How to remodel a bathroom from scratch. Bathroom renovation: estimate, room specifics, full cycle of work

Bathroom refurbishment has special requirements. We can say that doing it is more difficult than repairing in any other room of the apartment. After all, there are communications that are under heavy load. In addition, both the walls and the floor are exposed to moisture, which affects. Consider in what sequence you need to do repairs in the bathroom.

If the repair in the bathroom is delayed, this leads to inconvenience, because it is difficult to do without this room. But if all the finishing and installation of plumbing is done correctly, then the bathroom can be used long years forgetting about any cosmetic repairs and updating accessories. Here it is important in correct sequence carry out the main stages of repair work.

1. Layout of the room

Preliminary planning is required both when the room is small and when the bathroom is large. If this is not done, then you risk making a small bath so that it will be difficult to turn around in it, and if the room is large, on the contrary, it will look empty and uncomfortable. However, in modern apartments It is important to choose accessories for a small bathroom. Consider the most common bathroom layouts.

Schemes: 10 bathroom layouts

There is a sufficient selection of equipment on the market specifically for small bathrooms. First of all, pay attention to the corner structures. There are both corner washbasins and corner baths. Perhaps, in order to make the room as comfortable and cozy as possible, it is worth moving away from the usual solutions when these accessories are installed only frontally.

2. Equipment selection and installation

Plumbing fixtures for the bathroom, these are items that should not be saved on. After all, the failure of the mixer can lead to flooding of the neighbors on the floor below and, consequently, to unforeseen expenses, sometimes considerable. Buy plumbing only from well-known manufacturers, and invite a specialist to install it if you cannot do it yourself. However, the market offers a sufficient number of quality plastic pipes both plumbing and sewer, which can be installed independently.

As for the bath, here you can save. Indeed, in the market, in addition to expensive cast-iron structures, there are more budget options. Well, if you still prefer cast iron, then in this case you can buy a cheaper Chinese bath. When installing the bathtub, use special gaskets that are attached between the structure and the wall so that water does not flow behind the bathtub. This will save you a lot of trouble.

If you are renovating a new building, see how the builders installed the water and sewer pipes. It may be worth replacing them immediately with better ones. In any case, even if the pipes are good, when making repairs, they should not be covered with finishing material. It is better to have water supply and sewerage in special casings so that they are easily accessible.

If this is not done, when the connections leak, the finish will have to be broken, which will lead to additional costs.

3. The choice of finishing materials for the walls

Like many years ago, the No. 1 material for finishing the bathroom remains. There are plenty of sizes on the market, but if you want a regular, traditional repair option, you should choose standard sizes. The use of tiles of various configurations requires additional knowledge and artistic taste.

Plastering walls with mesh is a time-tested option

Advice. To keep the tiles well, a metal or plastic mesh is pre-attached to the walls.

You can advise the following materials for interior decoration bathroom:

  • plastic;
  • wood.

Bathroom wall tiling

As already mentioned, when installing tiles, do not cover water and sewer pipes with it. It is better to use casings from a different material. The only thing to strive for is that the casing covering the pipe does not look like an alien element, but harmoniously fits into the interior.

Bathroom wall decoration with plastic panels

There are many other materials that can be used when decorating a bathroom. Many of them are much cheaper than tiles. For example, . For their installation on the walls, special guides are attached. The panels are good because, if necessary, they can be easily removed and replaced with new ones. Here you can make casings from plastic that will hide the pipes when you tile the room. Of course, in this case, the plastic must be matched to the color of the tile.

Bathroom wall decoration with wooden clapboard

Can also be used wooden panels, and lining. But the tree must be processed special impregnations to protect against moisture. In this case, the casings can also be made of wood, or plastic can be used that imitates this natural material.

If you want to decorate the walls large mirrors, then you should choose those that are also protected from moisture. Ordinary mirrors will last a very short time.

Mosaic bathroom wall decoration

Mosaic on one wall

Some people paint the walls with oil paint and even whitewash them. How many people, so many preferences. Of course, you can choose any option, but always remember to choose materials that will serve you without updating for many years. Unless, of course, you want to update the interior very often.

Photo: wallpaper on the walls in the bathroom

Tiles, plastics and wood, treated properly, are the most suitable materials for decorating a bathroom.

4. Mounting the ceiling

If you are doing repairs yourself, then keep in mind that it is much more difficult to mount tiles on the ceiling than on the walls. In this case, you can simply paint or use plastic. Oil paint must be of good quality, resistant to moisture. Can also be used stretch ceiling. But if you have never mounted it before, you should entrust this matter to specialists.

Ceiling made of plastic panels

Ceiling finishes:

  • just painting.

Stretch ceiling with built-in lights

5. Ventilation device

It happens that tenants, making repairs, neglect the ventilation openings and close them. This should absolutely not be done. On the contrary, it is recommended for better ventilation of the room to install exhaust fan. Do not forget that the humidity in this room is increased, and the periodically turned on hood can significantly reduce it.

6. Choice of lighting

Very often they leave in the bathroom, which the builders installed. But it doesn't always fit the design you choose. Do not neglect the replacement of this element, because a lamp that does not fit the interior in any way can ruin the whole look of the room. If you want to break away from tradition and install lighting on the walls, then you need to think about this even before the start of the repair.

Recessed lights + LED lighting

Mounting lighting directly above the bathroom, where water can get on the lamps, is not recommended, even if you use moisture-proof lampshades. Always remember that water and electricity are a deadly neighborhood.

7. Floor installation

It is preferable to put a tile on the floor too. Although you can use both laminate and wood. As with walls, the wood must be impregnated to protect it from moisture.

Main materials:

  • tile;
  • laminate;
  • marble.

Laminate flooring in the bathroom

There are also very economical option flooring in the bathroom. To do this, a cement screed is made on the floor, on which waste is laid. marble production. Such waste can be bought cheaply from a marble processing plant or workshops. Installation of such a floor is cheaper than making it from tiles, laminate or wood. If you are using fabric mats, make sure they are small so that the fabric can dry quickly. Otherwise, there will be an unpleasant smell from dampness in the room.

Wooden floor in the bathroom

If you are doing repairs in a new building, then it would be good to take care of waterproofing the floor. This will save you from flooding your neighbors in case of an accident. After all, it may happen that compensation for the damage caused will significantly exceed the cost of its own repair. So it's better to spend money on waterproofing. You can make it with bituminous mastic. Please note that the insulation should go at least 20-25 cm onto the walls. Only in this case will it be reliable.

Floor and walls in porcelain stoneware bathroom

Do not make the bathroom floor smooth, use only special floor tiles. Neglecting this elementary rule can lead to serious injuries if you slip on a wet surface.

Ice

27176 1 7

Budget repair in the bathroom - 6 stages that will allow you to meet 7500 rubles

Description of the workflow

To better understand all aspects of this topic, I will explain on specific example. So we have:

  • a typical room in a nine-story building of the P-44 series;
  • the size of the room is 1.7 by 1.7 meters, the ceiling height is 2.64 meters.

We will consider how much the decoration will cost us, I will not touch on the plumbing, since most often if the repair is done as economically as possible, then these elements do not change.

Stage number 1 - competent organization of the process

If you want to save on repairs, then these rules should become fundamental for you:

Do it all by hand If we consider the cost of the services of specialists, then we can notice such a feature that their work costs about the same as the materials. And taking into account the fact that we will use the most budget decisions, it is easy to guess that you will pay more for the services of builders than for materials. The conclusion is simple: we do everything ourselves and reduce the cost of the project by more than half
Use quality materials I talk about how to make repairs using inexpensive, but not low-quality materials. In pursuit of savings, many begin to go too far and buy the cheapest product options, but this is not worth doing, as their reliability and appearance leave much to be desired. I will tell you how to choose solid solutions and at the same time pay a little
Follow the technology of work Below I will tell you how to finish each of the sections, the process is described in steps, and there is not a single extra step in it. There is no need to skip individual stages, as this will inevitably reduce the quality of the work and negatively affect the final result.
Don't reschedule If you want to change the layout, among other things, then hope for the most cheap repair at least stupid. Any manipulations with the rearrangement of plumbing lead to the fact that it is necessary to shift communications, and here it makes no sense to save, everything must be done expensively and reliably

Another very important recommendation, which directly affects the cost of the project - the use of those materials that are easy to work with and that you can lay or attach with high quality. Many times I completed repairs for those who overestimated their strength and, having completed a small part of the repair, realized that they would not master it. Then, of course, you need to spend a lot of money on the wages of the builder.

Be prepared for the fact that you will have to spend a lot of time and instead of cozy quiet evenings watching TV, you will have to destroy, level, lay, saw, fasten, and so on. There is no free cheese in mousetraps, you will have to pay for the savings with your time, but if you take into service all the tips from this article, then the costs will be minimal.

You must have a work plan in advance in order to make an economical repair from scratch with your own hands, you need to clearly plan each step and accurately calculate the materials so as not to purchase too much. Just read all the sections below, and based on them, you can easily draw up a clear plan.

Stage number 2 - the acquisition of everything you need

I will tell you how the simplest estimate for bathroom renovation is compiled - the sample can be adapted to your room in order to carry out all the calculations. The estimate is a list necessary materials with an indication of their quantity and cost, since we carry out the work ourselves, then it makes no sense to include their cost, unless you assign yourself a financial incentive for a successfully implemented project.

The cost is calculated according to separate parts rooms, we will look at each of them and start with the floor. Linoleum will be laid on the floor, let's figure out how to choose it:

  • Since the room is damp, you should purchase options without a base or based on PVC, since it is not afraid of dampness and mold and fungus do not form in it.
  • The dimensions of the bathroom are 1.7x1.7, the area is 2.89 square meters, but no one will cut the material according to our sizes, it is sold in running meters. In our case optimal width 2 meters, since there will be the least waste from it, we need 2 linear meters, that is, 4 squares;
  • Having called all the trading facilities, I found a PVC-based option, which cost 224 rubles per square meter. Upon inspection, I made sure that the surface is strong without damage and marriage, the substrate is elastic, and the material is . As a result, I paid 896 rubles for 4 squares;
  • In order for the joints of the floor and walls to be neat, a plinth is needed, I found a plastic “Comfort” at 56 rubles apiece 2.5 meters long. We need to close 3 walls, and on the fourth there is a door 60 cm wide with 8 cm cashings, that is, the opening occupies 76 cm. waste from elements that will go to the walls;
  • As a result, you need to purchase 3 skirting board strips for 56 rubles each, 4 inner corners for 35 rubles each and two plugs - right and left for adjoining door frame, they cost 27 rubles. Adding all the results, we get (56x3) + (35x4) + (27x2) = 362 rubles;
  • We will use liquid nails to fix the baseboard, I bought a convenient 200 ml tube for 104 rubles.

Now we summarize all the expenses: 896 + 362 + 104 = 1362 rubles I spent on Decoration Materials for the floor, when compared with conventional projects, the amount is several times less.

We will level the ceiling with putty and paint with moisture resistant white color, so we need the following materials:

  • To level the surface, I use the composition "Vetonit VH", which is designed for use in wet areas and guarantees a reliable result. The ceiling did not have significant irregularities, so one bag of composition weighing 20 kg is enough, which costs 456 rubles;
  • For coloring we need paint for wet rooms, I chose the latex-based option. You need to apply the composition in 2-3 layers, so I bought a 3 kg package, for which I paid 190 rubles;
  • To treat the surface and strengthen it, a primer is needed, I purchased Tikkurila products with a volume of 900 ml for 124 rubles, this is quite enough for our purposes.

Now we summarize all the costs: 456 + 190 + 124 = 770 rubles we need for the ceiling.

Let's move on to the most expensive part - the walls, for them I chose PVC panels 250 mm wide and 2.7 meters long - there will be a minimum of waste. This material is not afraid of moisture, it is easy to wash, so it is suitable for the bath just fine.

Let's figure out what we need to work:

  • It is necessary to calculate the number of panels, with their width of 250 mm, you need to divide the length of the walls by this indicator. But we must not forget that on one of the surfaces there is an opening measuring 700x2100, on one side of it there will be one whole panel, on the other three, and above the doors we will need three pieces 540 mm long, that is, we will cut one element. So, on the wall with the door we need 4 whole panels, remember this figure and move on;
  • Divide the wall length of 170 cm by 25 cm, we get 7 panels, multiply this result by 3 and get 21 pieces. We add 4 panels from the above paragraph and get 25 elements - so much is needed to decorate the walls in the bathroom. I found products for 127 rubles apiece, the total costs amounted to 3175 rubles;
  • For installation, we need components, first of all, this inner corner, these elements are sold in pieces of 3 meters and cost 50 rubles. We need 4 pieces, that is, the costs will be 200 rubles;
  • Above, below and along the perimeter of the opening, I decided to put start profile, which is sold in pieces of 3 meters, 4 elements are needed upstairs, 2 elements are needed to frame the doorway, pieces can also be joined at the bottom, since this part will be closed with a plinth, but you still need 1 whole piece. Total need 7 starting bars, costs at a price of 45 rubles will be 315 rubles;
  • We will mount the panels on a bar measuring 25x50 mm, it will be located horizontally in increments of 30 cm so that the surface is strong and does not sag. With a height of 264 cm, 9 rows need to be fixed, we count in running meters 9x1.7 = 15.3 meters, multiply by 3 whole walls and get about 46 meters;
  • On the wall with a door, there will be less material, 3 pieces 170 cm long, 6 pieces 80 cm long and 6 pieces about 20 cm long. In addition, you need to nail vertical strips along the opening, 2 pieces 210 cm each for its secure frame. As a result, we get the following result (170x3) + (80x6) + (20x6) + (210x2) = 1530 cm or the same 15.3 meters;
  • Summing up all the numbers, we get 61.3 meters, the bar is sold in pieces of 3 meters, that is, we need 21 pieces. We have lumber of this type costs 40 rubles apiece, that is, I spent 840 rubles for the entire volume;
  • I will fasten all the elements using a stapler, I will need staples, a package of 1000 pieces costs 45 rubles, and this is quite enough for the job.
  • The bar will be fastened with 6x50 quick-mount dowels, about 200 pieces will go to all the walls, at a price of 25 rubles, the cost is 500 rubles.

Let's calculate all expenses: 3175+200+315+840+45+500=5075 rubles.

For clarity, I will show all the results in a pivot table:

Bathroom floor
Material name Quantity Amount, rubles
Linoleum 4 sq.m. 896
Plinth 2.7 meters 3 pcs. 168
Inner corner 4 things. 140
Plug left and right 2 pcs. 54
Liquid Nails 200 ml. 104
Ceiling
Putty "Vetonit VH" 20 kg 456
Latex paint 3 kg 190
Strengthening soil 900 gr. 124
Walls
PVC panels 2500x250 mm 25 pcs. 3175
PVC inner corner 4 things. 200
starting bar 7 pcs. 315
Edged bar 25x50x3000 mm 21 pcs. 840
Staples for a stapler pack. 100 pieces. 1 pack 45
Fast mounting dowel 6x50 200 pcs 500
TOTAL: 7207

As you can see, a cheap do-it-yourself bathroom renovation is not a fantasy or a fairy tale, while I did not use the cheapest compounds and materials, everything I purchased is different good quality and attractive appearance.

Stage number 3 - dismantling of old coatings

It is impossible to carry out work without removing the old tile or without removing the worn flooring. Of course, if you have a floor or ceiling in good condition, then it makes sense to leave them. For example, if the tile on the floor looks normal, then you can freshen up the surface by removing the old grout and filling the joints with a new compound. The same applies to the ceiling: if it is even, then you can remove the old coating and repaint it.

But in practice, most often it turns out like this, then you need to do the floor, and the walls, and the ceiling, so I will consider just such an option, before making repairs on a budget, I will have to sweat to remove the remnants of old coatings.

The following work is to be done:

  • Most often on the ceiling old whitewash or paint that has turned black over time. Sometimes there are many layers on the surface, and it takes a lot of time to remove them. I use a scraper, but you can use a spatula, knife and any other device convenient for you, the main thing is that you can remove the old coating;

Old whitewash and water-based paint they will come off much easier if the surface is thoroughly moistened and left for 20-30 minutes.

  • As for the walls, they can either have many layers of paint and whitewash, or old tiles. The compositions are cleaned off as described above, but you will have to tinker with the tiles, it is best to use a puncher with a special blade for work. If there is no power tool, then you will have to work the old fashioned way - with a hammer and a chisel, the work is tedious, but one way or another it needs to be done;
  • Lastly, the floor surface is prepared, in my case there was linoleum, so the work was simple: I removed the old coating and got flat surface, ready to go. If you have a old tiles, then you have to tinker, removing it from the surface, the same tools are used for work as in the paragraph above.

Naturally, you need to take out everything superfluous from the room, you should only have prepared walls left.

Stage number 4 - finishing the ceiling

It is from this part of the bathroom that I advise you to start work for the simple reason that a lot of dust will form in the process, and the putty may fall down. The finishing option that I am considering is the most budgetary - you can achieve it yourself excellent result for the simple reason that the ceiling area is small and it will not be difficult to perfectly align it even with a lack of experience.

The instruction for the work looks like this:

  • First you need to check the plane with a level or a flat bar to see what irregularities need to be eliminated;
  • The surface must be treated with a primer to strengthen it and remove dust, the composition is applied with a brush and dries for about an hour;
  • Then the composition is prepared, it retains plasticity for a couple of hours, so I advise you to do no more than 5 liters at a time, your work speed will be low, so you are unlikely to use up more. All the features of mixing the composition are indicated on the packaging, so there should not be any problems with this part of the work;
  • The first layer needs to eliminate all significant irregularities, if there are none, then simply putty the entire surface, creating a kind of base, do not worry about stains, they will be eliminated. After the surface dries, the influxes are easily cut off with a spatula, after which you need to check it with the level again;
  • The second layer should level the ceiling, try to do the work carefully, there may be sagging on the surface, but the holes should not remain, since they cannot be eliminated. In extreme cases, you can walk a third time if the ceiling was uneven and you have to display a plane with large drops;
  • After drying, the dirtiest part lies ahead - grouting the surface, bring a respirator and goggles, as when sanding, the dust will fly into the eyes and enter the respiratory tract. In order to control the plane, use a simple trick: hold a light bulb near the surface, it perfectly shows all the irregularities and allows you to perfectly level the surface at one time;
  • After finishing work, the surface is cleaned with a brush or broom, after which it can be painted. The work is carried out in 2-3 layers, you can use both a brush and a roller, it all depends on convenience. Each subsequent layer is applied after the previous one has completely dried.

Stage number 5 - flooring flooring

When considering how to make a floor economically, linoleum will always be out of competition, not only due to its low price, but also the reliability and durability of the coating. In the bathroom, this coating is placed very simply:

  • The surface is cleaned of dust and debris, it can be wiped with a damp cloth to clean as well as possible;
  • Next, the material is spread, it will go onto the walls, so you need to place it evenly, after which the building or any other sharp knife excess is cut off. Do this carefully, as it is unlikely that you will be able to glue what is cut off by mistake;

The joint in the opening can be glued liquid nails, but you can close the bar

Due to the fact that the area of ​​\u200b\u200bthe room is small, plus there will be a bathtub on the surface, there is no need to glue linoleum, but if you want to strengthen the coating, you can use double-sided tape. The plinth will be fixed subsequently, at this stage this stage can be considered completed.

Stage number 6 - wall decoration

First, a process diagram is presented, and below each stage is described in detail:

  • The frame is leveled; when attaching elements, you can put chips and pieces of wood under them to output the ideal plane. A hole is drilled in the bar, then a hole in the wall is drilled right through it and a quick-mount dowel is hammered. You can fill your hand in literally 10 minutes, so the process will go quickly;
  • Then, corners are attached in the corners, and a starting profile is attached above and below, as well as around the perimeter of the opening.. The main thing is to accurately cut the bar at the joints so that everything looks neat. Fastening is done using a stapler, it is very fast and very reliable;
  • A panel is inserted into the upper and lower guides and wound into a corner, after which it is fixed with brackets to the bars. The work is done in this way until the entire wall is finished, the last plank is cut so that it is 3-4 mm wider, the corner or the starting profile is slightly bent and the element falls into place. Plastic bends well, but you still shouldn’t be too zealous, do everything carefully.

After finishing the walls, you can glue plastic plinth, do not forget to put corners and plugs so that all the elements fit perfectly with each other.

This is a simple example of how to make a cheap bathroom renovation, even if you spend 1-2 thousand more, but still the costs are not comparable to those that you would incur using standard materials and hiring builders.

Conclusion

It is quite possible to transform the bathroom, while spending a little more than 7 thousand, and I showed this with a specific example. I tried to talk about everything in detail so that you can understand the topic, and the video in this article will clearly show some important points to better understand some of the nuances. If you have any questions - write them in the comments below.

August 26, 2016

If you want to express gratitude, add a clarification or objection, ask the author something - add a comment or say thanks!

Bathroom renovation has long been part of our plans, since the last time it was done 15 years ago. During this time, the bath turned yellow, the sewer pipes clogged, the tiles began to fall off, the plumbing was covered with an indelible coating. Therefore, we saved up money, counted the amount of material, gathered our strength and began to repair.

However, first things first. First, we turned to repair specialists. Our bathroom is located in an apartment in a house built in the Khrushchev era, when the party and the government were faced with the task of quickly resettling Soviet citizens. Therefore, no one cared about comfort, the main thing was to give people a lot of housing, more modest yes smaller size. For example, our bathroom, together with the toilet, has a size of 1.5 by 1.8 m. And for the repair of this small area, local craftsmen asked for an amount that could hardly fit in our heads.

Of course, they can also be understood. There is no work in the provinces (namely, where the house of the Khrushchev era is located), so people who did not leave to protect the capital and know how to do at least something, took up the repair of apartments and private houses. And since there are few such people, the demand for their services is high. Prices have skyrocketed, so even for the repair of a small bathroom they ask for big money, by the standards of the same province. As if the Kremlin Palace is going to be restored. And the quality of work leaves much to be desired. Even our Uzbek friends no longer want to receive a reward, for which a couple of years ago they were ready to work hard from morning to night.

For comparison, you can view the work of the capital's masters at the builders' exchange VotMastera.ru. Prices are an order of magnitude lower than those offered by local repairmen, and the quality of the work performed can be judged both by photos and customer reviews.

In general, assessing the volume and specificity upcoming work decided to do the repair themselves. And the money that could go to the wages of the workers, we will spend on the boards and make it in the country, and even there won’t be any left. In this article we will tell you in detail how we did the repair, attaching a lot of photos.

DIY BATHROOM REPAIR

First of all, let's define the scope of work. We decided to make a complete renovation with our own hands, replacing everything that is there: a bath, a toilet bowl, a sink, a radiator, floor and wall coverings. Everything except, which we recently mounted.

First, remove the cabinets and shelves, unscrew the screws on which they were held, remove the sink. As a battery, we hung a heated towel rail, curved like a coil. We will change it too.

If you plan to replace the radiators, then you need to carry out repairs at the time of the year when there is no water in the radiators. Carefully cut off the heated towel rail grinder.

Now let's break the tile. To do this, we use a perforator with a nozzle in the form of a spatula.

Carefully remove the entire tile, trying not to damage it. It can be useful, for example, for landscaping.

Water was supplied to the bathroom polypropylene pipes. Let's turn off the tap and dismantle the entire pipeline together with the mixer. To have water supply, connect to the tap flexible hose and we will use it during the repair with our own hands.

There is a ventilation window under the ceiling, in which a fan was mounted and connected to electricity. Under it there is another entrance to the ventilation shaft, where the tin box coming from the kitchen is inserted.

This is how Soviet engineers designed apartments - the kitchen was ventilated through the bathroom. Another architectural masterpiece is the window between the kitchen and the bathroom.

In some apartments, it has survived to this day. They probably made it in order to be able to take and follow the preparation of dinner. We carefully dismantle the tin box with the fan.

Next in line is the bath. We disconnect it from the sewer and take it out of the room.

A heating pipe was laid under it, which goes to the kitchen, a heated towel rail was connected to it. Let's leave a piece of such a length that we can cut the thread, cut off the rest of it with a grinder. We cut the thread with a half-inch lerka.

The sewerage laid in the bathroom has been in operation since the construction of the house. It's made from cast iron. Carefully, using a small sledgehammer, knock out the pipes from the entrance to the sewer riser.

They broke, looked, were horrified - they were completely packed. How the water left the kitchen sink remained a mystery.

The last to dismantle the toilet. It was connected to a cast-iron elbow, which is inserted into the sewer riser. To take out this knee - I had to suffer. They've done it right before. But there is still no reception against a sledgehammer and scrap. Just tap on the knee carefully, cast iron is a fragile material. Knocked, twisted - pulled out.

The floor was covered with ceramic tiles. During the repair, we also dismantled it using a perforator, having cleaned the floor to a cement screed.

Half of the work repair the bathroom is finished with your own hands.

INSTALLATION OF THE WATER PIPE IN THE BATHROOM WITH YOUR HANDS

The plumbing, which we dismantled during the renovation, ran over the wall. From the condensate that collected on it, it turned black. To prevent this from happening again, we will hide it, where possible, in the walls. To do this, we will make strobes in the places where we plan to install the pipe with a perforator with a nozzle with a spatula. The depth of the strobe should be slightly greater than its diameter so that it can be completely plastered. This work is quite dusty, so we recommend closing cracks under the door with some material. In several places, the strobe needs to be enlarged so that the pipe fastening to the wall can be inserted.

For the installation of water supply, we chose pipes made of polypropylene. It is modern, reliable and durable material, with a long service life. To connect them, a special soldering machine with metal nozzles of different diameters is used. It works like this: we heat the device, at the same time insert the pipe and the coupling into the nozzles, wait until they melt and connect them together. After a few seconds, when the material has cooled down, the connection is ready for use.

Before installing the plumbing in the bathroom with our own hands, we carefully measure all dimensions, calculate the number required couplings, corners, stopcocks and fittings. If the connection needs to be made detachable, we use special “American” fittings. With their help, part of the system can be separated without destroying it. We plan to install a water meter. Just in front of the meter and after it, we use “Americans” so that we can replace it if necessary. We will provide for the installation of a main filter for water purification. We solder the shut-off ball valve so that you can turn off the water before replacing the cartridge.

After the renovation in the bathroom, we will have 3 water points - one near the sink, the other - at the bathroom, the third - at the toilet. To two points we will bring cold and hot, to the toilet - only cold. After we fix the polypropylene in the strobes, we screw the valves to the fittings and supply water. It is necessary to check the system for leaks before we start plastering and tiling. In our case, everything turned out to be normal, you can start. But before that, we will make more small strobes to hide in them electric wires. The bathroom had an outlet that was too high off the floor. During the repair, we will lengthen the wiring and lower it lower.

We will also bring electricity to the ventilation window and bring out the wire for connection with a lighting lamp.

WALL PLASTER

First, we will plaster the window between the bathroom and the kitchen. From the side of the kitchen, it is already patched up, we will do the same in the bathroom. To do this, cut off the height of the opening aluminum profiles, fix them on the frame with screws.

Cut out a piece to fit the window moisture resistant drywall and screw it to the profile flush with the wall.

To keep the plaster stronger, we glue the joints with masking tape.

Prepare the solution according to the instructions written on the packaging with the dry mix. Put it on a wide spatula and plaster the window.

To make it easier to lay ceramic tiles on the walls, they must be leveled. If the irregularity is large, you can use plaster beacons by setting them vertically in level. After that, we cover all the strobes with a mixture, then we completely plaster everything.

ventilation windows also adjust to the size of the decorative grilles.

Now you can paint gas pipe that runs under the ceiling of the bathroom.

INSTALLATION OF TILE ON WALLS

To decorate the walls in the bathroom, we chose ceramic tiles rectangular shape. After waiting three days for the plaster to dry, we proceed to laying.

We will not tile under the bathroom. Let's start with the second row. So that it does not move out, we fix the rail along the entire length. Prepare the glue by mixing the dry mixture with water of the desired proportion with a mixer. We put it on the wall with a spatula, level it with a comb over an area equal to the size of one or two pieces and apply the tile, slightly pressing on it.

Thus, slowly, lay it on the entire surface. Between the tiles it is necessary to install special plastic crosses to help control the size of the joints. For beauty, you can glue copies of a different pattern or color,

symmetrically placing them on the walls.

After laying the tile, wipe it off the adhesive residue. Then we'll take a bite desired color, mix it with water and rubber spatula carefully stitch the seams.

First, fill the seam with a mixture of transverse movement, then align the longitudinal. After a couple, when the grout dries, remove its remnants with a dry cloth.

Next, we will fasten the “American” detachable fitting to it, we will attach the heating pipe to it.

into place old battery hang a new one, providing in front of it stopcock and a Mayevsky crane for bleeding air.

Connect pipes to centralized system heating.

To lay the pipe to the place of its installation,

without forgetting to solder the ball valve.

INSTALLATION OF HEATED WATER FLOOR

On the bathroom floor, we decided to make a heating system. To do this, during the repair on cement screed we laid welded mesh, attaching it to the floor with dowels with screws.

Before that, the base was treated with a deep penetration primer to remove dust. For underfloor heating we will use metal-plastic pipe. cutting off right amount, bend it in a zigzag and attach it to the grid with plastic clamps. Where there will be a toilet and under the bath - we will not lay it.

We connect the metal-plastic to the heating system using special corners and fittings. At the entrance to the water heated floor, we will install a valve to regulate the water pressure and a Mayevsky tap. At the exit we will put a shut-off valve. This is done so that you can completely turn off the warm water floor during a possible accident.

After we connect everything into one system, we fill the base of the bathroom with self-leveling properties. Pour the contents of the bag with the dry mixture into a container with water and mix thoroughly with a mixer. Be sure to maintain the proportions indicated on the packaging, otherwise the manufacturer of the mixture does not guarantee the declared strength of the self-leveling floor. After pouring the mixture onto the screed, roll it with a spiked roller to expel air bubbles.

Having filled the entire area of ​​the bathroom, we rest for three days until the floors dry and gain the necessary further work strength.

After the rest, we proceed to the final stage of repair. In ventilation holes set decorative elements and an electric fan by connecting wires to it.

Now the hood is forced to work when the light in the bathroom is turned on. We install a new box for ventilation of the kitchen.

Don't forget to plug in the outlet.

The self-leveling floor is dry, so ceramic tiles can be laid on it. Here the technology is the same as when laying it on the walls. We stir the glue, apply it to the base, level it with a comb spatula, lay the tiles.

In the seams, as usual, we insert crosses. To lay tiles in places where pipes run, cut off tile cutter pieces. Remove excess glue with a damp cloth. Periodically check the horizontal building level. At the end, we also grout the seams.

Wait a day for the glue to dry.

Now you can lay the sewer. We will pull it from the kitchen, from the sink, to the riser. Where the bath and washbasin will be connected - we will install tees. We will provide a point for draining water from the washing machine. It is necessary to install pipes with a slight slope so that water flows into the sewer, and does not stagnate in them. For this we uselevel.

Connect the water supply to the entry point. Immediately after the tap, we will install a water meter, after it - the main water purification filter.

When connecting the counter with the nuts, we wind the linen thread and grease it with sealing paste.

The renovation is slowly coming to an end. Already n the time has come . It is installed on the frame that comes with it. Acrylic bathtubs are a modern industrial product. They are lighter than steel and cast iron, retain heat longer, are silent and practically do not fade.

First we assemble the frame, then we fasten the legs to it.

We fix the frame, connect drain valve and install the tub. Here we had a little confusion. The bathtub was not installed against the wall, as the width of the room was reduced due to the plaster. I had to sand the corner of the tub a little with sandpaper.

It did not affect the appearance and strength in any way, but it easily fell into place. Now you can connect it to the sewer. We install rubberized skirting boards on the sides, smearing them with sealant.

Next, we will put a floor cabinet with a sink, connecting the tap to the water supply system, and the drain to the sewer pipe.

Connect the faucet near the bath.

To install the toilet, you need to make marks in the places of its attachment to the floor,, insert plastic dowels into the holes and fix it with bolts, putting decorative plugs on top of them.

Connecting the toilet sewer riser with the help of corrugation. We connect the water to the tank - the toilet can be used.

We hang a wardrobe and a shelf for toiletries on the wall. We connect the shelf to the electrical network.

We will place various convenient little things on the walls.

Bottom acrylic bath close the screen, hang the curtain.

Attach the shower rack.

We install the washing machine in place, connecting it to the sewerage and water supply systems.

We glue skirting boards on the ceiling, hiding the bumps.

To prevent this from happening in the future, you must first decorate the walls, and then make the ceiling. This completes the DIY bathroom renovation.

Video

Every cultural modern man morning starts with a shower. And therefore we can safely say that the bathroom is almost the most important place in the house, because there a person receives a charge of vivacity for the whole day. In order to receive only positive and pleasure in the bathroom, the repair of this room must be done carefully and efficiently. And first you need to figure out where to start the repair, what is needed for this, how long it will take, etc. All these issues need to be resolved. Therefore, we will begin to understand in order.

Pre-project survey - that's what, in the bathroom, will be the most correct. To begin with, the room is examined in detail, and everything is taken into account - the height of the ceilings, the location main pipes, the dimensions of the new bathroom, the location of the shower stall and much more. In the project, you need to take into account the types of finishes, the design of the shut-off valves, the type of ventilation, lighting, design, interior and much more.

How to start a bathroom renovation? First you need to divide it into main stages. The most difficult and important thing in this business is to pick up plumbing and install it, as well as do the same with the pipeline and the power grid. Here you can not do without professional specialists.

The floor in the bathroom should be even and absolutely smooth, it is also very important that it is also waterproofed. Therefore, it will probably be necessary to make a screed, and then apply a special waterproofing coating. At the same time, it is desirable that the floor in the bathroom has a level lower than in other rooms. In the event that it is impossible to lower the level, care must be taken that the threshold to the bathroom is high.

If it so happened that the pipes in the bathroom of the apartment do not have thermal insulation, then the answer to the question of where to start repairing the bathroom is obvious - you need to correct this situation, otherwise you will have to "admire" the constant condensate on the icy pipes and dirty gray walls. Yes, and a pipe hot water will start to deform. She may even begin to destroy the wall. The same consequences can appear due to a poor-quality ventilation system.

Where to start the renovation in the bathroom, so that in the end there is a painstaking work? It is worth laying the electrical wiring so that the voltage is supplied to all devices - the hood, washing machine, heated floor, as well as provide a place that will be designed to turn on an electric shaver, hair dryer and other appliances that will be needed in the bathroom. It will be necessary to use grounded sockets, given the humidity of the room.

Without any repair we can not imagine. Their surface should be smooth and clean, the walls should be vertical, the corners should be rectangular.

So how much does a bathroom renovation cost? It depends on what material the owners of the apartment choose. For example, you can issue ceramic tiles walls in the bathroom, or you can just paint them with paint or whitewash. Naturally, in the first option, both the quality and the service life are better, but it is more expensive than painting. There are many other variety of materials. Which one to choose - the decision depends only on the owners of the apartment.

What do you think, what will the tile laid on the floor turn into if you start ditching immediately after it, and then? Quite right - at least the floor will have to be cleaned for a long and tedious time, and as a maximum, some tiles will need to be replaced. It is for this reason that when starting a bathroom renovation, it is extremely important to know in what sequence all work is done. In this article, together with the site site, we will analyze this sequence, answering the questions: where to start repairing the bathroom and how to finish it correctly?

The sequence of work in the repair in the bathroom

How to start a bathroom renovation: why plan it

Why planning is practically the most important stage of work, which provides for the sequence of repairs in the bathroom? Everything is very simple, when you know and visualize the end result, it is much easier to decide on the necessary building materials, and the question of the sequence of the repair, and many others. important nuances. At this stage, a person visually or on the drawings places all the plumbing and other appliances necessary for the comfortable operation of the bathroom, which allow you to visualize the layout of communications.

How to start a bathroom renovation

As a rule, this stage is the longest, even if you seek help from professional designers- believe me, both in their minds and in yours, a lot of all kinds of options will appear, which will either be discarded as not suiting you, then come back again. And so on until separate fragments all options will not combine into a single picture that meets the requirements of all members of your family. Only then can the next step be taken.

How to plan a bathroom renovation

Purchase of materials: how to save wisely

Everyone is familiar with the expression "greedy pays twice." It is the most in the best way displays a person's approach to purchasing the cheapest building material. Remember one simple truth - quality repair in a bathroom that will delight your eyes for at least 10 years, or even more, simply cannot be cheap. I'll say it a little differently, for example, using a cheap grout mixture for joints between tiles - this is a sure step towards distribution, the result of which may be repeated repairs after 2-3 years.

The bathroom is a special room in which the use of cheap building materials affects its lifespan. You can tile with low-quality adhesive in the kitchen or hallway, but not in the bathroom!

There are other options for answering the question of how to save money on repairs in the bathroom - for example, use the cumulative discount system, which is available in almost all hardware stores, or take on the performance of feasible work (dismantling and similar work that does not require special qualifications). In general, there are ways to save on cost, and not on the quality of repairs, and you need to use them.

Can you save money on bathroom renovations?

How to properly dismantle the bathroom

Despite the fact that dismantling does not require special qualifications, there are still certain rules. The most important of them sounds something like this - when dismantling something, you need not break it, but carefully disassemble it. And the point here is not at all to save for the purpose of later use a used construction material. It's all about safety. Yes, yes, you heard right - if you pick up a sledgehammer and start mindlessly destroying everything around, then more likely you will break the wrong thing or injure yourself.

Dismantling, or rather disassembly, no matter how it looks from the outside, is carried out strictly in the reverse order of installation. In general, sometimes, in order to protect yourself from various troubles, you have to think about how and what is more correct to cut off or beat off.

The sequence of repairs in the bathroom: photo dismantling

Now for the bathroom itself. The overhaul of the floor, walls and ceiling, associated with the replacement of all existing surfaces, is carried out right down to the base, just like in the Marseillaise of the same name (we old world destroy to the ground, and then ...) In general, the floor and ceiling will have to be cleaned up to the floor slabs, and the walls to brick or concrete. There is no other way to make high-quality, and most importantly, durable repairs.

If you can still somehow cheat on the floor and ceiling, then it’s better to clean the walls scrupulously and not rely on any holes drilled with a perforator or notches made with an ax. Sooner or later a layer between new finish and the base of the wall (old plaster, unpeeled paint, etc.) will make itself felt, and, believe me, this will not be very pleasant news.

Dismantling work in the bathroom photo

Installation of hidden communications: a delicate matter with big consequences with the wrong approach

As a rule, hidden communications in the bathroom also mean plumbing - they are mounted in pre-prepared strobes. Moreover, if we talk about the complete overhaul bathroom, then you need to replace not only the internal wiring of the electrics and plumbing, but also, and as for electricity, then make a new input to the bathroom.

It should be understood that the old electrical wiring in most cases does not match the loads of modern electrical appliances used in the bathroom. If earlier everything was managed exclusively by one, the power of which did not exceed 200W, now it is both, and, the total energy consumption of which can exceed 4.5 kW. This must be taken into account.

Repair of walls in the bathroom photo

In addition, the abundance of powerful consumers dictates some safety rules regarding not only electricity, but also water supply. In a modern bathroom, it is considered normal to have high-quality, RCD and circuit breakers, which are equipped with all powerful consumers.

As for, in order to avoid a scandal with neighbors, the so-called is installed on the risers - special sensors monitor the humidity of the floor and, in the event of water leaks, send a signal to electronic valves that block the flow of water from the riser.

What nuances you need to take into account before starting the repair of the apartment, including the bathroom, see the video.

Floor waterproofing: why is it necessary

On this occasion, I will only say one thing - a well-made one is able to hold and not let through to the neighbors from below up to 100 liters of water. Of course, it will not save you from a global flood associated with a rush of risers, but it will provide you with time to stop the water supply. In addition, there will be no need to worry about small leaks associated with human carelessness.

What is floor waterproofing? In fact, this is a trough, the bottom of which is the floor, and the sides are the bottom of the walls. To seal these surfaces, bituminous mastic and rolled rubberized insulation.

Bathroom floor repair photo

Leveling surfaces: the key to an excellent appearance of the room

If someone you know suggests that you don’t need to level the surface before tiling it (they say, this can be done during the laying of tiles), drive him to the neck. Some masters do just that, laying the tiles immediately on a large layer of glue or mortar. This should not be done for several reasons: firstly, large layers of glue or mortar float, from which the reliability of their setting with walls or floors decreases and, secondly, the budget for the purchase of the glue itself increases.

Why align the walls during a bathroom renovation

It is much cheaper to repair the walls in the bathroom with plaster or than to buy a ton of tile adhesive and line the walls with it. In addition, this approach to business does not ensure the gluing of tiles over its entire plane.

The final stages of work in the repair in the bathroom

I won’t paint much here - we’ll just present the remaining renovation work in the bathroom in the form of a list with explanations.

  • Surface cladding. First, the walls are tiled, and then the floor - the bottom row of wall tiles, called trimming, is laid after finishing the floor. It is important that at the end of laying the tiles stand for at least 2-3 days - only after this time can the seams be rubbed and work can continue.
  • Repair . Any type of ceiling is installed after final finishing premises.
  • mounted, like the ceiling, upon completion of the remaining finishing work.
  • Improvement of the premises, which means installation plumbing fixtures, lamps, shelves, mirrors and other accessories.

This is how the answer to the question looks like, where to start repairing the bathroom and how to finish it? As you can see, there will be many problems, and all of them will have to be solved, if not immediately, then along the way. I wish you good luck and achieve harmony in the interior of the bathroom!

What else to read