Preparing the system for the heating season. Preparations for the heating season

In most parts of Russia, the heating season lasts 8 months. This is due to the climatic conditions of our country. First of all, the supply of heat to residential buildings and administrative buildings begins in the Arctic, and the shortest heating season in the south of the country. Before the start of the heating season, preparatory work is being carried out throughout the country, which is regulated by order 103.

What measures should heat supply organizations take?

First of all, employees of heat supply organizations are obliged to carry out work that will allow the entire heating period to be completed without accidents. Every year, by the season of supplying heat to apartments, they are not ready in different parts countries. The first problems have already appeared in Krasnoyarsk, where, as a result of a utility accident, residents of more than a hundred houses of the Zheleznodorozhny district were left without heat, and a few days earlier, residents of the central part of the city spent several hours without electricity.

In order for emergencies to be quickly resolved or completely excluded, an action plan is created in each locality of the country. Measures to prepare for trouble-free operation include:

  • preparation and compliance technical regulations use of the heating network;
  • completing emergency services and calculating the time to eliminate accidents;
  • conducting repair work on worn-out sections of the heating network;
  • checking the quality of construction of new highways;
  • hydraulic and thermal tests;
  • health monitoring automatic regulators if they are present in the system;
  • conclusion of contracts for the supply of fuel and ensuring the timely receipt and unloading of fuel.

Each heat supply organization creates its own regulations, which are checked by a special commission. They contain information about the heat supply schedule, the work plan for summer period and what to do in the event of an accident.

What are the indicators of consumer readiness?

Preparing for heating season includes checking the readiness of consumers. Each home must do the following:

  • elimination of detected problems;
  • flushing of heating networks, necessary to eliminate salt deposits on pipe walls;
  • insulation of buildings (attics and basements) and heating points;
  • scheduled repair and reconstruction of the heating network;
  • work to ensure the stable operation of the power grid;
  • checking the condition of the heating network inside the premises of consumers;
  • assessment of the performance of common house meters;
  • debt collection from consumers;
  • checking seals on elevator nozzles and design washers.

The inspection commission, in order to assess the readiness of consumers, looks at reports and acts from different areas of work. The problem is that the regulatory authorities often do not do a random check of heat supply facilities, but only look at the documentation that can be prepared in such a way that it creates the feeling of a fully completed work plan.

How Moscow prepares for the heating season

The mayor's offices of each city are trying to monitor the public utilities and set them tight deadlines for the completion of repairs. In Moscow, August 25 was the last day of preparation. Throughout the summer, the order of execution of work is controlled by employees of the mayor's office. As in every city, a special headquarters has been deployed in the capital, which was formed by the Department of Public Utilities. Assistance in the work of this communal organization is carried out by employees of the management companies, bodies executive power and industry enterprises.

The plans for preparation for the winter of 2019 in Moscow include:

  • hydraulic testing of heat exchangers and pipelines;
  • reconstruction and repair of heating networks (over the summer it was planned to restore 89 kilometers of pipelines);
  • elimination of ten bypasses;
  • checking the performance of electrical substations (if necessary, their performance is restored);
  • reconstruction and overhaul power grids (plan for 2019 - work on sections with a length of almost 10 thousand kilometers);
  • work on the reconstruction of network infrastructures.

In the capital, the implementation of measures is controlled not only by responsible persons of public utilities, but also by employees of the prosecutor's office. According to the reports of specialists from different departments, the plans were fulfilled by 70%. For example, a sufficient amount of fuel was delivered.

What needs to be done by the owners of a private house

Not all people in our country live in apartment buildings. Owners of a private house need to independently carry out preparatory work. They consist not only in the purchase of fuel for the functioning of the heating system, but also in ensuring the efficiency of engineering networks.

The owner of a private house needs to carry out the following work:

  1. Find all sources of heat loss. These vulnerabilities must be insulated with any accessible ways. The largest number walls give off heat, so they need to pay more attention.
  2. AT summer summer watch the walls - if they get wet from above, then pay attention to attic space. In the case when the walls get wet from below, it is necessary to check the waterproofing of the foundation. The walls themselves can be insulated warm plaster(for brick house) or insulation boards, which are hidden by plasterboard walls.
  3. Do your own testing of the heating system if it is installed in the house. If the premises are heated by a simple Russian stove, then it is necessary to carry out its current repairs.
  4. Check ventilation and chimney. If the draft is insufficient, then it is necessary to clean these communications.
  5. When using a heating boiler in the summer, you need to make it preventive examination and performance check. Majority modern models works with antifreeze - buy this consumable. For inspection, invite a specialist who will draw up an act of found faults and vulnerabilities of the boiler.
  6. Water supply pipes passing through cold rooms must be insulated mineral wool. If some of the pipes are damaged, then they must be replaced with new ones. Check the operation of all cranes, valves.
  7. Check the power supply system, carry out its current repairs. If there are frequent power outages in your area, consider alternative source power supply - generator. Make a supply of fuel for him.

font size

ORDER of the Ministry of Energy of the Russian Federation of March 24, 2003 115 ON APPROVAL OF THE RULES FOR THE TECHNICAL OPERATION OF THERMAL POWER PLANTS (2019) Relevant in 2018

11. Preparing for heating period

11.1. In preparation for the heating season, in order to ensure the reliability of heat supply to consumers, it is necessary to carry out a set of measures within the established time frame, the main of which are:

Elimination of identified violations in the thermal and hydraulic modes of operation of thermal power plants;

Testing equipment for heat sources, heating networks, heating points and heat consumption systems for density and strength;

Drilling of heating networks, cuttings from pipelines to determine the corrosive wear of pipe metal;

Flushing of equipment and communications of heat sources, pipelines of heat networks, heat points and heat consumption systems;

Testing of heating networks for thermal and hydraulic losses, maximum temperature coolant in accordance with the terms determined by these Rules;

Development operating conditions heat supply systems, as well as measures for their implementation.

11.2. In preparation for the upcoming heating period, defects in the operation of equipment and deviations from the hydraulic and thermal regimes are identified, work plans are drawn up, and the necessary technical documentation and material and technical resources.

Schedules for preparation for the upcoming heating period of heat sources, heat networks and heat consumption systems are developed before the end of the current heating period, but no later than May of the current year.

11.3. To ensure reliable and safe work of heat supply systems, timely elimination of accidents and prevention of their development in organizations, training is conducted on the interaction of personnel during liquidation emergencies, organizational and technical measures (instructions) have been developed.

11.4. Before the start of the heating period, heat supply organizations develop and approve in the authorities local government schedules of restrictions on the supply of thermal energy and coolant in case of taking urgent measures to prevent or eliminate accidents in the heat supply system.

11.5. To check the readiness for the heating season, upon acceptance of heat points, the following is checked and drawn up by acts:

Implementation of the repair work plan and the quality of their implementation;

The condition of the heat pipelines of the heat network belonging to the consumer of heat energy;

The state of insulation of buildings (attics, stairwells, basements, doors, etc.) and central heat points, as well as individual heat points;

The condition of pipelines, fittings and thermal insulation within the heating points;

The presence and condition of the control measuring instruments and automatic regulators;

Efficiency of protection of heat consumption systems;

Availability of passports for thermal power plants, circuit diagrams and instructions for maintenance personnel and their compliance with reality;

Lack of direct connections of the equipment of heat points with water supply and sewerage;

Density of heat point equipment;

The presence of seals on the design washers and nozzles of the elevators.

11.6. To check the readiness of heating systems and the heat supply system as a whole for operation in the heating period, trial furnaces are carried out before it begins. Trial fireboxes are carried out after completion of work on preparing the heat supply system for the autumn-winter period. The start and duration of test fires are determined by the schedule heat supply organization, which should be agreed with the local government and brought to the attention of consumers no later than three days before the start of the trial firebox.

11.7. The heating period begins if the average daily temperature of the outside air is +8 degrees for five days. C and below, and ends if within five days the average daily temperature of the outside air is +8 degrees. C and above. Turning on and off heat consumption systems is carried out according to a schedule agreed with the energy supply organization.

11.8. At the end of the heating season or during shutdown hot water boilers and auxiliary equipment boiler room are conserved. Preservation methods are selected by a specialized commissioning organization, based on local conditions, based on the recommendations of the current guidelines on the conservation of heat and power equipment and are included in the conservation instructions approved by the technical director of the organization. When hot water boilers are put into operation, as well as before the start of the heating season, heating networks and internal heat consumption systems are pre-washed.

11.9. Energy supply organizations with heat sources ensure the creation of standard fuel reserves in a timely manner.

  • Measures to prepare for the heating season for 2017-2018

As soon as the heating season ends, preparations for the next heating season literally immediately begin, that is, preparations for the cold season, which involves the implementation of certain measures. First of all, a plan of these very events is required, which fixes all the necessary work, the timing of their execution, cost, as well as responsible persons.

As a rule, even before the end of the heating season, the heat supply company is obliged to issue an order containing a list of mandatory activities to be carried out during the summer. Preparing for the next heating season, you should be guided precisely by this prescription.

Instructions for the preparation of heat consumption systems and thermal systems for the heating season 2017-2018




Heating season preparation plan

The plan for preparing for the heating season includes items that are part of the standard prescription. We list the main activities to be carried out.

  1. A person responsible for the operation of thermal power plants, as well as his deputy, is appointed. In case of technological load, a heat engineer specialist is appointed. Moreover, if the load is only on hot water supply, ventilation and heating, then the responsible person may be without special education. The appointment is made by order of the head of the company responsible for the operation of thermal power plants.
  2. The next point of the prescription is the need to undergo training and pass annual exams to the commission of Rostekhnadzor responsible person and his deputy. This item is mandatory, and without it, an order for connecting heat is not issued. A passport is required for each heating unit, this is also a mandatory item of the prescription. Otherwise, the act of technical readiness of heat-consuming installations will not be issued.
  3. In the heating unit, you need to display a diagram of an individual heating point (ITP), which is certainly available in the passport. It is necessary to carry out flushing and pressure testing, for which you need to invite a representative of the heat supply company.

Measures to prepare for the heating season for 2017-2018

In accordance with the order for 2017 - 2018 in the city of Yekaterinburg, it is necessary, in the presence of an employee of the RSO thermal inspectorate, to carry out activities with the preparation of relevant acts:

  • Hydraulic test (crimping) with a trial pressure of 1.25 working
  • hydropneumatic flushing
  • Install the missing, and revise all installed adjustment and stop valves: on distributing pipelines in basements, risers, connections to heating devices.
  • Reestablish thermal insulation on pipelines of the house heating, ventilation and hot water supply system.
  1. At the end of the procedures, an act is drawn up, signed by the heat supply organization, as well as by the consumer.
  2. During the non-heating period, pressure gauges should be checked.
  3. The next important point of the prescription is the requirements for water valves in heating point, which must be made of steel, and in no case cast iron.
  4. The prescription also provides for a scheme for arranging measuring instruments - thermometers, pressure gauges.
  5. Fittings and all pipelines in the ITP must be insulated with thermal insulation. In this case, it is desirable to paint the pipelines in accordance with one of the points of the prescription.
  6. You should also pay attention safety valve, which is placed for processing directly in front of the house valve in the direction of water movement from the house.

After fulfilling all the points of the prescription, you can hand over the heat supply system and ITP to the inspector. If everything meets the requirements, then an act of technical readiness of heat-consuming installations and heating networks is issued. And immediately before the new heating period, the final act of readiness for the use of thermal energy in the heating season is drawn up. Almost simultaneously with this, an order for connecting heat is issued.

To prepare for the heating season in order to carry out pressure testing and flushing in Yekaterinburg, you can contact SK OPTIMA. Call us right now or leave a request in the feedback form.

Video about preparation for the heating season

By September 15, 2017, persons responsible for managing residential multi-apartment buildings (MKD) are required to complete preparations for the 2017-2018 heating season. Evidence of successful completion preparatory work is the presence of the Passport of readiness for the heating period.

In the first days of July, only 37% of the housing stock, 30% of boiler houses and 37% of heating systems were ready for the new heating season.

Federal legislation on preparation for the heating season

Preparation for the heating season is regulated by Article 20 of the Federal Law of May 27, 2010 No. 190-FZ “On Heat Supply”, and the assessment of the implementation of activities is regulated by the Rules for assessing readiness for the heating season, which are approved by Order of the Ministry of Energy Russian Federation dated March 12, 2013 No. 103 (hereinafter - Order 103).

Due to the fact that there is no single law on preparation for the heating season, persons responsible for these activities must be guided by the following regulations:

  • Decree of the Gosstroy of the Russian Federation of September 27, 2003 No. 170 of the Rules and Regulations technical operation housing stock";
  • Decree of the Government of the Russian Federation of August 13, 2006 No. 491 “On approval of the Rules for keeping common property in apartment building...»;
  • Decree of the Government of the Russian Federation of July 21, 2008 No. 549 “On the procedure for supplying gas to meet the domestic needs of citizens”;
  • Decree of the Government of the Russian Federation of May 6, 2011 No. 354 “On the provision utilities owners and users of premises in apartment buildings and residential buildings”;
  • improvement rules adjoining territories approved by local authorities;
  • other orders of regional and municipal authorities.

In addition to the above regulatory legal acts, one of the most important aspects of preparation for the autumn-winter period is compliance with energy saving and energy efficiency requirements.

In accordance with the requirements of Part 7 of Article 12 of the Federal Law of November 23, 2009 No. 261-FZ “On Energy Saving ...”, the HOA or the management company are required to develop and at least once a year bring to the attention of the owners of premises in the MKD proposals for energy saving measures and improving the energy efficiency of managed MKDs.

What is included in the preparation for the heating season

The main tasks of the set of measures to prepare for the 2017-2018 heating season are to ensure the uninterrupted supply of thermal energy (coolant) to heated premises, regardless of their purpose.

Mandatory activities in preparation for winter are:

  • adjustment of intra-quarter networks with adjustment of the calculated diameters of throttling devices at the thermal unit;
  • conducting hydraulic tests, repair, verification and adjustment of heat supply and ventilation systems, boiler rooms, house networks, group and local heating points;
  • checking the performance of shut-off safety valves and pressure regulators of gas facilities.

In accordance with Order 103, report on preparations for the heating season in central regions Russia needs no later than September 15 of the current year. The terms of preparation for the heating season in the northern and eastern regions have been reduced to September 01, for the southern regions they have been extended until October 01.

Control over the entire range of measures is entrusted to local governments, owners of residential and non-residential premises in MKD, housing supervision authorities and other authorized structures.

Preparation of housing stock for the heating season 2017-2018

Comprehensive preparation of housing and communal services facilities for seasonal operation is regulated regulatory requirements for people living in the autumn-winter period.

  • elimination of cracks and holes in the outer walls, plinth, attic floors, roof and places of their docking with each other, windows or doors;
  • restoration of plaster coating, roofing, etc.;
  • putting in order the technical premises;
  • checking the integrity of window and door fillings, closers and porches;
  • carrying out trial furnaces central heating and ovens;
  • ensuring the removal of atmospheric and melt water from the descents to the basement, window pits;
  • checking the quality of waterproofing of foundations, basement walls and basement;
  • health check heating stoves and installations with gas heaters, chimneys, gas ducts, internal systems heat, water and electricity supply.

Based on these recommendations, as well as shortcomings identified as a result of the spring inspection of the MKD and its engineering systems, the management company or the HOA develops an action plan for preparing for the heating season and approves it with local governments.

Heating season preparation plan management company besides technical work includes a number of organizational activities:

  • retraining and advanced training of employees who ensure the operation and emergency repair of boiler houses, heating points, engineering systems;
  • instructing emergency service workers, maintenance workers, janitors;
  • conducting technical inspection and maintenance of vehicles, means of communication, equipment, tools, cleaning equipment, inventory;
  • preparation or restoration of schemes of intra-house engineering systems;
  • conducting an audit of thermal units, operability of metering devices (with replacement, if necessary), certification of the integrity of the seals.

In addition, when preparing for the heating season, management companies and HOAs must take into account other requirements of Rules 103:

  • the degree of readiness of heat-consuming installations for operation and their provision of the mode of consumption of thermal energy specified in the resource supply contract;
  • no debt for delivered thermal energy, coolant;

The main problem in preparing for the heating season remains the highest level debts of consumers for supplied energy resources. Debt in the housing and communal services sector is more than one trillion rubles, of which 800 billion are debts of management companies to resource supply organizations.

Mikhail Men, Minister of Construction and Housing and Public Utilities of the Russian Federation

In accordance with the Rules for the maintenance of common property in an apartment building (approved by Decree of the Government of the Russian Federation of August 13, 2006 No. 491), the responsibility for preparing in-house engineering systems for seasonal operation is assigned to the owners of residential premises apartment building(in case of direct management) or HOA and management companies. Events are funded by the owners.

Law on "alternative boiler house"

As for preparations for the 2017-2018 heating season of the heating network, control over it will be entrusted to new structures - unified heat supply organizations (ETO).

On July 31, 2017, President Putin signed the federal law“On Amendments to the Federal Law “On Heat Supply” and Certain Legislative Acts of the Russian Federation on the Issues of Improving the System of Relations in the Sphere of Heat Supply”.

The document received vernacular name“The law on the “alternative boiler house” has changed the system of regulation of heat tariffs. The new model provides for the establishment of a price limit for the coolant, which is called the “alternative boiler house”. This is calculated indicator. It corresponds to the cost of one gigacalorie of thermal energy if consumers want to build their own (alternative) boiler house.

In addition to ensuring the uninterrupted process of heat delivery from the producer to the consumer, ETOs will be responsible for the entire range of measures for the construction, reconstruction, modernization of heat supply facilities, as well as for their preparation for seasonal operation.

However, the maintenance of intra-house networks, the installation of heat meters and the preparation of the heating unit for the heating season will remain the responsibility of management companies and HOAs.

Equipping the heating unit with modern metering devices

Among the requirements for readiness for the heating season for consumers of thermal energy is Order 101, the availability and operability of metering devices, as well as the absence of debts for supplied thermal energy (power), coolant. Reliable accounting of consumed energy resources and timely payment are considered by federal law as effective ways energy saving.

As practice has shown, the installation of common building meters for heat energy has made the process of charging for a resource more transparent and understandable for consumers, has opened up for them the need and ways to save heat.

Many owners of residential and non-residential premises in MKD have gone even further: they turn to the RSO and managing organizations with a request to install individual heat meters. Including - with the possibility remote removal indications and data dispatching in real time.

This allows each owner to pay only for the heat that he actually consumed in his premises, plus the cost of ONE. In a situation where the house is equipped only with a common house metering device, the owners are forced to pay for heat in proportion to the area of ​​\u200b\u200bthe premises they own.


We help to automate the accounting of any resources: heat, water, electricity, gas.

Advantages of automated dispatching for the managing organization:

  • hourly consumption statistics online - see the demo of your personal account;
  • generation of Excel-files with hourly data on the consumption of utility resources;
  • the accountant will have all the data on hand by the 25th;
  • connection of up to 2,000,000 metering devices within a radius of 10 km without the need to purchase an additional base station, repeaters and concentrators.

The STRIZH system uses LPWAN technology with a range of 10 km, without concentrators and repeaters.

Wireless Solutions for Resource Management in Multi-Apartment Buildings

In continuation of the article.

REGULATIONS

PREPARATION AND CARRYING OUT THE HEATING

SEASON IN SAINT PETERSBURG

(as amended by the Amendments made by the protocol of the City MVK

dated 14.04.2006 N 11, Protocols of the City Interregional Commission

dated 31.08.2007 N 4, dated 25.04.2008 N 10, dated 08.08.2008 N 3)

2. Preparation for the heating season

2.1. Preparation for the heating season includes:

Identification of deficiencies in the past heating season, development and implementation of measures to eliminate the identified defects and violations;

Issuance of an order (instruction) on the results of the past heating season with the approval of an action plan for the preparation of the engineering and energy complex, housing and communal services and other buildings for social purposes for the new heating season;

Concluding contracts with contractors, resolving issues of financing and logistics;

Holding necessary work on heat supply sources, incl. inspections and tests of boilers, vessels, pipelines in accordance with the requirements of Rostekhnadzor of the Russian Federation;

Execution of work on engineering networks for reconstruction, capital and current repairs, testing and flushing, development of a heat release schedule and hydraulic mode thermal networks;

Carrying out work on the preparation of buildings, prevention, repair and replacement of equipment in engineering systems;

Performance of work on water supply systems of heat supply sources;

Preparation of fuel depots, repair of engineering equipment of reserve fuel facilities, fuel supply systems, fuel preparation, railway and automobile access roads, fire fighting facilities;

Creation of planned fuel reserves.

2.2. Works on heat supply sources must be completed:

For the repair and prevention of electricity, water and gas communications, ensuring the inclusion of heat sources in the work - until August 25;

To ensure the needs of heating during the passage of the winter maximum temperatures - until November 15.

2.3. Works on scheduled preventive maintenance of the backup fuel economy and fuel stockpiling should be completed by 1 October.

2.4. Deadline for submission to the Committee on Energy and engineering support acts of readiness and technical testing of the fuel economy - until October 5 in the form of Appendix 12.

2.5. Maintenance work, maintenance work on heating networks, inputs and in-house heat supply systems should be completed before September 1, while by August 20, the transfer of hot water supply to consumers to supply pipelines should be ensured.

2.6. Heating network in accordance with the current regulatory and technical documentation, they must be subjected to hydraulic tests for strength and density (pressure testing) and tests for maximum temperature.

The procedure for conducting hydraulic tests of heat networks for strength and density (pressure testing) and tests for the maximum temperature of the coolant is specified in Appendix 7. Acts are drawn up based on the test results.

2.7. All types of tests of thermal networks are carried out separately. In all cases, careful monitoring of all points of the heating network indicated in the test program, and operational communication between test managers, individual performers and consumers, must be ensured.

2.8. Heat supply organizations coordinate with the administrations of St. Petersburg districts and the Committee on Energy and Engineering Support schedules for scheduled repairs (shutdown) of CHPPs, boiler houses and heat networks, as well as schedules for testing heat networks, followed by informing SUE "Vodokanal of St. Petersburg", the Housing Committee and State Housing Inspectorate of St. Petersburg before May 1.

2.9. Deadline for submitting schedules for approval to the Committee for Energy and Engineering and District Administrations:

Hydraulic testing of heating networks for strength and density (pressure testing) at the end of the heating season - until April 15.

The term of coordination of schedules is no more than 2 weeks.

2.10. In the schedules for the repair of heat networks and sources of heat supply, a break in the supply of hot water to consumers may be allowed in agreement with the administrations of the districts for a period of not more than 15 days. Shutdowns of hot water supply for a longer period or repeated shutdowns associated with the reconstruction, repair and testing of heat supply sources and heat networks are agreed with the administrations of St. Do not allow DHW shutdown during the periods from May 20 to June 10 and from August 15 to September 1.

(clause 2.10 - as amended by the Protocol of the City Interregional Commission dated 08.08.2008 N 3)

2.11. Heat networks after installation, overhaul and reconstruction should be subjected to hydraulic flushing. After performing emergency work on heating mains, heat supply organizations are obliged to carry out hydraulic flushing of these sections of networks.

The volumes of network water consumption for flushing central heating, ventilation and hot water supply systems of buildings with network water are recorded according to a separate act.

Flushing is considered completed when, during inspection of the samples taken at water consumption by representatives of the subscriber and the heat supply organization, the color of the water at the drain must match the color of the source water.

Responsibility for the quality of flushing of heating networks rests with the organizations operating these networks, and for the systems of central heating, ventilation and hot water supply of buildings - with the owner of the thermal power plant.

2.12. Owners of heating networks, inputs, in-house systems, before April 30, coordinate with heat supply organizations the schedules for their presentation for readiness for the heating season. The timing of the preparation of networks, inputs, in-house systems should be linked to the schedules for repairs of heat networks and heat supply sources. Agreed schedules for the presentation of objects of readiness for the heating season are submitted to the administration of the districts of St. Petersburg.

2.13. Heat consumers in the process of preparing for the heating season carry out:

At the end of the heating season, an inspection of the technical condition of buildings and their engineering equipment with filling out a passport of readiness of the object for work in winter conditions according to the results of the spring inspection. Finally, the object readiness passport is issued based on the results of the autumn inspection in the form of Appendix 11;

Works on the prevention and repair of intra-house systems, inputs and intra-quarter networks, which include:

Necessary work on preventive measures and troubleshooting and damage. Responsible for the good condition and safe operation thermal power plants determines the necessary amount of repair to maintain the equipment of central heating, ventilation and hot water supply systems of buildings in good and operable condition,

Mechanical cleaning or chemical washing of heaters,

Cosmetic repairs of premises of heating points,

Revision or replacement of shut-off valves of a heat-consuming installation or a heat input,

Flushing of central heating systems by hydraulic method annually and hydropneumatically 1 time in 2 years (Appendix 8),

Flushing of intra-quarter networks and inputs that are on the balance of the subscriber,

Pressure testing of house systems, elevator nodes and intra-quarter networks that are on the balance of the subscriber, for pressure in accordance with the current Rules,

Fabrication and installation of diaphragms and nozzles according to calculations submitted by heat supply organizations, taking into account the results of adjustment in the past heating season. The installation is carried out by the heat consumer under the control of the heat supply organization,

door insulation, staircases, attics, basements, internal wiring, restoration of locks on the doors of premises of heating points, attics, water metering units,

Creation of a normal temperature and humidity regime of attics and basements,

Insulation of water metering units at water inlets,

Installation in accordance with the technical documentation in central heating points, elevator nodes and heat points that are on the balance of the subscriber, control and measuring instruments and devices for regulating and accounting for heat supply, performing the work specified in the instructions of the territorial body of Rostekhnadzor, as well as work stipulated by the terms of the concluded heat supply contracts,

(as amended by the Protocol of the City MVK dated August 31, 2007 N 4)

Testing of inputs of power supply of residential buildings and brownies electrical networks, including checking fuses and circuit breakers for compliance with the project.

The person responsible for the good condition and safe operation of thermal power plants is responsible for organizing work on the preparation of heat consumption systems for buildings and heat networks that are on the balance sheet of the subscriber, and for complying with the requirements of safety regulations.

2.14. Acceptance of heat consumption systems after the completion of the work listed in clause 2.13 is formalized by an interim act, taking into account the identified comments. Subject to the elimination of comments on the interim act, staffing with trained and certified personnel, the readiness of facilities for heat supply is confirmed by a bilateral act in the form of Appendix 10. Heat consumption facilities must be prepared by September 1.

2.15. After preparation of heating systems, its conservation is carried out by filling network water with disconnection from the external network, if necessary - with the installation of plugs.

2.16. The inclusion of heat consumption systems without acts of checking the readiness of the object by the heat supply organization is not allowed.

2.17. Newly connected and reconstructed heat-consuming installations of consumers must comply with the technical conditions for connection, made in accordance with project documentation agreed in in due course with the heat supply organization and the territorial body of Rostekhnadzor.

Prior to the commissioning of thermal installations and heating networks, the customer, together with the contractor, conducts the tests, adjustment and flushing provided for in the design documentation in the presence of a representative of the heat supply organization and an inspector of the territorial body of Rostekhnadzor.

2.18. Preparation for the heating season of heating networks, central heating points, pumping stations, central heating systems and hot water supply of new buildings that are not accepted for operation by specialized organizations is provided by construction organizations. All necessary inserts in engineering Communication must be completed by October 1st.

2.19. The organization - the supplier of natural gas, the gas distribution organization and Rostekhnadzor in St. Petersburg develop quarterly schedules for switching consumers to reserve fuels during cold snaps, approve them in the Committee for Energy and Engineering 25 days before the quarter for which they are calculated, and 15 days are sent to the enterprises involved in the schedules.

2.20. The readiness of energy supply organizations to work in the heating season is assessed in accordance with the Regulations on the assessment of the readiness of electricity and heat supply organizations to work in the autumn-winter period.

Readiness of residential and public buildings for operation in the heating season is confirmed by passports (Appendix 11), which are issued before September 15 on the basis of acts of checking the readiness of the object by the heat supply organization, State Unitary Enterprise "Vodokanal of St. nine).