

  • A brick oven is placed on a prepared base in the foundation.
  • The steel furnace is placed on the floor, placing a special heat shield under it.
  • Due to the high fire hazard for correct installation furnace and chimney, it is imperative to involve the master.
  • Bath rooms should be equipped with special sewerage and ventilation.
  • The location of the stove in a heat-insulated room leads to the need to install a distributed heating system for the whole house. Heating can be carried out from a sauna stove or other source of energy.
  • Water, electricity, gas if desired.

Installation of finishing floors, cladding of ceilings and walls


In residential premises, finishing floors are mounted in this way:

  • A vapor barrier is laid on the draft floor of the first floor.
  • A heater, most often mineral wool, is placed in the cells formed by longitudinal and transverse lags.
  • Cover the insulation with waterproofing.
  • Lay a finishing floor from a tongue and groove board 30x150 mm.

Floor construction in bath rooms depends on the type of drain used. Special attention given necessary slopes floors and powerful waterproofing. As a heater, it is permissible to use only non-hygroscopic heat-resistant materials, stone wool or polyurethane foam.

Ceilings and walls are lined with vapor barrier and sheathed with OSB; reflective-type vapor barrier and waterproof materials are used in the baths.

Finishing

A sheathed OSB house-bath may well be used for its intended purpose, but it is unlikely to please the eyes of guests. To give the building a pleasant look, we can recommend such basic Finishing work:

  • installation of cashing windows and doors;
  • sheathing the outer surface with siding or imitation timber;
  • sheathing of all walls and ceilings with clapboard;
  • installation of skirting boards.

Order turnkey

Due to the great complexity necessary work The most popular method of building a bath house is to order from a turnkey construction company.

There are the following options for such an order:

  • Ordering a completely ready-to-use building from scratch. The contractor carries out project development, construction, summing up supply systems. The most expensive way.
  • Turnkey order, without supply systems.
  • Order only for construction and materials. One of the typical projects is taken. It makes it possible to save about 30 thousand rubles on the development of the project.
  • Purchase of factory design. The kit includes all fasteners, lumber with cuts, detailed instructions by installation. If desired, you can install it yourself or entrust the work to the employees of the manufacturer.
  • Order "under shrinkage". The contractor performs all basic works that require high qualification - installation of the frame, log, stairs, roof, subfloor on both floors. frame houses are not subject to large shrinkage, so the owner can continue finishing work immediately after the completion of the contractor's work.

The main advantage of ordering a turnkey bathconstruction speed. On average, the installation of a 6x8 bath by a team of professionals takes from a week (collection of factory equipment) to a month, excluding foundation works. Self-collection with the involvement of one assistant will take from a month to six months.

Where to order in St. Petersburg and Moscow

Almost all major Russian construction companies offer their services in Moscow and St. Petersburg. In this regard, in these cities and regions, the buyer is more likely to be faced with the problem of choosing from dozens of names on the Internet than the lack of a suitable contractor.

You can find reviews about the work of certain companies in the network, ask the opinion of friends. The best option will involve the selection of an experienced third-party builder who is able to evaluate other works of the proposed contractor.

Where to order in other cities

Large construction firms serve most regions of the European part of Russia. If you want to build a frame house-bath in the Urals and further to the east, you will most likely have to turn to regional contractors. Usually there are not so many of them, and you have to make a choice between two or three of the most solid ones.

Construction business frame houses very profitable, therefore, in any more or less large Russian city, using the Internet, you can find a suitable construction organization.

Small contractors usually do not offer services such as delivery of a factory prefabricated house, connection of supply systems, development of a unique project.

Conclusion

A two-story bath in any case will cost its owner a considerable amount of money, but all the costs of it will return a hundredfold in the form of health and Have a good mood. It doesn't matter whether assembled by yourself or made on a turnkey basis, the frame bath house will undoubtedly serve as a great place to relax after a hard week of work.

Two-story frame house-bath 6x8


(click on project to enlarge)



Looking at the project two-story bath 6x6, it can be assumed that several people can be in it at once, hence, when ordering a wooden bath according to the project, you have the opportunity to invite big company and enjoy your time and relax.

The bath area is 50.9 sq.m., of which the terrace is 8.3 sq.m. The bath plan includes a steam room, washing department, dressing room and big room- a bedroom with access to a balcony.

A two-story bath 6x6 made of timber on the ground floor has a rest room, in which benches are most often located, a sofa with hangers, for ease of undressing, in front water procedures, they also put a table for rest after them. Traditionally, the layout includes a sink and a steam room with aspen shelves.

The second floor of the bath has only one room, a room of almost 16 sq.m., the function of which is rest and sleep after bath procedures, while absorbing a pleasant aroma in an environmental pure material coniferous wood, in particular pine, from which the bath is made.

After visiting the couples department, you can go to Fresh air on a practical and spacious outdoor terrace to breathe clean countryside air.

The pleasant smell of wood creates a unique atmosphere in a beautiful two-story bath, and the wood of coniferous trees also has a number of healing properties that have a beneficial effect on a person's well-being.

Profiled bar. In the construction of our baths we use only quality material, own production.

(click on photo to enlarge)









Joinery. The final stage of the installation of the bath is the finishing work. Used as joinery wooden windows 1.2x1.0 (0.6x0.6 in the steam room). All windows are double, winter, glazed, with fittings. Wooden paneled doors 2.0x0.8, entrance-metal. It is possible to produce other sizes for the customer, as well as the installation of plastic PVC windows,




A photo log baths . During installation, we use proven technologies, build from scratch and turnkey.




For wooden baths use the following types furnaces for, for a fire chamber of a steam room in a bath. We put following models: Teplodar, Ermak, etc. We also install furnaces with hobs in houses (baths). Some photos are here. More


When installing the oven in the steam room, we comply with construction and fire regulations. It is possible to order lining (cutting) with furnace bricks. The steam room is finished according to the technology with aspen clapboard on foil, the installation of shelves.



Technical description of a one-story bath from a bar 6 × 6

  • 1. Type of foundation: support-columnar
  • 2. Material of the main walls: profiled timber 150mmx100, 150x150, 150x200
  • 3. Way of fastening the crowns: on metal dowels (nails 200mm), (on wooden dowels for an additional fee)
  • 4. The cutting of corners is performed: “to the floor of the tree” (“in warm corner", he is a thorn-groove, for extra. fee)
  • 5. Mezhventsovy heater: "jute"
  • 6. The material of the “subfloor” and the roof lathing: the material of the “subfloor” is a 20mm edged board, a 20mm edged board crate with a step of no more than 400mm
  • 7. Material lag and truss system at home: logs from a bar 150mmx100 with a step of no more than 1.0 m, rafters 50mmx100 with a step of no more than 1.0 m.
  • 8. Floor board and fastening method: 28mm floor board (groove board) is fastened with nails. (floor board tongue and groove 36mm for extra charge)
  • 9. Ceiling height: 1st floor - 2.35-2.4m. (17 crowns), 2nd floor -2.3m.
  • 10. Decoration Materials: gables, attic, ceilings and roof overhangs: softwood lining
  • 11. Used thermal insulation material"URSA": floor of the 1st floor - 100 mm., floor, ceiling, walls (entire attic) 50mm.
  • 12 Used vapor barrier material: "izospan" (fits on the floor and ceiling, walls)
  • 13. Used waterproofing material: roofing felt (laid between the foundation and the lower crown)
  • 14. Roof type: gable
  • 15.Used roofing materials: ondulin (red, brown, green)
  • 16. Joinery: a) door blocks: interior - paneled (2.0x0.8m.), entrance metal, with a lock and a peephole.

b) window blocks: opening, double, glazed, with fittings (1.2x1m.), in a pair compartment (0.6x0.6m.)

  • 17. Partitions: 1st floor - profiled timber 145x90mm., 2nd floor - frame-panel
  • 18. The steam room is sheathed with aspen clapboard on foil, shelves are installed
  • 19. Change house for builders 3*2 m.
  • 20. Generator for rent, customer's fuel (delivered for an additional fee if there is no electricity at the customer's site)
  • 21. Installation of the furnace at the request of the customer for extra. fee

Bar of natural humidity (atmospheric) drying (bar of chamber drying (dry) for an additional fee)

A coniferous plinth is nailed to the joints of the corners of the walls, the ceiling.

Note: Antiseptic treatment of the bottom trim and subfloors, slats (casing) in windows and doors, painting the house from the outside, delivery of a change house and a generator for an additional fee. fee.

It is possible to replace the foundation, windows with PVC, increase the thickness of insulation, replace the roof with corrugated board, metal tiles, etc.

Delivery within a radius of 500 km from Pestovo (Novgorod region) is free.

  • Additional services:

Double
in door and window openings
lower trim and subfloors
outside in one layer
under the roof
Assembly on
Dry

The banya is so Russian, sincere, that we are no longer amazed when we see it on someone's site. Why be surprised? Need to build!

The layout of the bath 6 × 6 begins ... No, not with the purchase of timber or bricks, but with the preparation of brooms. Looking at them, and the work goes on, and time runs faster, and the thought of a steam room warms the soul. Well? Already want to steam?

If you managed to allocate a place on the site for a future steam room, you can arrange a classic bathhouse, a sauna, and a hammam there. Although they have one purpose - to relax the human body, warm up, remove all ailments and ailments. What kind of bath will you have? Without an attic or with it? Perhaps with a terrace, a veranda, a pool inside. With such an area, you can afford almost everything.

What should we build a bath? What would it be from?

Yes, I want it to smell in the steam room itself, in the rest room natural wood. Then wooden lining, wooden panels help you.

If you need a bath urgently, you can buy ready-made frame structure. Outside it is lined with stone or brick, and inside it is trimmed with wood. But in this case, you should not even think about building a second floor - the walls will not withstand.

Did you see? Pass by

What materials for the construction of a bath should not even be considered?

  • Synthetic materials for the walls will not work.
  • Plastic panels should not be used.
  • Raw tree. Even if you cut the logs yourself, they need to dry in vivo a year or two.
  • Wooden walls must not be varnished or painted. Drying oil also cannot be used, no matter how the seller in the store assures you. It is a product of oil refining. So, from natural there is only a bank - that is, nothing. And its contents will harm health.
  • Any materials containing synthetic ingredients.

Do not hesitate to ask for quality certificates for the purchased products.

Zoning a bath

Developing different kinds 6 × 6 bath layouts: with an attic and a toilet, with a pool, dressing room, veranda or without it, it is worth remembering that the dimensions of 6 meters are the external parameters of the building. Depending on the type building material the internal area will decrease to a lesser or greater extent.

An example of the layout of a bath 6 × 6 on one floor

The design of the 6x6 bath gives more options for fantasizing than the 6x4 sizes. But they have the same layout.

  • dressing room;
  • washing or shower department;
  • steam room;
  • restroom;
  • terrace;
  • bathroom;
  • pool room.

You can find a place for the furnace zone, where a supply of firewood will be stored or there will be a mini-boiler room, a water-heating tank.

Sauna 6×6 s big room recreation


The steam room is the heart of the bath

If the frame of the bath is strong, you can immediately consider the layout of a two-story bath 6 × 6. Equip a rest room and a billiard room on the second floor, and all other rooms on the first floor. Now you can take and entertain much more guests and friends.

It's all in the details

Sauna stove and water tank

Baths need to be heated and hot water.

In a 6×6 bath, it is practical to use a stone oven. Metal heats up quickly and cools down just as quickly. Therefore, its heat is not enough for all rooms.

The pool in the bath is a dream

If there is a second floor, the pipe coming out of the stove must be lined with bricks like a Dutch stove (for 3 wells).

In addition to the oven, you will need a boiler or water heater. Often, wanting to save on footage, they combine a tank for hot water and the oven is very reasonable.

Tank types:

  • combined. The stove heats up the water. True, because of this, it gives a little less heat to the rooms;
  • pipe. Stove separately, tank separately. And the tank can be placed indoors above the stove to be closer to the chimney;
  • remote. They are equipped in the shower compartment and require the installation of a heat exchanger.

When choosing a tank, roughly calculate how many people will be steaming in the bath at the same time. 10 liters are needed for 1 person. And for 6 - at least 60-75 liters.

Restroom

If it is on the second floor, there is a place in it for billiard table, and for the bar counter, and for a couple of cozy sofas.

Does the layout include a balcony or terrace? Take out and there a couple of chairs with a table. Note that the internal area will decrease in this case.

Accommodation on site

6×6 is a decent size for a building. But the bath should not block the entrance to the house or immediately attract attention.

It is better if she stands at some distance, hidden from prying eyes by a hedge, a fence. Then next to the steam room it will be possible to put a large barrel or equip artificial pond for contrast procedures. This is if there was no place for a pool inside.

The layout options for 6×6 baths presented below will tell you in which direction to move. Or donate a dressing room, combining it with a dressing room. This will allow the steam room or pool itself to do more. Or to allocate space also for the kitchen. And then you get a small residential house with an additional highlight in the form of a steam room. And so, and so good.

What else to read