Installation of generators from a to z. Installation of power plants Estimate for the installation of a diesel generator set

Pre-installation visit

When purchasing stationary diesel power plants, customers often have many questions related to its further correct installation and installation cost. In order to accurately answer these questions, it is necessary to conduct a pre-installation visit of the engineer to the facility. As a result of the inspection, the main tasks are determined, based on the capacity of the power plant, a decision is made on the feasibility of full or selective reservation of the facility. Based on the data received, a connection project and an estimate for consumables and work are drawn up. After the customer approves the estimate and terms of work, the installation of the power plant is carried out.

Power plant installation, usually includes the following activities:

  • Construction of a building for a diesel power plant or modification of an existing one in accordance with the project
  • Construction of a foundation for a diesel power plant or making a site for a containerized diesel generator set
  • Installing a diesel generator on a foundation
  • Creation of openings under the blinds and the exhaust system of the generator
  • Installation of additional equipment: inlet and outlet louvres of the ventilation system, a reinforced muffler that significantly reduces noise levels, an additional fuel tank)
  • Manufacture and connection of the exhaust pipeline, as well as lines of the additional fuel tank
  • Installation of an automation cabinet, protective circuit breakers, manual switches, blinds electric drives
  • Connecting the diesel generator set to the automatic start and control system - power and control cable. Laying cables in channels, boxes, trenches in accordance with the project
  • Cable marking and lugs installation
  • Preparation of the ATS connection to the network - installation of a power cable with lugs, assembling the connection diagram (without connecting to the network)
  • Connection of blinds electric drives to DGU, cable arrangement in boxes, along trays, in cable channels - depending on the project. Cable marking.
  • The device of a ground loop or connection of a diesel generator set to an existing ground loop.
  • Conducting tests of cable lines and ground loops and delivery of works to the customer and interested organizations.

Commissioning worksinclude:

  • Monitoring the compliance of the work performed with the project. Delivery documentation control
  • Checking the correct electrical connections, testing if necessary
  • Control of DGU refueling with working fluids (oil, antifreeze, diesel fuel, electrolyte in batteries)
  • Connecting the power plant to the city power grid
  • Carrying out inspections in accordance with the PUE, the requirements of the manufacturer
  • Testing the GU in all modes with the removal of characteristics (adjusting the output characteristics if necessary)

Delivery of the object to the customer

  • Delivery of work to the customer with the execution of acts of commissioning of the generating set
  • Instructions to the customer on the rules and methods of working with the installed power plant
  • Examples of installations of power plants:

    Example #1

    Installation of a SDMO T16 K IV diesel generator in a cottage village near Shishkino Les.
    The generator is implemented in a noise-proof version (casing), equipped with an automatic start system, voltage stabilizers, and an uninterruptible power supply (UPS).

    Example #2

    Installation of a Cummins C 33 D5 (33 kVA) power plant in a cottage settlement in the Vatutinok area (Kaluga Highway). The diesel generator is mounted in a garage, equipped with supply and exhaust ventilation, equipped with an industrial silencer and automation.

    Installation, configuration and launch of all types of power generating devices (DGU) is one of the key activities of ENERGO+ LLC. Our experts carry out fast and high-quality installation of diesel generators at affordable prices.

    Modern generator sets are technically complex equipment, the correct installation and configuration of which determines the efficient and trouble-free operation of a backup source of electricity. Quite often, poor-quality and unprofessional installation of power plants causes premature failure of the diesel generator and even emergency situations.

    Experienced employees of ENERGO+ perform installation and commissioning of power generating equipment. The complex of installation works includes:

    • checking the correct placement of the DGU on the working site and its connection to the consumer's power grid;
    • equipment with an exhaust gas system for the correct operation of an internal combustion engine;
    • connection of equipment control systems and remote control devices for the operation of the unit;
    • checking the correctness of all electrical connections and grounding of station equipment;
    • equipment testing in all modes and characterization of the operating DGU.

    It should be noted that the moment of putting a diesel generator into operation is quite responsible and it is very important that real specialists manage this process. Since the work is carried out by qualified engineers of the company, the client will not have to doubt the correct installation of the power plant, filling in engine oil and coolant, electrolyte in batteries, fuel in the tank and starting the unit.

    Highly qualified installers, which ENERGO+ LLC has at its disposal, will quickly and efficiently perform the installation of power generating equipment of any manufacturer, as well as perform commissioning. They have undergone special training at the factories of manufacturers, have the appropriate level of access and certificates.


    Price list for installation works (not including materials)
    Service up to 10 kW 10-20 kW 20-40 kW 40-60 kW 60-80 kW
    Station grounding device
    Laying a power cable in the air or along a prepared track (price per 3 meters)
    Preparation of cable routes, site preparation, earthworks

    After receiving the technical specifications from the customer

    Laying a power cable indoors (in a box, etc.). Price for 3 meters
    Laying the control cable in the room
    Production of a hole for the gas exhaust of a standard size (d up to 80)
    Production of 2 standard openings for supply and exhaust ventilation (brick)
    Production of 2 standard openings for supply and exhaust ventilation (concrete)
    Installation of the AVR block
    Installation of the gas exhaust system (price per 3 meters)

    Calculation of the departure of a specialist

    • Departure in Moscow and MO:
      from 4 000 rub. (the amount is taken into account when ordering equipment).
    • Train/air travel:
      Specify by phone.

    professional installation of diesel generators― one of the services that can be ordered at Generator KBT! We provide turnkey services, therefore, when purchasing a diesel power plant from us, you have the opportunity to order comprehensive services for its installation and commissioning.

    Why is it important?

    Installation and commissioning of diesel generators should be handled by experts in the field. Only they are able to carry out the work competently, in full compliance with the manufacturer's recommendations, compliance with current norms and standards. When carrying out work, the specialists of "KVT Generator" must take into account the following:

    • the conditions under which the equipment will be operated;
    • compliance with fire and technical standards;
    • correct preparation of the premises or site for the installation of the generator;
    • accounting and monitoring of noise level;
    • providing convenience during repair work and maintenance.
    Price list for installation works (not including materials)
    Service up to 10 kW 10-20 kW 20-40 kW 40-60 kW 60-80 kW
    standard premium standard premium standard premium standard premium standard premium
    Laying a power cable in the air or along a prepared track (price per 3 meters) 2 420 3 390 3 630 5 090 5 450 7 630 8 180 11 450 12 270 17 180
    Installation of the AVR block 1 940 2 910 2 910 4 360 4 360 6 540 6 540 9 820 9 820 14 720
    Station grounding device 4 360 5 820 6 540 9 820 9 820 14 730 14 730 22 090 22 090 33 140
    Preparation of cable routes, site preparation, earthworks Only after the Customer provides technical specifications
    Laying a power cable indoors (in a box and d ). Price for 3 meters 3 390 4 360 5 090 6 540 7 630 10 840 10 840 16 260 16 260 24 400
    Laying the control cable in the room 1 450 1 940 2 180 2 910 2 910 4 360 4 360 6 540 6 540 9 820
    Production of a hole for the gas exhaust of a standard size (d up to 80) 4 360 4 850 5 330 6 300 6 790 7 270 7 760 8 240 8 730 9 210
    Production of 2 standard openings for supply and exhaust ventilation. Wall material: brick 7 760 9 210 9 700 12 120 12 120 15 150 15 150 18 940 18 940 23 680
    Production of 2 standard openings for supply and exhaust ventilation. Wall material: concrete 9 700 12 120 12 120 15 150 15 150 18 940 18 940 23 680 23 680 29 600
    Installation of the gas exhaust system (price per 3 meters) 2 420 3 630 3 630 5 450 5 450 8 180 8 180 12 270 12 270 18 410
    Installation of supply and exhaust ventilation (inertial blinds) 3 630 4 540 5 450 6 820 7 820 10 230 10 230 15 350 15 350 23 020
    Installation of supply and exhaust ventilation (blinds with electric drive) 4 120 5 150 6 180 7 720 7 720 11 580 11 580 17 380 17 380 26 070

    Price diesel power plants cannot be compared with the cost of repairing breakdowns due to improper installation and start-up!

    Work procedure

    Installation of a diesel generator is a whole complex of works, which includes the following:

    • general construction works (if necessary);
    • carrying out relevant electrical work;
    • verification of compliance of the installation of equipment with technical requirements;
    • starting the generator and testing in all modes of operation;
    • carrying out adjustments in accordance with the results of the preliminary launch;
    • starting the generator and demonstrating its capabilities to the customer;
    • carrying out tests with the customer according to a previously drawn up plan;
    • instruction of service personnel.

    Price installation of diesel power plants calculated on an individual basis. You can find out by calling us or filling out an online application on our website. Contact us!