A fence made of corrugated board and brick is one of the most popular design options. Reliability is ensured by stiffening ribs of metal sheets. The combination with brick allows you to create an attractive fence around the site, especially if you choose. In addition, the installation price is quite reasonable.

Calculation and design

The most preferable option is a fence with a strip base. This solution has several advantages: creating a barrier for rainwater, which under normal conditions easily penetrates the site; providing higher levels of strength and durability.

If desired, you can make a foundation of different widths under pillars and corrugated sheets, which will reduce the cost of building materials (concrete mix, reinforcement). Reducing construction costs can be achieved in another way, for example, if a fence made of brick and corrugated board along its entire length is characterized by a single small width. Then the racks should be smaller in cross-section.

You should pay attention to the area itself. If there are differences in levels, it is necessary to build a foundation different heights in areas where the rise is most noticeable. First, markings are made, for which a rope or nylon cord and posts are used. At this stage, the location of the wicket and gate should be considered.

When a brick fence with corrugated sheeting is designed, the depth of digging the trench under the base is also calculated. You need to focus on the level of soil freezing. Therefore, a foundation depth of 1 m is considered sufficient.

For various reasons, this is difficult to implement: it is labor-intensive and requires significant financial investments in building material. There is also a solution in this case, for example, if the base of the fence is scattered, then the deformation of the material due to thermal expansion will not affect the quality and functionality of the fence.

At the design stage of a brick fence with galvanized corrugated sheeting, the width of the span between the posts is determined. For structural strength, metal pipes are installed in the center of the pillars.

Foundation arrangement

First of all, the formwork is prepared for pouring the concrete mixture. For this purpose, wooden blocks (25 mm wide) are used. The material is laid in such a way that the formwork rises above the trench by about 10 cm. It is necessary to ensure that the top board is parallel to the marking thread.

Corrugated fence with brick pillars will last a long time only if reinforcement is installed, and this must be done correctly: the minimum permissible distance from the rods (diameter 8-12 mm) to the formwork is 30 mm. If this rule is not followed, the risk of corrosion increases.

Scheme strip foundation

Vertical rods are attached at the top and bottom at a distance of 1.5 m. To connect the reinforcement, knitting wire or welding is used. Once the installation of the rods is complete, you can begin installing the pipes in the areas where the pillars will be erected.

To strengthen the fence structure, they need to be secured with metal corners. Concrete mixture: sand (3 shares), crushed stone (6 shares), M400 cement (1 share), water (0.75 shares).

In addition, a small amount of plasticizer is added (0.1% of the total amount of cement). At home, you can use ordinary liquid soap. Crushed stone and sand are laid at the base of the trench before pouring. Both layers are 10 cm thick.

Installation of a frame made of profiled pipes

The pillars at the base of the brick racks also perform another function - logs are welded to them, onto which a corrugated sheet is already attached. Dimensions of rectangular pipes: 40x40x2 mm. Budget option– 40x25x2. The logs are cut to the required length, which is determined by the distance between the posts. First, you need to slightly grab the pipes to determine whether they are installed correctly by building level. Then strong welding is performed.

The recommended number of logs for one profiled sheet with a height of up to 1,800 mm is 2 pcs. If the fence is planned to be larger, use 3 pieces. The outermost pipes should be located at a distance of 20-25 cm from the edges of the corrugated board. To prevent the structure from corroding, it must be primed and then covered with paint and varnish.

Brickwork

It is difficult to guarantee the accuracy of this work without experience. However, it is quite possible to erect brick pillars on our own. First of all, waterproofing of the foundation is ensured in the areas where the first row of bricks is installed.

For this you can use ordinary roofing felt. Each subsequent row is tied metal mesh, which will strengthen the structure. You need to work with a solution: 1 share of cement, 3 shares of sand.

The voids inside the brick pillar are filled with the same mortar as it is erected. Thanks to these actions, fences built from brick and corrugated board become stronger, which means their durability is ensured. At the end of the work, you need to cover the pole with a decorative cap: made of concrete or metal.

Installation of profiled material

For the construction of the fence, wall or universal profiled sheet of grade C or NS is used. Fastening to the joists is carried out using galvanized roofing screws with a rubber gasket.

If a material with a different coating is used, the fasteners must match it in color. First you need to make markings on a profiled sheet. To avoid damaging the foundation, it is covered woven material or cardboard.

The fastener is installed in the cavity of the profiled material. These actions are performed using a screwdriver/drill. The joining of two sheets is done with an overlap. To determine the amount of fasteners, you should know that 6 screws are required per 1 m of metal sheet.

Fences made of corrugated board and brick have a long service life. But during installation there is a high probability of damage to the anti-corrosion coating of the profiled sheet. If there is a scratch, it can be covered alkyd paint. This will avoid changes in the properties of the material in this area under the influence of corrosion processes.

We must not forget about the need to install gates and wickets. To do this, it must be possible to install embedded fastening elements in the brick pillar. An important nuance is to ensure protection of the edge of the corrugated sheet, for which a decorative strip is used. Safe working conditions should be organized: when welding, as well as cutting metal structural elements and bricks, you must wear protective glasses/gloves.

If you use a drill to fasten corrugated sheets, you need to use it at low speeds. Otherwise, there is a high risk of grinding cutting edge fasteners, and also ensures overheating of the tool.

Thus, fences made of brick and corrugated board look solid, last a long time, and, most importantly, their installation is relatively inexpensive. All installation work can be done on your own. The most difficult stages: correct laying of the foundation; welding work profile pipes, which are attached by directly using the building level; erection of brick pillars. But you can fasten the sheets of corrugated sheets without unnecessary difficulties.

Today, on the market of enclosing structures there are many proposals using the most different materials(wood, metal, concrete, PVC), but perhaps the most durable of them is a brick fence.

With all its advantages, this type of fencing has only one drawback - high price. Therefore, experts recommend combining brick with less expensive materials. The best example of such a union is a fence made of corrugated sheets with brick pillars. Detailed instructions with photos and videos about installing such a fence with your own hands are presented in this article.

The construction of a fence made of corrugated sheets with brick pillars with your own hands should begin with drawing up a project. At this stage it is important to consider the location of the gates and entrance gate, as well as technological recommendations:

  • The step between spans should be 2.5-3m;
  • The fence must be placed strictly along the perimeter of the site;
  • Monitor the level of soil slope; if necessary, divide the fence into segments according to height differences.

Construction stages

I. Marking the area for the future fence.

Before you begin, it is important to check the site plan and then lay out pegs around the perimeter of the site. The cord is stretched tightly between the marks, perpendicularity is checked (using the diagonal method), and then, using a level, the absolute “0” of the structure being built is found.

II. Manufacturing of metal-concrete structures.

As the strings are stretched and leveled, depressions are formed in the ground. The recommended depth of concreted pits for pillars should exceed 1 m, which in the cold season should prevent deformation of the enclosing structure (usually buried to a soil freezing depth of 1.5 m).

If you want to strengthen the fence or add some structural originality, you can place a strip foundation between the pillars (to a depth of 50 cm). In this case, you should take care of durable formwork. For its walls, you can use both wood and OSB with a thickness of more than 100 mm. To fasten the formwork, use a transverse beam, which is dug into the ground at one end and nailed to the shield itself at the other.

At the next stage, you need to take care of tying and installing the reinforcing frame into the formwork. The best way to make this frame is suitable fittings made of fiberglass (diameter 10mm) and knitting wire. We form the frame of the parallelepiped according to the dimensions of the recess.

Next, metal stiffening ribs are installed at the base of the future pillars. After that, fastenings are fixed between them, creating a fencing frame. We complete this work by directly pouring cement mortar (grade no lower than M200) into the existing recesses.

III. Laying bricks for fence posts.

To carry out this work, you can use any moisture resistant brick, but ideally you should choose beautiful decorative samples. It is recommended to tie each layer of brick with a metal mesh, applying an even layer of mortar on top. Be sure to use the level! Either a cement or metal cap should be installed at the top of the support post.

IV. Fastening metal profile sheets to the fence frame.

Sheets of corrugated sheets are mounted on the fastenings protruding between the support posts (logs made from a 40x20 mm profile pipe) using galvanized 5x30 mm self-tapping screws or 3.2x10 mm steel rivets.

Upon completion, all metal elements and welding areas should be coated with a primer to prevent corrosion.

Photos of corrugated fences with brick pillars

See photos of fences made of corrugated sheets with brick pillars, made by yourself:

Video of installing a fence made of corrugated sheets with brick pillars

Watch the video of installing a metal profile fence with brick pillars with your own hands:

BUILDING A FENCE Laying brick pillars for a fence

A brick fence is the most solid and high-quality structure, the only drawback of which is its high cost.

To reduce the cost of the project, it is advisable to combine bricks with inexpensive, but no less durable materials.

Let's look at the construction of a fence made of brick and corrugated sheets with our own hands in detail and in stages.

Selection of design and materials

Before you make a fence from brick and corrugated board, you need to draw up a project with a description design features and the location of the fence.

When drawing up a plan, you should adhere to the following recommendations:

  • The distance between brick pillars of a corrugated fence (span width) should be at least 3 meters.
  • The fence is placed strictly in accordance with the land plan.
  • On sloping terrain, individual sections are divided into sections with differences in height.
  • Concrete mixer,
  • Welding machine,
  • Crowbar and shovel,
  • Drill, electric drill and screwdriver,
  • Screwdrivers,
  • Metal scissors.

Profiled sheets of polyvinyl chloride create a durable fence that is not subject to corrosion and wear.

this article

Brick corrugated sheeting painted with modern paints and varnishes does not lose color for a long time, which can be matched to the tone of the building.

Construction of corrugated fences with brick pillars happens in stages:

  • The perimeter of the area is measured,
  • The foundation is being prepared
  • Columns are made
  • Profiled sheets are fixed.

Click to enlarge

The construction of a fence made of corrugated sheets with brick columns begins with marking the exact location of the elements.

At the future corners of the fence, you need to place pegs and stretch a nylon thread along them.

The narrowest corrugated fence with brick pillars is built one brick thick, and a profile pipe is installed for reinforcement.

Every second row of brickwork is reinforced with steel mesh.

A fence made of brick and corrugated sheets is installed on a strip foundation.

To save on transport, the top layer of soil can be dumped and used as fertilizer on the site.

The volume of soil will be only about three cubic meters, so an expensive excavator will not be needed to carry out excavation work. Handmade are carried out with shovels and bayonet shovels; a crowbar is also useful.

If the soil is not rocky, a trench with a volume of about 4 cubic meters will be dug by two workers in 5 hours, taking into account smoke breaks.

When the trench for a brick fence with corrugated sheets has already been dug, you can immediately begin formwork. It is assembled only for the base part and is installed 10-20 cm below ground level. A durable and inexpensive semi-edged board is suitable.

Assembly of the formwork begins before pouring the foundation with additional fastening of the boards with wooden lintels and brick supports. The shields are assembled directly in the trench, starting from top board.

10mm reinforcing bars

For further reinforcement of the foundation, 10 mm reinforcing rods are needed, which are installed in the trench every 1.5 meters.

The assembled frame, fastened with 1 mm thick wire, is lowered into the formwork.

To strengthen the brick pillars, a corner or pipes are installed into the formwork when the rod frame and formwork are completely ready. They are leveled and secured with boards.

The thickness of the foundation may vary: under the pillars the width can be as planned, but under the corrugated sheet it can narrow. This way you can reduce the amount of excavation work and save concrete. True, then it is much more difficult to assemble the formwork.

The optimal foundation depth for fence posts is the depth of soil freezing, that is, about a meter.

Under corrugated sheets, where the fence will experience less load, the depth of the foundation is reduced to half a meter.

Depending on the terrain, the foundation for the fence is poured differently. The most difficult thing is installing a fence on an uneven area.

To build a fence you will need to use a concrete mixer:

After pouring, the concrete is covered with polyethylene so that the surface dries evenly with the base. In warm weather, complete stripping is carried out after 7 - 10 days.

The brick is laid with cement-sand mortar in a ratio of 1 to 3, and a little liquid soap is added to make it plastic.

Type of bricklaying

Every day they lay no more than 0.5 meters in height, simultaneously filling the gap between the metal column and the brick.

For strength, each row is reinforced with a special mesh.

When erecting a fence made of brick and corrugated sheets with your own hands, you need to remember that the distance between the brick supports should not exceed 3 meters.

The height of the fence depends on the design of the site, wind load and the height of the profiled sheets.

When securing the fence, brick pillars and corrugated sheets, use embedded plates and corners in the center, top and bottom of each post.

As an alternative, you can make a fence with concrete pillars. This design will be much more reliable and will last longer.

For reliable fastening of a 3-meter sheet, 3 lags are enough.

More detailed instructions and a description of all types of foundations for corrugated fences can be found here.

Galvanized steel covers are installed on top of a fence made of corrugated sheets with brick pillars, which will give the pillars a finished look and protect them from water. They are attached from below with dowels to the brick.

When choosing concrete caps, pay attention to those painted with mineral pigment.

This paint does not wash off, and the color does not fade over time. They are laid on columns with cement-sand mortar.

After 2 days of concrete settling in the formwork, a frame is assembled from a profile pipe, to which the corrugated sheet will be attached.

The pipe is cut into pieces of the required length, on which marks are placed at the places where the horizontal pipes are attached. The correct position of the pipe is checked using a level.

The frame is assembled by 2 workers. After welding, the frame is painted with alkyd enamel.

  • The installation of a fence made of corrugated board and brick is completed with the installation of a profiled sheet.
  • The foundation is first covered with cardboard so as not to damage the bottom edge of the sheet.
  • The places for screwing in self-tapping screws are marked at a rate of 6 pieces per meter.
  • The corrugated sheet is attached with a drill at low speeds to the profile pipe in the lower part through each wave using rubber gaskets. The sheets are overlapped.

A 15-meter brick fence with corrugated sheeting can be erected in about 2 weeks. Beautiful fence It is quite possible to install bricks and corrugated sheets with your own hands, and hire a specialist only to install brick pillars and construct the frame.

Now you know how to build a fence from brick and corrugated board. Such a fence is not as affordable as a fence made from one corrugated sheet, but the installation of fences made of corrugated sheets with brick pillars is done for beautiful design with a combination of reliability and long service life.

The times of earthen ditches, high walls and drawbridges to protect their possessions have long sunk into oblivion. To modern man it's enough to be beautiful strong fence, and his cozy home world will be securely closed from the winds and uninvited guests. How to make a worthy choice from the whole variety of designs offered by the existing market?

In our opinion, a fence made of corrugated board has a good price-quality ratio. The procedure for building a fence from corrugated board with your own hands with brick pillars and step by step photos brought to your attention today.

Such structures are light, easy to install and have a decent appearance. For successful construction we will need:

  • pegs
  • light sledgehammer
  • construction tape
  • level
  • bayonet shovel
  • shovel
  • hammer
  • screwdriver
  • nails
  • board and timber for formwork
  • fittings
  • knitting wire
  • welding machine
  • hinges for gates and wickets
  • primer for painting the frame
  • concrete mixer
  • profile pipe 60x60 mm n=2.8 m
  • profile pipe 40x20 mm
  • corrugated sheet S-8
  • gate and wicket frames.

A step-by-step diagram for building a fence from corrugated sheets will look like this

Removing the old fence

If it is made of brick or stone, it can be carefully disassembled and a completely suitable building material for the future can be obtained. A wooden fence can be moved deeper into the yard, maintaining its perimeter if possible. It can still serve as a temporary fence while our construction continues.

Brick left over from dismantling old gate posts and moving a wooden fence.

Choosing a fence design

First of all, you need to decide on its exact location, the width and level of the foundation, as well as the place for the gate and wicket. To do this, we hammer pegs into the corners of the proposed fence and stretch a nylon cord between them. Then, based on the width and number of profiled sheets per span, taking into account their overlap, we mark the spacing of the support posts.

The width of the corrugated sheets is 119 cm. pure form excluding the overlap in one wave of 115 cm. We take measurements using a tape measure, draw up a plan for the fence in our heads and transfer it to paper. This must be done, because as you complete earthworks our pegs will be removed.

The example considers the option of a fence with posts made of facing bricks, reinforced with pipe 60x2 mm. For wicket and gate posts, increased reinforcement with an 88x2.8 mm pipe is used.

We design the foundation

We will perform it in the form of a continuous strip of reinforced concrete. Simply put, we will make a strip foundation. The advantages of such a foundation are obvious:

  1. solid appearance;
  2. protecting the area from rainwater from the street and stray animals.

We select the width of the foundation according to the size of the side of the brick column, the design of which will be discussed later. If you have differences in the height of the relief on your site, then performing the foundation at one level will lead to very high consumption concrete. In this case future design divided by length into separate areas. Each of them will have its own level of foundation. In this case, the height of the fence can be left the same. Corrugated sheets are sold in any length upon request.

To prevent dirt from accumulating on the foundation during rain, it should be raised above the ground level by at least 10 cm. You can also reduce concrete consumption by making the tape width unequal. For example, there is one under brick columns, and another under profiled flooring. On the other hand, this complicates the assembly of the formwork. Decide for yourself here.

The foundation for brick columns must be laid below the freezing mark of the soil, this guarantees the immobility of the entire concrete structure. As a consequence, we get normal work gates, which are attached to the pillars through embedded parts welded to the reinforcing pipe. In less critical places that do not bear a large load, metal racks can be buried 0.5 m into the ground to save concrete.

We carry out excavation work

This process is performed with ordinary shovels. It is advisable to have two of them. A bayonet shovel is used for digging a trench, and a shovel is used for cleaning it. We carry out the trench for the foundation exactly according to the planned plan, with the exception of its width. We make this size a little larger for ease of installation of the formwork. Most of The excavated soil will have to be packaged in 50 kg bags and taken away. Approximately 30 bags will be needed per 1 m3 of soil. A smaller part of the soil is needed to backfill the cavities of the finished foundation. For 1 m3 of soil sampling performed by two workers, it takes a little more than an hour.

Assembling the formwork

We assemble it for the base of the future foundation and its part located 10-20 cm below the ground level. We use a semi-edged board, pieces of timber, an electric drill and wood screws. The topmost board of the formwork panels is installed along a cord marking the level of intended concreting.

The poured concrete puts quite a lot of pressure on the formwork walls. Therefore, wooden panels must be reinforced with jumpers made from scraps of timber and fastened together at the top. Brick supports will also not be superfluous.

We assemble the reinforcement frame for our formwork on the ground, it’s more convenient. For work, rods D = 10 mm are used. The horizontal component of the frame is made of 4 rods. The bottom two rods are located at a distance of 10 cm from the bottom of the trench, and the remaining two are located on top, 5 cm below the concrete surface. As vertical reinforcement, cut rods are used, which are knitted with wire in increments of 1.5 m along the entire length and perimeter of the frame. The gap between the side formwork and the reinforcement is made at least 3 cm. This is necessary to protect the metal of the product from corrosion.

All. We lower the assembled frames into the formwork and connect them together with an overlap of 20 cm along the longitudinal rods with knitting wire.
Now we need to install pipes to strengthen the strength of the brick pillars. We perform this operation like this. We lower the pipe vertically into the formwork and fix its position using a level with scraps of board or timber. It's not difficult, you can do it alone without help. All other pipes, having previously leveled them, can simply be lightly concreted in holes 50 cm deep. A solid concrete foundation strip will finally secure all the racks.

In our case, after dismantling the old gate posts, a powerful foundation of the gate part with huge embedded parts remained.

We have shortened them. Using a hammer drill, we made small pits nearby, into which we installed support posts with eyes for hinges, welding them to cut-off mortgages.

Installation of a gate post to the embedded part of an old foundation

Using the same hammer drill, we made a shallow trench between the gate posts and connected them together with a 40*40 angle using welding.

The gate posts are installed. The trench is ready for installation of formwork. The posts are exposed and lightly concreted.

We carry out concrete work

Mixing the concrete mixture can be done with or without a concrete mixer. Let's consider both cases.

You have a concrete mixer.

We install our unit closer to the formwork to make it easier to carry heavy concrete. Before filling the dry mixture components, the working container of the concrete mixer must be tilted at an angle of 45 degrees. The composition of the concrete mixture will be as follows:

  • cement (PTs-400) – 1 part
  • sand - 3 parts
  • crushed stone – 6 parts
  • water – 0.7 parts
  • air-entraining additive – 0.1% by weight of cement (liquid soap).

To reduce concrete preparation time, the mixer should be loaded to ½ its volume. Then we proceed as follows. First, pour all the crushed stone into the concrete mixer. This is the largest filler. Therefore, it will wash away the remaining mixture from the previous batch and prevent wet sand and cement from sticking to the walls of the container. Then fill in half the required amount of water with liquid soap. Mix crushed stone with water and add half of the sand.

Mix everything again for a minute and set the mixer at an angle of 70 degrees so that dry sand and cement do not stick to its wet walls. At the penultimate stage, all the cement and the rest of the sand are poured. After mixing, lower the concrete mixer again to 45 degrees and fill in the rest of the water. 2-3 minutes of mixing and you can unload the finished concrete.

Installed concrete mixer

You don't have a concrete mixer

In this case, you need to find a trough with a capacity of 100 liters, or a sheet of metal 1.5 x 1.5 m. But it is more convenient to prepare concrete in a special tub.

  • fill three buckets of sand and one bucket of cement
  • We make a dry mixture from these components using a garden rake.
  • Lather 10 grams of liquid soap in a bucket from a hose filled with water.

In a full bucket, abundant foam should form on the surface of the water. It is needed for plasticization, convenient mixing and laying of concrete.

  • add this water to the dry mixture and mix everything again
  • pour 6 buckets of crushed stone onto the moving solution
  • After the last shoveling we get ready-made concrete.

Manually kneading the material will reduce its future strength by 20% due to the increased amount of added water. You can’t do without this - the mixture will be difficult to mix. But there is no need to worry. For a foundation for a fence, a slight decrease in the strength of concrete will not play much of a role.

After pouring the mixture into the formwork, the future foundation must be covered with a polyethylene film. This is due to the fact that when it dries quickly, cracks may form on its surface. We don't need this at all.

Concrete poured formwork

After a week of warm weather, the formwork can be removed.

We assemble the frame of our fence from corrugated sheets

Welding of the frame can begin a couple of days after pouring the formwork with concrete. The frame is made of 20x40x2 mm pipes, which in the fence design are transverse logs for attaching profiled sheets to them. It is more convenient to assemble the frame with two people. The order of our further actions is as follows:

  1. we measure the actual distance between the vertical posts along their axes;
  2. using a grinder, we cut the profile pipes into sections according to the measurements;
  3. on the posts, we mark with a marker the location of rows of horizontal logs 30 cm from the upper and lower edges of the fence;
  4. We apply sections of profile pipes one by one to vertical posts along the marks and lightly tack them by welding;
  5. we check the horizontal position of the pipes with a building level;
  6. We perform final welding of the lags.

Welding a corrugated fence frame

At the welding stage, it may appear small problem with home automatic switch. This is due to the fact that maximum power welding machine 6.5 kW, and in everyday life 15 ampere switches are usually used. It is possible that they will need to be replaced with machines of higher power.

After completing the welding work, the racks and joists must be cleaned of rust and painted with PF-115 alkyd enamel.

Laying brick pillars

For a fence 2-3 m high, the usual cross-section of the pillars is 380x380 mm, i.e., one and a half bricks. In the example, they are performed only on the front side of the house facing the main street. This is usually done for reasons of cost savings. If you are not skilled in construction God's gift, then for laying brick columns it would be better to hire an adequate mason - a veneerer.

First row, beginning of the construction of brick columns

Required for masonry facing brick to your taste and color (fortunately, there are a great many varieties), cement-sand mortar, masonry reinforcing mesh and tools.

The solution is prepared in a parts ratio of 1:3 with the addition of liquid soap for its plasticity. Bandaging and horizontal seams, strict vertical angles in the process of working on the pillar must be strictly observed. When laying bricks, it is important not to forget about the embedded parts for the gates, wickets and spans of our fence. They are welded to a metal gate post, 2 pieces on each side of the post, and then carefully lined with trimmed bricks. It is advisable to reinforce the brick rows of gate pillars with steel mesh.

The laying of all pillars is carried out in turn, 0.5 m of their height per working day. During this process, the empty spaces between the brick and the metal stud are filled with masonry mortar.

We raise the columns.

At the same time, using a nylon cord, the coincidence of the brickwork seams along the entire length of the spans is monitored. To emphasize the beauty and correct geometry of the forms of our finishing material it would be appropriate to perform decorative cutting brick seams special tool. The color of the seams can be adjusted to your taste using various pigments.

The brick pillars are almost ready.

To protect the upper parts of the pillars from rain and snow, they are covered with caps made of concrete, metal or plastic. High-quality concrete caps will serve you for more than 15 years. They are installed on the mortar intended for masonry.

A protective cover is installed on one of the posts. Protection made from other materials is secured at the bottom to the finished posts using dowels.

To make it even more important, you can mount lighting or an alarm system on the poles. That's it, the brick columns are laid out. And it doesn’t matter so much whether you did it yourself or with the help of a hired specialist. The main thing is that we are finally moving on to the last stage of construction of our corrugated fence.

We mount profiled sheets on a metal frame

It is more convenient to install corrugated sheets together. Before fastening begins, cardboard should be placed on the foundation in the span between fence posts or posts. This is necessary to avoid scratching the bottom ends of the sheets. There is no need to screw in the screws at random. They should be arranged in even rows. Therefore, before installation on the sheets, it is necessary to make appropriate marks using a marker. For fastening you need galvanized roofing screws with rubber gaskets 4.8x30 mm and an electric drill with an attachment. The sheets are attached to horizontal logs made of pipe 20x40x2 mm, and overlapped with each other.

Fastening corrugated sheets to the fence sheathing.

To attach a profiled sheet, you need to tighten the self-tapping screw connecting it to the pipe. bottom part sheet corrugations. And so on, through one wave. Thus, to fasten 1 m of corrugated sheet we will need 6 self-tapping screws.

One important detail. It is better to tighten the fasteners at low speeds of the drill. Otherwise, the edge of the screw will grind off when heated.

View of the side part of a fence made of corrugated board.

After installing the last sheet, you can quite rub your hands together. The construction is finished, there is a beautiful fence in front of my eyes, you can do it general cleaning territories.

View of a fence made of corrugated board with brick posts without protective covers. The gate was raised at the owner's request.

If desired, the foundation strip of the new fence can be plastered, painted or tiled.
The rems-info.ru project wishes everyone good luck in construction!

Related materials:

Your task is to create good fencing your country house...

Buying suburban area, you need to take care of a lot, at least start with the fact that you need to build a fence, isolate yourself from the outside world. Many people prefer to overpay and hire workers for this process, doubting their abilities - not entirely correct option. After all, it is unknown how the workers will do it, how long such a fence will last, and the amount will be quite considerable.

Corrugated sheeting is perfect for building fences

We build it ourselves

That is why we suggest that you build a fence made of corrugated sheets with brick columns with your own hands. To make it easier to study this process, all stages will be divided into several sections. Don't skip any of them, even if you know what they are about.

Purchasing tools

To build a fence from corrugated sheets, first of all, you need to prepare all the materials and tools that are required for the work process:

  • Container for cement mortar. An electric concrete mixer is an excellent option.
  • Drill with mixer attachment.
  • Trowel.
  • Spatula.
  • Hammer or mallet.
  • Screwdriver.
  • Construction level.

Note! Twine is also useful, with which you can easily check the horizontal and vertical line fence

  • Cement with sand for preparing mortar.
  • Facing bricks.

You will have to choose from several dozen different options

  • Metal corner for fastening corrugated sheets.
  • Metal pipe for vertical posts.
  • Sheets of corrugated sheets.
  • Metal rods with a diameter of no more than 10 mm.
  • Self-tapping screws for metal.

It is best when the screws have a rubberized washer

For your information! Metal profile can be replaced with wooden blocks, their price is much lower. However, wood also has a drawback - fragility. It easily deteriorates due to abundant moisture: rain and snow.

Preparing the area

How to build a fence from corrugated sheets with your own hands? So, everything in order.

Before erecting brick pillars for a corrugated fence, it is necessary to make indentations in the ground.

  • The first step is to measure the span distance. To do this, you need to measure the corrugated sheet, as dimensions may vary.
  • Stretch the string from one corner of the site to the other so that there is a straight line.
  • Mark on the ground the places where the posts will be installed.
  • Dig holes in the ground about 1 meter.

Note! If the spans are 3 meters or more, then be sure to install an additional metal support in the center. In these places it is enough to dig 50-60 cm.

To increase reliability, you can lay a strip foundation between the pillars:

  • To do this, you need to dig a trench about 40 cm deep and no more than 20 cm wide.
  • Then install the formwork using old boards. Chipboard panels or plywood, which are easiest to cut to size, are best suited.
  • Small pieces of reinforcement are driven into the dug trench. The distance between vertical pins should be no more than 800 mm.
  • Using welding or wire, all rods are connected with horizontal reinforcement.
  • Now all that remains is to pour sand and crushed stone into the recesses, compacting it thoroughly.

Do not forget about the possibility of erosion of the base; it should be made as strong as possible, because the durability of the future fence depends on this.

Fill the solution

Don't know how to cook quality concrete for building a fence from corrugated board? This instruction will help you with this:

  • First of all, pour water into the container.
  • Then add cement (it is better to use the M400 or M500 brand). The ratio is approximately this: for one kg of cement, about 700 ml of water.
  • Now add sand in a ratio of 3 to 1.
  • Crushed stone is laid at a ratio of 6 to 1.

Advice! Use a plasticizer, not much of it is required (less than 1% of total mass), but it significantly increases the strength of concrete.

  • Now mix everything until the contents turn into a homogeneous mass.
  • Using a bucket or any other means, fill the dug holes with liquid concrete.

Process Features:

  • The trenches are not filled to the very top so that they can be hidden underground.
  • The solution dries in about 15-20 days. To be safe, wet the concrete surface with water every few days.

We erect pillars

Work starts from the corner, this makes it easier to measure the vertical level of the structure.

  • At the place where the pillar will be (hardened concrete), a cement-sand mixture is laid out using a trowel.
  • After which the brick is laid and tapped with a mallet.
  • Cement is also poured into the cavity between the blocks.
  • For the second row, all actions are similar, with the exception of the brick positions. For reliability, use staggered masonry.

Important! Monitor the vertical level of the column and be sure to fill all voids with solution.

Any vertical post must be measured by level

Auxiliary metal poles are much easier to install:

  • First, two metal corners must be attached to the pole.
  • Install the pipe into the recess of the trench and secure the dowels to the concrete.
  • Fill a circle around the post with a diameter of 10-15 cm with cement for reliability.

Without additional cementing, the reliability of the fence is in question

At the same time, do not forget to check the vertical plane.

Installation of horizontal jumpers

Fences made of corrugated sheets with brick pillars will last a long time if the sequence and step-by-step process is followed:

  • Attached to finished brick pillars metal corners. Dowels are best used at 70 mm.
  • The spans are connected to each other by pipes or channels.

Note! There is another option for installing crossbars. To do this, during bricklaying, metal plates are laid between the rows, to which pipes are welded after the work is completed.

Installation of corrugated sheets

  • Applies a sheet of material to the fixed metal jumpers.
  • Using a screwdriver and a hex socket, we screw the metal screws into the places where there is support. Look how it looks in the photo.

Please note - the self-tapping screw must be screwed in without any bending

  • The height from the ground is selected arbitrarily, the main thing is not to forget about the possible shrinkage of the pillars.
  • Self-tapping screws should be screwed in every 5-10 cm to avoid loosening of the fastenings due to strong winds.
  • The optimal height between the corrugated sheet and the ground is at least 5 cm. If necessary, you can cover the space with a plastic mesh.
  • It is better to fasten vertical metal posts by welding; this method is considered the most reliable.
  • Use only galvanized stainless steel fasteners.

The joint of two sheets of corrugated sheets is fastened using the above method.

Conclusion

We tried to tell you what you will need to build a fence. As you can see, the main difficulty lies only in acquiring materials and tools. All stages were sequentially placed in sections. If you have any questions, be sure to watch the video: construction of fences from corrugated sheets with brick pillars. There you will find some more tips and a lot of useful additional information.

How to build a powerful and strong fence from corrugated sheets, doing it quickly and inexpensively? It is possible if you build a fence of brick and corrugated board. Next, we will talk in detail about how to build a brick base and fill the fence openings with high-quality, inexpensive corrugated sheeting. Fences made of brick and corrugated board are light, but quite strong and solid.

Scheme of a brick fence made of corrugated board.

Design of fencing made of corrugated sheets and bricks

Design is the first step in the construction of any building. It is necessary to determine the location of the future fence, the level of the foundation and the thickness of the structure. To start designing, you need to install pegs at the corners of the building and stretch the cord along them. Using a construction tape, you need to measure the sides and draw up a project plan. Now you can start choosing the type of foundation.

The best foundation for such fences is a monolithic strip foundation. This type of foundation will reliably protect the area from rainwater flows and street animals. The width of the base is equal to the width of the brick pillars. The tape can be built of a single thickness or have different thickness, narrow under the corrugated sheet and wide under the posts. Such a foundation allows you to reduce concrete consumption and reduce earthworks. However, in this case, it is quite difficult to assemble the formwork. For fences of small thickness, you can choose a flat foundation.

The foundation under the pillars is laid to the depth of soil freezing.

Scheme of brick pillars for a corrugated fence.

This guarantees the immobility and stability of the base, which means stable operation of the gate, which is attached to steel pipes in the pillars. In less important places(under the posts to which the corrugated sheet is attached) the foundation can have a depth of 0.5 m. This will save on concrete and labor. Thus, sections of the foundation have different depths; there is no need to connect them into a single structure.

This is primarily due to the fact that soil heaving forces will affect the foundation, which has different depths. If such a reason is made single design, less buried parts will take a greater load and deform other areas. Such deformations are dangerous for that part of the foundation that is located under the gate posts. To effectively resist heaving forces, the foundation must be made to expand downward.

Having completed the design, you need to take care of purchasing materials and tools such as:

Scheme of installing gates to brick pillars.

  • brick;
  • corrugated sheeting;
  • concrete mortar;
  • boards for formwork;
  • sand, crushed stone;
  • shovel;
  • wood screws;
  • electric drill;
  • reinforcing bars;
  • metal pipes;
  • profile pipes;
  • welding machine;
  • enamel;
  • brushes

Return to contents

Carrying out earthworks

Fence diagram with main dimensions.

When carrying out excavation work, difficulties may arise with removal open ground, because when extracted it occupies a larger volume than compacted one. It is not always possible to place land inside or near the site, so it has to be removed. For export, it is poured into 50 kg bags (approximately 30 bags are required for 1 cubic meter of soil). When removing soil, in order to save money, its top layer is poured separately. It can be useful for arranging a vegetable garden. If the volume of soil being removed is large enough, it is necessary to hire an excavator.

If excavation work is carried out manually, it should be remembered that a flat surface is used for this. bayonet shovel. If the bayonet is attached at an angle, it is more difficult to dig with a shovel.

Return to contents

Foundation construction

Scheme for fastening corrugated sheets with screws

Once the trenches have been dug, the installation of the formwork can begin. It is assembled to the height of the base base and 20 cm below the ground level. The formwork is constructed from half-edged wooden boards. The structural elements are connected with wood screws, having previously made holes using an electric drill. Since the concrete solution exerts significant loads, the formwork boards must be secured with brick supports and wooden lintels. After pouring the foundation, the boards cannot be leveled. The panels should be assembled in a trench; they should be assembled from the top board placed along the cord marking the upper level of the foundation.

Foundation for a fence made of corrugated sheets and bricks to give greater strength it is necessary to strengthen it with reinforcement rods. Vertical rods are installed at a distance of 1 m from each other, and horizontal rods 10 cm from the base of the foundation strip and 5 cm from the pouring surface. To protect the reinforcement from corrosion, it must remain in the concrete at a depth of at least 5 cm. It is better to assemble the reinforcement frame on the ground, then placing it in the formwork. The reinforcement is assembled using tying wire. The connection of the rods is done with an overlap.

After assembling the formwork and reinforcement frame, angles and pipes are inserted to strengthen the brick pillars. They are leveled and secured with boards. This is a simple operation that can be done alone. There is no need to fill the foundation in those areas where the corrugated sheet will be attached to steel pipes. The pipes, in this case, are concreted in pits 60 cm deep. Before concreting, the pipes are leveled and secured to spacers so that distortions do not occur when pouring concrete.

Concrete must be mixed with a concrete mixer. The concrete mixer must be placed near the formwork. It is better to fill the concrete mixer halfway, as a full load will require more time to prepare a high-quality solution. To increase the frost resistance of concrete and for greater ease of laying, you can add a plasticizing component to it - household liquid soap (10 ml per bucket of cement).

Scheme of fastening corrugated sheeting to a brick pillar.

If you don’t have a concrete mixer, concrete can be prepared manually. It's done like this. You need to find a container with a volume of about 100 liters or a large steel sheet. A bucket of cement and 3 buckets of sand are poured there. Everything is mixed with a rake. Water and liquid soap are poured into the bucket. The soap should form a rich foam. The more foam, the better the concrete solution is plasticized. Water is added to the sand and cement, 6 buckets of crushed stone are poured in and the mixture is thoroughly mixed. It takes about half an hour to prepare 100 liters of concrete. Hand-mixed concrete has less strength than those made in a concrete mixer due to the higher water content. If you add less water, it will be difficult to mix the concrete by hand. However, for pouring the foundation for fences made of corrugated sheets and bricks, a solution of this quality will be sufficient. After pouring, the base is covered with a film to prevent the surface from drying out. In warm weather, stripping should be done every other week.

Every owner own home wants to fence off its territory from curious neighbors and animals from entering the area. To do this, a reliable fence is installed around the perimeter of the site.

Today there are many options for site fencing, but in lately A fence made of corrugated sheets with brick posts is becoming increasingly common. This fence looks solid and very attractive, unlike other types of fencing. Building such a fence is not particularly difficult, and the financial costs for its installation are low.

The construction of a fence made of profiled sheets with brick posts is practically no different from the construction of a fence made of corrugated sheets with posts made of a metal pipe, but there are still some nuances. First of all, the owner must clearly understand the final version of the fence and calculate its dimensions.

You will also need to prepare necessary tool for work and purchase building materials.

The construction of such a fence includes the following stages:

  • preparatory work;
  • determining the size of the fence;
  • construction of the foundation;
  • frame installation;
  • laying brick pillars;
  • fastening the corrugated sheet to the frame.

Determining the size of the future fence

First of all, it is necessary to determine the size and location of the fence made of corrugated sheets with brick columns. First, the corners of the future fence are marked with pegs and a nylon thread is stretched between them. The length of the perimeter of one side of the site is divided into equal segments. Each marked place is indicated by a peg. In the future, support posts will be installed in the marked places.

Important! Brick columns should not be too wide, so their width on the side and front sides is only 1.5 bricks. If there is a sufficient amount of material, the masonry can be made in two bricks.

The width of the strip foundation should be 20-25 cm. The foundation will protect the territory from penetration by digging under the fence of animals. Typically, the height of the base is 10-25 cm. In some cases, sidewalk curbs are used instead of building a foundation. But it all depends on the preferences of the owner.

Construction of the foundation

To build a fence made of corrugated sheets with brick pillars, a strip foundation is used, the manufacture of which consists of the following steps:

  • trench preparation;
  • installation of formwork;
  • pouring the foundation.

Preparing the trench

By general rule The depth of the trench must be greater than the freezing depth of the soil. As a rule, a trench is dug 40-80 cm deep, depending on the climatic conditions of the area. In the places marked with pegs under the posts, holes are dug or drilled for installing the pipe. The bottom of the wells is compacted with sand and the base of the column is inserted - a round or square pipe. Depending on the height of the fence, a pipe of appropriate length is selected.

During the excavation process, a sufficient amount of soil is formed. Upper – fertile layer can be left on the site, and the rest of the sand is leveled along the fence or taken outside the site.

Important! When installing support pillars it is necessary to ensure that they are installed strictly vertically. You can check this with a building level.

Installation of formwork

The height of the formwork is chosen at the discretion of the owner, however, making it more than 25 cm above ground level is impractical. The formwork is constructed from semi-edged construction boards. If available finished formwork- install it. To prevent the boards from bending under the weight of concrete, they are additionally fastened with wooden jumpers or pegs driven into the ground.

After installing the formwork, it is reinforced. For this, reinforcement rods are used, the diameter of which is 1 cm. The reinforcing rods are connected to each other with knitting wire, which will increase the strength of the foundation being built. Sometimes reinforcement cage collected from the outside and then lowered into the formwork.

Metal support posts are needed to strengthen brick pillars. The optimal distance between pillars is 2 meters. To ensure that the pipes do not become askew during the process of pouring the foundation, they must be carefully secured in the well. To check the installation level of the pillars, a nylon thread is also pulled in the middle and on top, similar to the bottom one (which determines the height of the foundation). While pouring concrete, the verticality of the pillars is constantly monitored.

As a rule, the height of the fence is 1.5 meters. Consequently, metal pipes for pillars, taking into account their deepening, should have a length of 1.9 meters.

Pouring formwork

To prepare cement mortar, crushed stone, sand, water and cement are used, preferably grade M 400. In some cases, a plasticizing additive is added to the mortar to increase frost resistance. The ratio of sand and cement in the solution can be 1 to 3 or 1 to 4. It all depends on the brand of cement. The solution is mixed in a concrete mixer or by hand until a homogeneous mass is obtained. Household liquid soap (plasticizing additive) is mixed with water. Only after the foam has settled can it be added to the solution.

The prepared solution is poured into the formwork, carefully leveled with a trowel and leveled to the level of the stretched nylon thread. The drying time of the foundation depends on weather conditions and is at least 3 days. Complete hardening of concrete occurs a week after pouring.

Frame construction

The stability of the future fence determines the quality of the frame. Its construction begins no earlier than 3 days after the foundation is poured. The construction of the frame can be done both before laying out the brick columns and after the construction.

The construction of the frame before the erection of brick pillars is carried out using a 20x40 profile pipe. The pipes are welded to the installed metal posts using welding. Horizontal pipes are welded at a distance of 30 cm from the top of the column and at a distance of 15 cm from the surface of the foundation. It is recommended to coat the manufactured frame with alkyd paint, which will prevent metal corrosion.

In the second case, it is necessary to installed pipes At a distance of 30 cm from the surface of the formwork and the top of the pipe, weld embedded metal plates that are brought out to the outside of the brickwork. In other words, the mortgages must protrude from the brickwork. After laying the pillars, cross members from a profile pipe are welded to the protruding mortgages.

Laying brick pillars

For lining installed metal supports facing bricks are used. Brick laying is done using cement mortar with a cement to sand ratio of 1 to 3. You can also add liquid soap to the mortar, which will improve its ductility.

Bricks are laid around the installed metal pole. The gap formed between the pillar and the brickwork is filled with mortar. To strengthen the masonry, it is allowed to reinforce each two rows with a 50x50x4 mm mesh.

Advice! It is advisable to lay the pillars one by one: first lay the first pillar to a height of 50-60 cm, then the next one. This will allow time for the brickwork to shrink.

In places where profile pipes interfere with the masonry, the brick should be carefully cut with a grinder, then fit it under the pipe, carefully sealing all the cracks with cement mortar. To give brick pillars a finished look, special ready-made caps are installed on top or I make them myself from galvanized steel.

Caps purchased at a hardware store are installed on the mortar, and those made of galvanized steel are attached with dowels to the last brick row. Such caps can be painted to match the corrugated sheeting to give them beauty.

Fastening corrugated sheets

The final stage of building a fence with brick posts is attaching corrugated sheets to the frame. For this, galvanized roofing screws or special rivet nails are used.

Fastening, as a rule, is made in each wave adjacent to the crossbar. To do this, drill a hole in the corrugated sheet and cross member, after which a self-tapping screw is screwed in or a nail is pressed with a rivet gun.

The sheets are laid one on one with a slight overlap.

When the last sheet of corrugated sheeting is attached to the frame, the work is completed. Thus, installing a fence made of corrugated sheets with brick posts is not so difficult if you follow the stages of its construction.

Currently, the presence of a fence on the site has great value. It defines the boundaries of areas, closes it from prying eyes, and prevents the entry of uninvited guests. There are various types fences - simple wooden, modest brick, pompous monolithic. On summer cottages fences are often built from corrugated sheets in combination with brickwork. As a rule, support pillars and foundations are made of brick, and corrugated sheeting is installed in the gaps. This method allows you to create fences that are not similar to their neighbors.

Pouring the foundation for a combined fence

A combined fence is usually built so that it matches the appearance of other buildings on the site. The same material is used for the pillars as for the walls of the buildings. Metal caps of pillars and corrugated sheeting are matched to the color of the roof of the buildings.

With the help of a combined fence, you can give your site the necessary individuality, as well as emphasize the architecture of buildings. Of course, the cost of such a fence will be much higher than a fence with steel posts, but the appearance will fully justify it. The high cost is due to the need for a foundation and brickwork of pillars.

To build fence made of brick and corrugated board, you must first dig a trench for the foundation. Its depth must be at least one meter. Then you need to mark the location of the support pillars, gates and gates. The step between the pillars should be no more than three meters. After this we build the formwork. Pipes or corners should be installed in place of future pillars to enhance their strength. The next step is pouring the foundation concrete mixture and crushed stone.

The width of the foundation can be the same along its entire length or different. For example, under the posts you can make it full width, and under the corrugated sheeting – narrow. In this case, the amount of concrete is saved, the volume of excavation work is reduced, but the assembly of formwork becomes more complicated.

After three days you can begin assembling the frame. It is made from profile pipes, which are held together by spot welding. The frame should be painted.

Construction of brick columns

After this, they begin to build brick columns. Pillars perform two main functions - supporting and aesthetic. Brick pillars can provide the fence structure with the necessary reliability and make it strong and durable. For pillars, facing bricks are usually used. Brick laying should be done gradually, laying 50-70 centimeters per day. This way you get an absolutely even column.

The height of the brick pillars is determined by the height of the future fence. Most often, the pillars are made two to three meters high and with a cross-section of 380x380 millimeters (one and a half bricks). A section of two bricks (510x510 mm) is used much less frequently. You should put special caps on top of the finished posts, which can be bought at a hardware store. They will protect brickwork from destruction.

Installation of corrugated sheets to the frame of a fence made of bricks and panels

The final stage of fencing manufacturing is the fastening of the corrugated sheet. However, before installing the corrugated sheeting, marks are made on the material indicating the locations of the screws, and the surface of the strip foundation is covered with cardboard or rags, which prevent damage to the material during installation.

Next, the sheets are set in a given position, and they are fastened to the frame elements, for which galvanized self-tapping screws with a 4.8x30mm rubberized head are used. To screw in the fasteners, you should use a drill or screwdriver, and fasteners should only be made to the lower corrugation of the corrugated sheet through the wave. All remaining materials are fixed in a similar way, with the sheets overlapped.

Construction of a fence made of brick and corrugated board: basic recommendations

In order for a self-made fence with brick posts to have higher performance characteristics, during its manufacture you should adhere to certain recommendations:

  • In the places where gates and gates are fastened, provide for the installation of embedded elements in the post structure;
  • Traumatic operations (cutting corrugated sheets, bricks) should be performed only with the use of protective equipment (glasses, gloves);
  • It is advisable to equip the end faces of the sheets with a decorative profile for mechanical protection of the flooring.

Video on how to build a fence from corrugated board and brick with your own hands


Read on to find out more!


4 years ago

I want to build such a fence in the village instead of the old one that has long since rotted away. How to pour the foundation is clear. I can also handle the gate area myself. In principle, if desired, you can build a combined fence yourself. The question is at the gate. It's a pity there are no tips for installing them...

I've been thinking about replacing the fence at my dacha for a long time. Build it from corrugated sheets, good idea, and strengthening it with brick pillars is very original. It is quite possible for anyone to do it on their own, without the additional costs of hiring a team.

I made my fence using a similar technology, only instead metal pipes took a leak concrete pillars with a reinforced frame inside.
The formwork was made from collapsible OSB sheets.
And when casting the foundation for the fence, I laid the reinforcement to which the frame of the post was attached, then everything was covered with bricks as in the description.

What else to read