Instructions on labor protection for the installer on the installation of steel and reinforced concrete structures. Production instructions for the installer for the installation of steel and reinforced concrete structures

Job Responsibilities fitter depends on what kind of equipment he has to mount. Our sample installer job description is suitable for the regulation of a material handling equipment installer.

Installer job description
(Job instruction for a hoisting and transport equipment installer)

APPROVE
CEO
Surname I.O. ________________
"________"_____________ ____ G.

1. General Provisions

1.1. The installer belongs to the category of workers.
1.2. The installer is appointed to the position and dismissed from it by order CEO on the recommendation of the head of the structural unit.
1.3. The installer reports directly to the head of the structural unit.
1.4. A person who meets the following requirements is appointed to the position of an installer: initial professional or secondary professional education at least six months of experience in the relevant field.
1.5. During the absence of the installer, his rights and obligations are transferred to another official, which is announced in the order for the organization.
1.6. The installer must know:
- ways of installation of especially difficult equipment;
- methods of regulation and adjustment of equipment;
- rules for individual testing of equipment.
1.7. The installer is guided in his work by:
- legislative acts of the Russian Federation;
- Charter of the organization, internal labor regulations, other regulations of the company;
- orders and directives of the management;
- this job description.

2. Job responsibilities of the installer

The installer performs the following duties:
2.1. Carries out the installation of metal structures of portals, bridges, towers, arrows, supports and other load-bearing units of cranes.
2.2. Establishes mechanisms for the movement of cranes operating on curved tracks.
2.3. Installs electric winches and hydraulic lifts.
2.4. Carries out installation of rail captures.
2.5. Participates in the testing of cranes.
2.6. Performs other work on the installation of lifting and transport equipment.

3. Rights of the installer

The installer has the right:
3.1. Require the administration to ensure the rules of labor protection, safety and fire safety.
3.2. Require the provision of overalls in accordance with current regulations.
3.3. Submit proposals for the management to improve the work related to the this manual responsibilities.

4. Responsibility of the installer

The installer is responsible for:
4.1. For non-performance and / or untimely, negligent performance of their official duties.
4.2. For non-compliance with current instructions, orders and orders for the preservation of trade secrets and confidential information.
4.3. For violation of the internal labor regulations, labor discipline, safety regulations and fire safety.

This manual has been translated automatically. Please note that automatic translation does not provide 100% accuracy, so there may be minor translation errors in the text.

Instructions for the position " Construction fitter 4th category", presented on the site, complies with the requirements of the document - "DIRECTORY qualification characteristics occupations of workers. Issue 64. Construction, installation and repair and construction work. (Including additions approved: by order State Committee on construction and architecture N 25 of 08/08/2002, N 218 of 12/22/2003, N 149 of 08/29/2003, by letter of the State Committee for Construction and Architecture N 8 / 7-1216 of 12/15/2004 , by order of the Ministry of Construction, Architecture and Housing and Communal Services N 9 of December 2, 2005, N 163 of May 10, 2006 N 399 of December 5, 2006, by order of the Ministry of Regional Development, Construction and Housing and Communal Services of Ukraine N 558, 12/28/2010)", which was approved by the order of the State Committee for Construction, Architecture and Housing Policy of Ukraine on 10/13/1999 N 249. Approved by the Ministry of Labor and social policy Ukraine. Entered into force on January 1, 2000.
The status of the document is "valid".

Foreword

0.1. The document comes into force from the moment of its approval.

0.2. Document developer: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

0.3. Document approved: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

0.4. Periodic verification of this document is carried out at intervals not exceeding 3 years.

1. General Provisions

1.1. The position "Installer construction 4th category" refers to the category "Workers".

1.2. Qualifications- vocational education. Advanced training and work experience as a construction assembler of the 3rd category - at least 1 year.

1.3. Knows and applies:
- basic properties and grades of building steels;
- brand of concrete;
- types of prefabricated steel, concrete and iron concrete structures;
- methods of assembly and installation of structures made of individual elements and details;
- methods and techniques of assembly, installation of rigging, assembly, lifting equipment, devices and mechanisms during the installation of concrete, reinforced concrete structures medium weight, reinforcement, reinforcing structures;
- methods of slinging of structures to be mounted;
- rules for the installation of riser supports;
- methods of installation of steel welded railings;
- methods of manufacturing, assembly, installation and disassembly of scaffolds;
- methods of connection and fastening of structural elements;
- ways to install scaffolding during the installation of structures;
- methods and techniques for applying epoxy glue to reinforced concrete structures;
- types of sealing gaskets for sealing joints and methods of their gluing;
- ways of laying walls medium difficulty;
- laying methods simple walls with simultaneous lining;
- methods of laying walls of lightweight structures;
- methods of masonry from glass blocks;
- methods and rules of reinforcement brick walls and partitions;
- ways of marking out in a template or conductor and reconciliation according to sketches, drawings of reinforcing bars, simple meshes and flat frames;
- rules for preparing reinforcement for welding, incl. bath way;
- rules for concreting structures in winter period, methods of heating concrete;
- kinds antifreeze additives and rules for their use;
- rules for laying concrete with compaction by vibrators;
- rules for the installation and dismantling of formwork for structures of medium complexity and supporting scaffolding;
- basic requirements for the quality of materials and structures to be mounted;
- device and rules for the operation of electric and pneumatic tools, assembly pistols;
- types and fundamentals of the structure of concrete pumps, concrete pipelines, vibrators, vibrators, vacuum units;
- rules for performing work in accordance with technological maps;
- rules for compliance with fire and electrical safety;
- rules on labor protection during the performance of work at height;
- execution rules construction works on the operating enterprises, highways, bridges, roads and in their area.

1.4. A construction fitter of the 4th category is appointed to the position and dismissed by order of the organization (enterprise / institution).

1.5. Construction installer of the 4th category reports directly to _ _ _ _ _ _ _ _ _ _ .

1.6. A construction fitter of the 4th category supervises the work _ _ _ _ _ _ _ _ _ _ .

1.7. Construction fitter of the 4th category during the absence, is replaced by a person appointed in in due course which acquires the relevant rights and is responsible for the proper performance of the duties assigned to it.

2. Description of work, tasks and job responsibilities

2.1. Performs work of medium complexity during the installation and assembly of structures of buildings and structures from individual elements and enlarged blocks, masonry and repair stone structures buildings, bridges, industrial and hydraulic structures, manufacturing and installation of fittings and reinforcing structures; concreting of monolithic concrete and reinforced concrete structures.

2.2. Knows, understands and applies existing regulations relating to his activities.

2.3. Knows and complies with the requirements of normative acts on labor protection and environment, complies with the norms, methods and techniques for the safe performance of work.

3. Rights

3.1. The 4th category construction fitter has the right to take actions to prevent and eliminate the occurrence of any violations or inconsistencies.

3.2. A construction fitter of the 4th category has the right to receive all social guarantees provided for by law.

3.3. A construction fitter of the 4th category has the right to demand assistance in the performance of his duties and the exercise of rights.

3.4. A construction fitter of the 4th category has the right to demand the creation of organizational and technical conditions necessary for the performance of official duties and the provision necessary equipment and inventory.

3.5. A construction fitter of the 4th category has the right to get acquainted with the draft documents relating to his activities.

3.6. A construction fitter of the 4th category has the right to request and receive documents, materials and information necessary for the performance of his duties and instructions of the management.

3.7. A construction fitter of the 4th category has the right to improve his professional qualifications.

3.8. A construction fitter of the 4th category has the right to report all violations and inconsistencies identified in the course of his activities and make proposals for their elimination.

3.9. A construction fitter of the 4th category has the right to get acquainted with the documents that define the rights and obligations of the position held, the criteria for assessing the quality of the performance of official duties.

4. Responsibility

4.1. The 4th category construction fitter is responsible for non-fulfillment or untimely fulfillment of the duties assigned by this job description and (or) non-use of the rights granted.

4.2. A construction fitter of the 4th category is responsible for non-compliance with the rules of internal labor regulations, labor protection, safety, industrial sanitation and fire protection.

4.3. A 4th category construction fitter is responsible for disclosing information about an organization (enterprise/institution) that is a trade secret.

4.4. The 4th category construction fitter is responsible for non-fulfillment or improper fulfillment of the requirements of the internal regulatory documents of the organization (enterprise / institution) and the legal orders of the management.

4.5. A construction fitter of the 4th category is responsible for offenses committed in the course of his activities, within the limits established by the current administrative, criminal and civil legislation.

4.6. The 4th category construction fitter is responsible for causing material damage to the organization (enterprise / institution) within the limits established by the current administrative, criminal and civil legislation.

4.7. A construction fitter of the 4th category is responsible for the misuse of the provided official powers and use them for personal purposes.

5. Examples of work

5.1. Installation of prefabricated concrete and reinforced concrete foundation blocks weighing up to 8 tons, heads and blocks of field grillages, prefabricated reinforced concrete beams with a span of up to 12 m (except for crane beams), prefabricated reinforced concrete panels, floor slabs and coatings, beams, partitions, flights of stairs and platforms, steps, balcony slabs and blocks, ventilation blocks, ordinary large blocks of walls, simple steel structures(stairs, landings, fences, support legs, brackets, scaffolding), prefabricated suspended ceilings from gypsum boards metal frame, steel roof decking.

5.2. Installation, dismantling of panel board metal and wooden formwork from boards up to 3 m2.

5.3. Installation of reinforced concrete poles.

5.4. Installation of racks, support letters.

5.5. Lifting and installation of support parts with attachment to support letters.

5.6. Sheathing with sheet steel of steel and concrete structures.

5.7. Ordering the filling of openings and partitions made of glass profiles.

5.8. Installation of pins for hanging armored mesh.

5.9. Fastening permanent bolted connections.

5.10. Installation of high strength bolts.

5.11. Enlarged assembly of blocks of embedded parts.

5.12. Concreting of slot blocks of embedded parts.

5.13. Sealing of joints of beams, purlins, crossbars with columns.

5.14. Caulking, pouring, jointing of seams and joints of partitions in prefabricated reinforced concrete structures.

5.15. Installation and dismantling of panel formwork.

5.16. Filling of the support core with concrete.

5.17. Concrete paving with compaction by vibrators.

5.18. Anticorrosive painting of embedded parts.

5.19. The device of thermal insulation of external joints of prefabricated buildings with mineral and synthetic materials.

5.20. Sealing joints with special sealants using pneumatic tools, sealing gaskets.

5.21. Fastening parts on concrete and reinforced concrete surfaces using a construction and assembly gun.

5.22. Applying epoxy adhesive to reinforced concrete structures.

5.23. Laying walls of medium complexity from bricks, small blocks for plastering and with opening joints simultaneously with masonry, simple walls made of bricks with simultaneous cladding, simple walls of lightweight construction of walls and foundations from rubble stone under the blade, wells of constant cross section, rectangular collectors, structures made of glass blocks.

5.24. Ordering the filling of openings and partitions made of glass profiles.

5.25. The device of partitions made of bricks, gypsum slag and other plates.

5.26. Installation of steel elements and parts in masonry.

5.27. Installation of window and door balcony frames, blocks, window sill boards and plates.

5.28. Jointing the seams of masonry made earlier.

5.29. Repair of the surface of brick walls with the removal of unsuitable bricks, walling up with new bricks, observing the binding of seams with existing masonry.

5.30. Dismantling of brick vaults of all types.

5.31. Replacement of window sills, individual steps of flights of stairs.

5.32. Repair and replacement of individual sections of brick and rubble foundations in existing structures.

5.33. Bending of reinforcing steel using manual and driven machines, in the case when the rod has more than four bends.

5.34. Assembly and installation of simple reinforcing mesh flat frames weighing more than 100 kg, double reinforcing meshes weighing up to 100 kg.

5.35. Installation of reinforcement from individual rods in arrays, knee pads, pillars, walls and partitions.

5.36. Pre-tensioning of reinforcing bars and column bundles.

5.37. Installation of anchor bolts and embedded parts in structures of medium complexity.

5.38. Checking installed reinforcing meshes and frames.

5.39. Clearing of reinforcing outlets for bath-seam welding.

5.40. Laying the concrete mixture in the formwork of columns, walls, beams, slabs, etc.

5.41. Installation and repair of concrete floors.

5.42. Installation and repair of clean cement floors with cutting into strips and checkers.

5.43. Tidying up clean cement floors by vacuuming.

5.44. Smoothing the surface with metal trowels with cement filling.

5.45. Electric, steam heating of concrete.

Wide application in modern construction a large number various metal structures, leaves its mark on the requirements for specialists involved in the installation.

Basic requirements for a steel structure assembler

The scope of duties of a steel structure installer is wide. Regardless of the category, each worker must pass special education and have an appropriate document confirming the qualification level. As a rule, such specialists have secondary specialized, and often - and higher education. Also, depending on the characteristics of the operations performed, it is sometimes required to take special courses confirming the ability to perform work of increased responsibility. Many certificates require confirmation after a certain period of time.

The presence of a qualification document is mandatory when applying for any job. In addition to directly owning a specialty, each employee involved in the installation of high-rise facilities must necessarily undergo a medical examination and have no contraindications due to the state of work.

Qualifying Skills

Construction site - the object on which the focus is big number potentially dangerous factors: from lifting mechanisms to storage structures. Training and control of knowledge of normative documentation - required condition for admission to work of any installer, regardless of the category and job requirements.

To summarize the requirements, a structural steelworker must:

  • perform slinging operations - know how to secure the load and manage lifting operations;
  • ensure the installation of metal structures on the foundations and fastening of the nodes to each other;
  • carry out pre-assembly of mechanisms;
  • read assembly or other drawings;
  • perform cutting, welding and other types of metal processing;
  • be able to provide a reliable bolted, welded or other connection;
  • know and follow regulatory requirements labor protection;
  • know the collective agreement, other legal and regulatory documents that guide the construction organization in its activities.

Modern approaches to construction require constant professional development. Today it is not enough to be just a welder or a slinger. On the modern market of labor are valued by universal professionals. Therefore, mastering new special skills increases the chances of a high-paying job. Everywhere there are free and paid courses that allow you to learn new installation professions that allow you to be in demand during the construction

_ 232. Installer for the installation of steel and reinforced concrete structures, 2nd category

Characteristics of works. Performing the simplest work during the installation of steel and prefabricated concrete and reinforced concrete structures.

Must know: main types of rigging. Types of slings and gripping devices. Rules for signaling during installation. Tools and fixtures used in the installation of building structures.

Work examples. Hooking steel, concrete and reinforced concrete structures with inventory slings for mounting loops, brackets, hooks, etc. Threading of bolts and nuts. Works on hand winch. Cleaning surfaces for insulation. Reopening of hardware. Manual punching of holes and furrows in concrete and reinforced concrete structures. Installing and removing bolts.

_ 233. Assembler for the installation of steel and reinforced concrete structures, 3rd category

Characteristics of works. Performance simple jobs during installation and pre-assembly of steel and prefabricated concrete and reinforced concrete structures.

Must know: main types of parts of steel and prefabricated concrete and reinforced concrete structures. Types of main rigging and mounting hardware and fixtures. Rules for the transportation and storage of structures and products. Devices and methods of temporary fastening of structures. Simple Ways checking the density of welds. Main properties and brands concrete mixtures. Rules for preparing surfaces for insulation. The device of electrified and pneumatic tools and the rules for working with them. Methods for protecting metal from corrosion.

Work examples. Cleaning joints of assembled structures. Fastening mounting bolted connections. Installation of self-tapping bolts. Coating with kerosene and chalk of welds when checking their density. Straightening of shaped steel on manual screw presses. Slab laying pavement. Temporary fastening of structures. Warming of concrete and reinforced concrete structures. Concrete embedding of joints and multiple places. Sealing with brick or concrete ends of beams, furrows, nests, potholes and holes. Installation of prefabricated partitions and internal walls from gypsum panels on a metal frame. Sealing joints with special sealants applied with a brush or spatula. Manual preparation of thiokol sealants.



Decree State Committee for Labor of the USSR and Gosstroy of the USSR dated April 23, 1991 N 91/17, changes were made to the tariff and qualification characteristics of the profession "_ 234. Assembler for the installation of steel and reinforced concrete structures of the 4th category"

_ 234. Assembler for the installation of steel and reinforced concrete structures, 4th category

Characteristics of works. Performance installation work medium complexity when assembling structures of buildings and structures from individual elements and enlarged blocks.

Must know: basic properties and grades of building steels. Concrete grades and types of prefabricated concrete, reinforced concrete and steel structures. Methods of assembly and installation of structures from individual elements. Methods for mounting pipes up to 30 m high from blocks of heat-resistant reinforced concrete. Methods and techniques for mounting reinforcing and armored meshes in reactors. Methods and techniques for assembling and installing rigging and lifting equipment and fixtures during the installation of medium-weight structures. Ways of slinging mounted structures. Ways of connections and fastenings of structural elements. Ways of scaffolding during the installation of structures. The main requirements for the quality of mounted structures. The device of construction and assembly pistols and the rules for their operation. The device of pneumatic tools and the rules for working with them. Methods and techniques for applying epoxy adhesive to reinforced concrete structures. Types of sealing gaskets for sealing joints and methods for sticking them.

Work examples. Installation of prefabricated reinforced concrete and concrete foundation blocks weighing up to 8 tons, heads and pile grillage blocks. Installation of prefabricated reinforced concrete beams with a span of up to 12 m (except for crane beams). Installation of prefabricated suspended ceilings from gypsum panels on a metal frame. Installation of prefabricated reinforced concrete panels and floor slabs and coatings, including floors of HPP installation sites. Installation of prefabricated reinforced concrete passenger platforms. Installation of flights of stairs and platforms, ordinary large blocks of walls and balcony blocks. Installation of studs for hanging armored mesh. Installation of reinforcing and armored meshes in reactors. Mounting steel frames industrial furnaces weighing up to 5 tons and heat-shielding structures of furnaces from blocks weighing up to 1 ton. Installation of metal structures of supports and stations of cable cars and cable cranes, as well as steel ropes at a height of structures up to 30 m. Installation of pipes up to 30 m high from blocks of heat-resistant concrete. Prefabricated laying reinforced concrete slabs bridges and flyovers. Cladding with slabs of channels and slopes of dams. Sealing of joints of beams, girders and crossbars with columns. The device for filling openings and partitions from glass profiles. Caulking, pouring and jointing of seams and joints in prefabricated reinforced concrete structures. Installation of simple steel structures: stairs, platforms, fences, support posts, brackets, scaffolding, scaffolding, etc., as well as structures of medium complexity weighing up to 5 tons: beams, girders, half-timbered elements, ties, etc. Laying of steel decking on platforms, brake farms, etc. Sheathing with sheet steel of steel and concrete structures. Installation of steel roofing. Fastening permanent bolted connections. Installation of high strength bolts. Anti-corrosion coating of embedded parts. Enlarged assembly of blocks of embedded parts. Concreting of slot blocks of embedded parts. Pre-installation of embedded parts. Installation in the grooves of the gates of hydraulic structures and trash grates. Assembly of shells and links of oversized pipelines of hydraulic structures. The device of thermal insulation of external joints of prefabricated buildings with mineral and synthetic materials. Sealing joints with special sealants using pneumatic tools, as well as sealing gaskets (gernit, poroizol, etc.). Fastening parts on concrete and reinforced concrete surfaces using a construction and assembly gun. Applying epoxy adhesive to reinforced concrete structures. Installation and dismantling of panel metal and wood-metal formwork from panels with an area of ​​up to 3 sq.m.

Decree State Committee for Labor of the USSR and Gosstroy of the USSR dated April 23, 1991 N 91/17 in the tariff and qualification characteristics of the profession "_ 235. Fitter for the installation of steel and reinforced concrete structures of the 5th category"

See the text of the tariff-qualification characteristics in the previous edition

_ 235. Assembler for the installation of steel and reinforced concrete structures, 5th category

Characteristics of works. Performing complex installation work when assembling structures of buildings and structures from individual elements and enlarged blocks.

Must know: methods and techniques for mounting heavy precast concrete columns, foundation blocks and beams. Methods for installing and fixing panels, large wall blocks and cornice blocks. Methods for mounting steel structures of buildings and structures with separate heavy elements or blocks. Methods and techniques for mounting heavy steel columns and beams of industrial furnaces. Methods for installing and fastening panels lined with heat-resistant concrete and large blocks. Methods for pre-assembly of steel structures of industrial furnaces. Methods for mounting pipes with a height of more than 30 m from heat-resistant concrete blocks. Ways of conjugation of steel structures with blocks of heat-resistant concrete. Methods for installing protective covers from of stainless steel. Methods for pre-assembly of steel structures of bridges and assembly of spans of bridges on scaffolds. Ways of interface of elements of superstructures of bridges at hinged, semi-mounted and balanced assembly. Methods and techniques for assembling and installing rigging and lifting equipment and fixtures during pre-assembly and installation complex structures buildings and industrial structures, as well as pre-assembly of structures and assembly of spans of bridges on scaffolds. Methods for complex slinging of structures and blocks.

Work examples. Installation of prefabricated reinforced concrete and concrete foundation blocks weighing more than 8 tons and columns up to 20 tons. Installation of column capitals. Installation of prefabricated reinforced concrete beams with a span of more than 12 m and crane beams. Installation of large-sized panels of external and internal walls and partition panels made of heavy and light concrete. Installation of sanitary cabins, blocks of elevator shafts and other three-dimensional elements of buildings. Installation of wall and corner large blocks and cornices. Assembly and alignment of the embedded parts of the slot block in the conductor before concreting. Installation of embedded parts of segmental valves with sealing devices. Installation of steel facings, confusers, diffusers. Installation of straight sections of oversized pipelines of hydraulic structures. Installation of prefabricated reinforced concrete floor slabs for spillway dams and spiral chambers, stop plates and slabs for dowels, inspection shafts and facing blocks of hydroelectric power plant structures. Reinforcement of the guide grillage with ties and a section of the truss slab, as well as the installation of berths from prefabricated reinforced concrete slabs using floating cranes. Installation of reinforced concrete shells of giant arrays. Installation of steel frames of industrial furnaces weighing more than 5 tons and heat-shielding structures of furnaces from blocks weighing more than 1 ton. refractory reinforced concrete blocks. Installation and dismantling of mounting platforms during pipe installation. Connection of pipe blocks with high-strength studs. Installation of prefabricated hogs and gas ducts. Installation inside the reactors of a protective casing made of heat-resistant stainless steel. Installing a rail track in a tunnel kiln. Pre-assembly of steel truss and truss trusses, columns, tsargs blast furnaces, roof panels, etc. Enlargement assembly and installation of coating blocks. Membrane installation. Guiding joints during the installation of structures. Guidance and installation on supports of steel truss and truss trusses with a span of 12 to 24 m. Installation of steel columns weighing up to 15 tons, crane and other beams weighing from 5 to 15 tons. Installation load-bearing structures flyovers, cooling towers, galleries and whatnots. Installation of panel elements of steel superstructures of bridges. Assembly and installation of complex units of span structures of bridges with the number of elements up to 5. Statement of longitudinal and transverse braces of steel span structures of bridges. Installation of reinforced concrete tanks with a capacity of up to 1000 m3. Installation of structures made of aluminum and soft alloys. Large-scale assembly and installation of tank structures with a capacity of up to 1000 m3 from rolled blanks, individual drawers or sheets. Installation and dismantling of panel metal and wood-metal formwork from panels with an area of ​​more than 3 sq.m. Installation and dismantling of volumetric formwork (block, tunnel, volume-adjustable, etc.).

_ 236. Installer for the installation of steel and reinforced concrete structures, 6th category

Characteristics of works. Performing particularly complex installation work when assembling structures of buildings and structures from individual elements and enlarged blocks.

Must know: methods of pre-assembly of especially complex structures of buildings and industrial facilities. Methods of installation of especially large overall and heavy structures of buildings and industrial facilities. Methods for assembling, moving and installing spans of bridges. Methods and techniques for assembling and installing especially complex types rigging and lifting equipment and fixtures. Methods for especially complex non-standard slinging of structures and volumetric blocks. Methods for sheet and industrial installation of tanks and gas holders. Methods for pre-assembly of steel structures with elements of industrial furnaces made of heat-resistant concrete and reinforced concrete. Methods for pre-assembly of pipes from blocks (tsarg). Ways of installation of industrial furnaces from prefabricated heat-resistant concrete and reinforced concrete by the method of shifting and pipes by the method of rotation. Methods for mounting the lining of rotary kilns from heat-resistant concrete blocks.

Work examples. Pre-assembly of reinforced concrete frames, beams and trusses with subsequent tension of reinforcement. Larger assembly of prestressed reinforced concrete trusses, consisting of several parts, and installation of these trusses. Installation of reinforced concrete structures of buildings and structures from prefabricated frames, as well as spatial blocks of heat and hydraulic structures. Final alignment of embedded parts. Installation and final alignment of concreted slot blocks of embedded parts. Installation of leveling towers. Installation of pressure pipeline supports. Installation of steel structures of towers and cableway stations and cable cranes, as well as steel ropes with a height of structures over 70 m. Installation of fittings, compensators and hydraulic test oversized pipelines of hydraulic structures. Installation of prefabricated reinforced concrete columns weighing more than 20 tons, stress-reinforced beams and floor trusses, regardless of their span. Installation of visor beams, shafts and wells for dowels, slab shells, beams of bridge crossings through hydroelectric power plants, dams and locks, slabs and floors of lock galleries and suction pipes. Installation of space frames and grillages for driving piles. Installation of spatial elements of silos. Installation and final alignment of steel columns, crane beams and other steel structures of the frames of buildings and industrial structures with an element or block mass of more than 15 tons, as well as trusses with a span of more than 24 m. factories, etc. Pre-assembly of furnace structures from panels and blocks. Installation of industrial furnaces and pipes with enlarged units. Installation of industrial furnaces on the stand with subsequent sliding into the design position. Installation of prefabricated pipes by turning around a hinge fixed on the foundation. Installation of lining of rotary kilns from heat-resistant concrete blocks. Acquisition of parts for submission for installation of buildings, industrial structures and superstructures of bridges according to assembly diagrams. Assembly and installation of particularly complex units of bridge spans with more than 5 elements. Installation of bearing parts of bridge spans. Installation of the upper rolling tracks and their fastenings to the truss nodes. Installation of television and radio towers. Installation of metal and reinforced concrete cylindrical tanks with a capacity of more than 1000 m3, buried trench, spherical tanks and gas tanks, regardless of capacity. Installation of cable structures. Mounting by sliding and turning method. Assembly of composite reinforced concrete beams of superstructures of bridges.

I approve

CEO

LLC "ACCOUNTING ONLINE.RU" __________ Dmitriev S.A.

JOB INSTRUCTIONS FOR THE INSTALLER OF PRODUCTS FROM PVC PROFILE

1. GENERAL PROVISIONS

1.1. This job description defines the duties, rights and responsibilities of an installer of PVC profile products.

1.2. The installer of PVC profile products belongs to the category of workers.

1.3. The installer of PVC profile products is appointed to the position and dismissed from
positions by order of the General Director of the organization on the proposal of the head of the installation and service department.

1.4. The installer of PVC profile products obeys (receives orders, workers
orders, etc.) directly to the head of the installation and service department.

1.5. The installer of PVC profile products in his work is guided by:
– technical regulations, other guidance materials,
regulating the performance of work entrusted to the installer of PVC profile products;
- the charter of the organization;
– local regulations, administrative documents issued by
the head of the organization, orders of the head of the installation and service department;
- this job description.

1.6. During the absence of an installer of PVC profile products (vacation, illness, etc.), his duties are performed by a duly appointed person who acquires the appropriate rights and is responsible for the performance of the duties assigned to him.

2. QUALIFICATION REQUIREMENTS

2.1. A person who has
the average special education and/or at least three years of work experience.

2.2. The installer of PVC profile products must know:
general information on the technology and procedure for carrying out work on the installation of products and
PVC profile structures (windows, doors, slopes, etc.);
- methods of assembling and performing installation work of products and structures made of PVC profiles;
- the procedure and methods for planning installation, adjustment and test work;
- device and rules for using the rigging equipment used
(connectors, chains, carabiners, cables, steel ropes, etc.);
- ways to check the dimensions of products;
- the simplest ways of reconciliation of mounted products;
- methods of using assembly and mechanized tools;
- methods of moving products and equipment using a mechanized
rigging equipment;
- the device of mounted products and the technology of their installation;
- requirements for the quality of work (services) performed, for rational
organization of work in the workplace;
- types of marriage and ways to prevent and eliminate it;
- fastening methods;
- types and marking of materials used;
- rules for the use of funds personal protection and security;
- labor regulations;
– rules of labor protection, industrial sanitation and personal hygiene, fire
security.

3. JOB RESPONSIBILITIES

The installer of PVC profile products is obliged to:

3.1. Receive and study the technical specifications for the performance of work in advance.

3.2. Carry out only the work specified in the terms of reference. Suggest
Customer additional services and charge for it without the consent of the boss
installation and service department is prohibited.

3.3. Start work only after checking the workplace for
compliance with safety requirements.

3.4. If the Customer's property is in the work area, warn him about it.

3.5. When working at height, prepare the necessary equipment, construction towers.

3.6. Objectively tell the Customer about all stages of the upcoming work.

3.7. Carry out work on measuring , installation (assembly) of products and structures made of PVC-
profile (windows, doors, slopes, etc.), including:
– Departure to the client for the implementation of measurements necessary for the manufacture of the product;
– checking the completeness of the order (products, accessories and their dimensions);
– inspection of elements of products (structures) and components for the absence of obvious defects;
- measurement of products (structures) in order to identify a gross error in the overall
sizes;
- other preparatory work before installing the product;
– dismantling of the old product;
– preparation of window / door and other openings for installation (mounting) of the product
(constructions) from PVC profile;
– installation of a new product (construction);
– installation of ebbs, slopes, fixtures, window sills and other related
product elements;
– adjustment of fittings;
– verification and demonstration to the Customer of the operability of the product (construction), fittings and
other elements;
– informing and showing the Customer the rules for the operation of the product (structures);
– cleaning construction debris and waste building materials in the work area;
- preparation of the necessary documentation.

3.9. Communicate politely with the Customer, take care of his property.

3.10. Bring to the Customer only what is permitted by the head of the installation and service department.
department information.

3.11. Strictly observe the operating mode of production, office and facilities of the Customer.

3.12. Arrive at the Customer's facility at the time strictly agreed with the Customer. Delays shall be reported to the Customer additionally.

3.13. Ensure the installation of structures, components, etc. in accordance with
technical documentation requirements.

3.14. Perform work independently without involving other installation teams (if
otherwise not established by the terms of reference) and unauthorized persons.

3.15. Be constantly available mobile communications and/or regularly communicate your
location, delays in the schedule, arrival at the Customer's facility, completion of work at the facility in another available way.

4. RIGHTS

The installer of PVC profile products has the right to:

4.1. Demand the creation of normal conditions for the performance of official duties provided for by this instruction. Including the provision of the necessary equipment, inventory, personal protective equipment, benefits and compensation for working in working conditions that deviate from normal.

4.2. To get acquainted with the decisions of the management of the organization regarding its activities.

4.3. Make proposals for improving the work related to the responsibilities provided for in this instruction.

4.4. Request information and documents through the immediate supervisor,
necessary for the performance of their duties.

4.5. Improve your professional qualifications.

5. RESPONSIBILITY

The installer of PVC profile products is responsible for:

5.1. For improper performance or non-performance of their official duties,
provided for by this job description, - within the limits determined
the current labor legislation of the Russian Federation.

5.2. For offenses committed in the course of carrying out their activities - in
limits determined by the current administrative, criminal and civil
the legislation of the Russian Federation.

5.3. For causing material damage - within the limits determined by the current
labor and civil legislation of the Russian Federation.

5.4. For violation of the Labor Regulations, fire safety and safety regulations established in the organization.

Familiarized with the instructions, received a copy: ______________ / _________________ / "___" _______ 201_g

What else to read