Marseille house project from wooden. Project of a house from sip panels: download a project of a frame house from sip panels

"DOK No. 1" is energy efficient house special strength for year-round living with all internal engineering communications.

  • Architectural project / passport of the house, taking into account your redevelopment (provided free of charge)
  • Monolithic reinforced concrete foundation below the freezing depth from certified concrete on granite (grade M300)
  • Terrace, porch, balcony, shed, garage, patio (included in the package according to the project)
  • External walls according to the exclusive DOK technology (construction of special strength, double insulation without "cold bridges", "ventilation gap" technology)
  • Reinforced basement and interfloor ceilings (loads over 450 kg per m 2)
  • Insulated floors with sound insulation (installation using the “blank floor” technology)
  • Internal partitions with insulation and high-quality sound insulation
  • Insulated roof with snow retention (installation using the "ventilated roof" technology)
  • Windows with window sills, ebbs and mosquito nets, five-chamber PVC profile(installation by technology " warm mounting»)
  • Steel entrance doors with insulation and anti-vandal coating

Concealed installation of internal engineering networks included in the basic package "DOK No. 1":

A change house for the builders is provided free of charge. Cleaning up the territory and removal of construction waste after completion of work.

Better to see once than...

DOK is built only from certified European materials and materials of the "Lux" class:




We initially laid the best eco-friendly materials and high-quality equipment so that you and your loved ones:
– enjoyed life in the DOK for many, many years
- do not spend money and effort on repairs and alterations in the future

NANOSPHERE Group guarantees highest quality all work performed. The work experience of our specialists in wooden housing construction is more than 15 years, for managers and key employees of the company - more than 25 years. All our builders, foremen and foremen, PTO and QCD engineers are specialists with higher or vocational construction education. Our company is a member of the SRO, so all specialists undergo annual recertification. Such a personnel policy forms the high standard that NANOSPHERE sets for the modern construction market.

The most important stage is the quality control of the materials used. We work only with official dealers. Everything Construction Materials are supplied from the internal European market and comply with European environmental standards.

We give a 10-year guarantee for the design of the DOK, and the materials used in the construction allow us to assert its almost unlimited service life. According to independent experts, our houses will last 100 years.

Construction is carried out by a team of builders of 4-5 people, headed by a foreman, within a period of 1.5 to 3 months. We work without subcontractors, we involve only full-time specialists on an ongoing basis.

In the process of work, a 5-stage quality control is carried out to ensure compliance with all technological stages building a house. Control is carried out by: foreman, foreman, QCD engineer, head of the construction department and CEO personally.

Are you looking for an affordable project? frame house, which is not difficult to build with your own hands? We invite you to familiarize yourself with the provided project of an inexpensive one-story frame house, which is specially designed for our climatic and weather conditions.

Finnish frame house project: download drawings of a Finnish two-story house project using frame technology

The project of a two-story building offered for download Finnish home frame structure- This is an option that is most adapted to domestic climatic conditions. Appearance the building built according to these drawings will be simple, but at the same time, stylish and creative. The developers of the project also carefully considered the features of the internal layout.

The project of a winter frame-panel house 11 by 12: download the drawings of the finished frame house project

On the company's website, if you wish, you can choose and then download for yourself for free interesting project frame-panel house with an attic, and then start building it. The house is fully adapted for living in it with the comfort of four or five people.

Project of a house from sip panels: download a project of a frame house from sip panels

Projects are in increasing demand frame houses that are made of sandwich panels. The demand for such structures is quite conditioned only because they cost relatively little. In addition, houses of this type can be presented in the most different form. What is the Marseille frame house project alone worth, which we took from the partner site and to which we decided to dedicate this review!

The project of a frame house 6x8 with an attic: download the project of a frame country house 6 by 8 for free

This project country house is the ideal representative of a home for horticulture, or as guest house. It combines simplicity, conciseness and rustic charm. This the best option for recreation opposite to urban concrete buildings. Since the structure of the house is lightweight, for the winter permanent residence given type doesn't quite fit. But in the summer heat is in it will be very comfortable.

The project of a one-story house using frame technology: download the finished project of a frame house

Even if a person perfectly knows the technologies for building a frame house, then without a project he will still fail. Every experienced builder knows that the building process is 90% head work and only 10% hand work. That is why we provide a wonderful project to build a frame one-story house, which has gable roof. It could take a long time to describe it. positive traits, however, it is simply impossible not to touch on its attractive style, versatility and simplicity.

1. Foundation.
screw metal supports h-2500 mm, Ø - 108 mm., the pipe cavity is filled with sand-cement mortar. Foundation binding - beam 150x150 mm along the pile head. No tides.
Foundation waterproofing - 2 layers of roofing material on top of the head.

2. First floor. Ceiling height - 2600 mm.


Floors: Floor beams - board 40 × 150 mm (treated with a fire-bio-protective compound), subfloor - OSB - 9mm. A wind and waterproofing film is laid on the subfloor.
Flooring − plywood FSF- 21 mm for vapor barrier film, underlay for laminate, laminate (assorted colors).
Ceiling: Floor beams made of board 40x150 mm, based on bearing walls. GKL - 9 mm are hemmed from below (without putty and grouting of joints) along a crate of p / m 25x50 mm.

3. Attic / One and a half / Second floor. Ceiling height - 2500 mm.
External walls: Frame from boards 40 × 150 mm. FROM outer side sheathed vinyl siding(color in assortment) according to OSB -9 mm, with insidevapor barrier film, GKL - 9 mm (without putty and grouting of joints) along a crate made of p / m 25x50 mm.
Partitions: Frame from a board 40 × 100 mm, on both sides they are sheathed with GKL - 9 mm (without putty and grouting of joints) along a crate of p / m 25x50 mm.
Floors: Floor beams - board 40×150 mm. Flooring - FSF plywood - 21 mm on a vapor barrier film, substrate for laminate, laminate (assorted colors).
Ceiling: Floor beams made of board 40x150 mm, supported by load-bearing walls. GKL - 9mm are hemmed from below (without putty and grouting of joints) along a crate of p / m 25x50mm.

4. Roof:
Rafters - board 40 × 150 mm and 40x100 mm.
Roof - metal tile (color in assortment). Lathing-board 20x100 mm.

5. Porch, Terrace (if provided by the project):
Bar racks.
Floor beams - board 40 x 150 mm. Flooring - edged board, not grooved.
Floor beams - board 40 x 150 mm. Rafters - board 40 x 150 mm.
Ceiling filing - soffits, color-white.

6. Warming:
Exterior walls: mineral wool 150 mm thick.
Basement: mineral wool 150 mm thick.
Interfloor overlap: without insulation.
Interior partitions: without insulation.
Overlapping of the second floor: mineral wool 150 mm thick.

7. Joinery:
Windows: PVC with a single-chamber double-glazed window "one leaf as a deaf", color - white, rotary, with ebbs, without window sills.
Interior doors: laminated (color in assortment), without fittings and extensions.
Entrance doors: metal, economy option.
Internal staircase: single-flight, assembly.
Entrance staircase: 3 steps from a board 40x150 mm.

8. additional information by project:
The bathroom has a sewer pvc pipe(with a tie-in into the floor of the basement floor) and with the outlet of the fan riser to the roof.
Along the stairway, a fence made of edged p / m is made.
On the porch, the fence is made of planed lumber.
There is no floor and ceiling plinth.

Delivery from MKAD 100 km free of charge.

At the time of construction, for the brigade, a change house is provided free of charge.

The “Individual” package for the Project of a house made of glued laminated timber Marseille, made of glued laminated timber, includes the following

Project documentation

In cost project documentation are included

I. Architectural section of the project

common data

floor plans

facades

cuts

Roof plan

List of jumpers

Specification of windows and doors

Smoke ventilation ducts

II. Structural section of the project

Foundation plan

floor plans

Rafter system structures

Foundation element specifications

Details and knots

Any small improvements standard project according to your preferences - carried out free of charge.

(3d-visualization of the object is possible for an additional fee)

Strip foundation (material + work)

In the cost of construction strip foundation included

  • - Carrying out marking work - breakdown of axes, installation of nodal points, leveling.
  • - Digging a trench 600 mm deep.
  • - Arrangement of sand or gravel-sand bedding with layer-by-layer tamping, pad thickness 300 mm.
  • - Reinforcement of the structure with bars d=12 mm. 4 horizontal belts are made, transverse connecting rods are made with a step of 500 mm. Reinforcing cage a knitting method is made, the corners are bent or cut off.
  • - Manufacturing wooden formwork from boards 400x250 mm.
  • - Installation of ventilation ducts for blowing underground.
  • - Concreting. Concrete of strength grade M300, supplied with quality certificate P-4.
  • - Vibrocompression during concrete works. The main mechanism is an electromechanical vibrator.
  • - Removing the formwork.
  • - Waterproofing works to protect the foundation from moisture, roofing material is used, laying is done in two layers.

Glued laminated timber walls (material + works)

The price includes

Glued profiled timber 160x185 mm. from conifers northern forest trees.
- Finnish profile timber with insulation. The castle in the cup is asymmetric, thanks to which the blowing of the walls is completely excluded.
- Fastening of wall elements using metal studs with a diameter of 12 mm, their installation is carried out to the entire height of the wall.
- Wall insulation. Mezhventsovoe warming - holofiber.
- Treatment timber walls protective compound.
- Antiseptic treatment of walls, beams, beams, rafters, battens and other elements. (additional calculation)
- Overlays - wooden beams 100x150 mm, laying step is 600 mm. The use of a bar with a section of 100x200 mm is an additional option.
- Fastening accessories: compensators, pins for tightening, perforated tape, sliding fasteners, self-tapping screws, nails, etc.
- Mounting and dismantling of scaffolding.

Doors and windows

Plastic double-chamber windows white color. Installation is carried out on a casing beam

Input steel door. Veneer/MDF finish. Insulated. (made in Russia)

Finished floors

Floors on the 1st and 2nd floor - tongue and groove floor chamber drying. (thickness 36 mm)

Warming

Insulation of the floor of the first floor - 3 layers (150 mm)

Warming floors– 2 layers (100 mm)

Roof insulation - 4 layers (200 mm)

Works are carried out using environmentally friendly basalt insulation which does not contain formaldehyde resins. Hydro and vapor barrier of the membrane is performed using Isospan.

Roofing - metal tiles (material + work)

The price includes

- Rafters are made of wooden planks size 50x200 mm. onGOST 8486-86, beam installation step -580 mm.
- Arrangement of a windproof, hydro- and vapor barrier film.
- Installation of a vapor-permeable membrane.
- Making a ventilated gap on a counter beam 50x50 mm.
- Lathing from a board 25x100 mm. onGOST 8486-86, laying is carried out with a step of no more than 350 mm.
- Metal tile sheet thickness 0.5 mm. with special polymer coating (manufacturer - not China)
- Gutter systems- Deke.

Electrical (material + work)

The list of works includes

  1. - Installation of the main switchboard with the possibility of installing up to 12 modules;
  2. - The number of points from the calculation - switch, socket, light bulb, junction box;
  3. - Installation of automatic devices, and also devices of protective shutdown;
  4. - Installation work for laying a cable in a corrugated sleeve or a special casing from the shield to consumers. These works include the installation of sockets, various switches - the devices themselves and component materials are not included in the payment price and are purchased by the customer separately;
  5. - Drilling holes in the walls;
  6. - Installation of sockets in the house;
  7. - External works on the device of the ground loop are paid separately;
  8. - Installation of fixtures - an additional option.

Plumbing and sewerage (only works)

The list of works includes

  1. - Installation of water supply. Polypropylene is used as the main material for cold and hot water supply pipes;
  2. - Installation of a water heater - equipment is purchased separately;
  3. - Installation of a hydraulic accumulator;
  4. - Mounting cleaning system water filtration;
  5. - Installation of pressure switch;
  6. - Installation of devices common use any complexity - baths, sinks, toilets, showers, and their connection to the consumer;
  7. - Mounting sewer pipe(non-pressure system), as well as the connection of the main devices to this system;
  8. - Installation of devices;
  9. - Septic tank "TOPAS" and its installation are paid separately;
  10. - Outdoor sewerage arranged for a separate fee.

Heating and ventilation (works only)

The list of works includes

  1. - Installation of the boiler on any type of fuel, the consumer chooses, operating conditions are taken into account;
  2. - Arrangement of piping of boiler equipment;
  3. - Installation according to the rules of the expansion tank;
  4. - Installation of circulation pumping equipment;
  5. - Installation of boilers of various types;
  6. - Connection installed pipes and radiators for the heating system;
  7. - Installation of radiators. Can be used different types, for example, bimetal, cast iron, steel, aluminum and - others;
  8. - Installation of heating pipes from different materials.

Also included

Preparatory work.

Preparation of documents for approval in the BTI.

Preliminary visit of the engineer to the construction site.

Study of the geology of the site for the arrangement of the foundation.

Delivery

Free delivery of all building materials within 100 km. from MKAD. Delivery over 100 km. calculated additionally.

Organization of construction works.

Change house for builders for the period of work.

In the event of a lack of electricity at the customer's site, rent of a power generator for the period of work.

Quality control.

From the first day of work, experienced foremen control the quality of each construction stage and the materials used.

As part of the insurance contract, the acceptance of all work performed is carried out by an independent expert of the insurance company.

Delivery of the object.

Export of construction and household waste from the site.

All work performed is guaranteed for 15 years!