It is usually necessary to build a sewer system when building a new house. In this case, it is necessary to prepare for work and follow the recommendations of professionals. You also need to stock up on certain tools. Sewerage will make life much more comfortable. It should also be borne in mind that only a few days will be spent on work, and almost all procedures can be done by hand. Pumping of sewer wells is carried out by special services.
Not every cottage owner can hire a professional team of builders who will install a sewer well. In addition, if you follow the instructions, there will be no difficulties during the construction process. First you need to choose the type of septic tank for a private house.
There are several main types of septic tanks:
Sewer systems in the country can be performed in various forms. The simplest structure is a round shaft, or an installation in the form of a rectangle. Such wells are quite easy to install and maintain.
One of the main problems that arise during the construction of a septic tank in the country is the choice of its installation site. In the case of hiring a professional team, you don’t have to worry about the intricacies of installing a well. However, if you decide to equip it yourself, you will have to learn about the special norms of SNIP.
First you need to more carefully get acquainted with the area on which it is planned to install the well. It is necessary to determine where the pipe will be removed from - from the basement or basement. It is also necessary to determine on which side of the building to place the septic tank.
Attention! The installation site of the storage well in the country house must be made such that it is accessible for the access of equipment that pumps out wastewater. It should be equipped with access roads.
It is also worth considering a few other features of choosing a place:
When installing a sewerage system in a country house, it is important to take into account that only when all the subtleties of installation are completed, the comfort of staying in the house can be ensured.
Installation of a sewer well on the site is carried out within a few days. Before determining the volume of the structure, you should find out which well will be installed in a particular place. If a storage structure is arranged, it is better to make it quite large. This will ensure less frequent cleaning.
However, the impressive volume suggests the presence of a large amount of sewage. It will take much more time to clean the structure than in the case of a small tank. To accurately determine the size of the well, its indicators should be calculated using a special formula, depending on the size of the house and the number of people living in it.
Attention! The water consumption and the volume of the well also depend on the volume of water consumption and certain conditions for using the sewer system.
It is worth considering the average data:
It is worth noting that with the frequent invitation of guests, additional waste of water should be taken into account. It must also be remembered that the level of wastewater should not reach 1 m from the top edge of the structure. If you do not monitor the level of wastewater, they can easily overflow.
Rotary and nodal wells are made smaller. For example, a drop structure will be sized to take into account the height of the drop. The stronger the drop is made, the larger the well should have. However, there is a certain limitation - it is not worth performing it deeper than 3 m. This is due to the fact that cleaning the structure in this case will be very difficult.
When deciding whether to make the well airtight or leave a certain number of holes for the outlet of wastewater, you should familiarize yourself with the GOST standards. Sewer wells with more than 1 m 3 of flow must be sealed. Otherwise, it is necessary to equip a sufficiently high-quality cleaning system.
If the standards are not followed, the bacteria that live in the soil will not cope with water purification. Sewage will fall into the ground and into agricultural plantations.
According to established standards, if it is necessary to build a sealed well, it should be concreted. It also needs to be sealed. However, it is worth considering that to create a sealed well, you will need to prepare a lot of consumables. It is also worth taking care of the private disposal of wastewater.
The most popular option is with the construction of an installation with a filter bottom. Through it, the purification of impurities will be performed.
Attention! If a decision is made to complete a well with a septic tank, certain requirements must be met. For example, the depth is calculated according to the type of soil.
Wells of differential, nodal and rotary type are completely sealed. It is also worth remembering that when draining domestic water into the sewer, you should not install a filter well. This is due to the draining of chemicals and detergents. Repair of sewer wells after proper installation is extremely rare.
The construction of a well is carried out in accordance with certain stages. Particular attention should be paid to such works:
After that, it is necessary to install an overlap with a hatch, covered with earth. This solution will provide reliable thermal insulation of the well. The hatch must be made in such a way that it opens freely. A ventilation pipe is also being constructed, which will come to the surface 60 cm above ground level. If ventilation is not done, explosive methane will form in the tank.
Once everything is installed, you can start operating the sewer system. However, it is worth remembering that the fullness of the well should be monitored regularly. As soon as the tank is full, you need to call the vacuum truck.
Attention! To increase the time interval between the calls of the vacuum trucks, you should use various drugs. In summer it is better to use bioactivators. They are absolutely safe for the environment. In winter it is necessary to use chemicals.
Being the owner of your own suburban area and not having your own well is probably not the best option. Yes, of course, some holiday villages are equipped with a centralized water supply system, but it’s still better to be completely independent of the “whims” of public utilities. The well will also become a source of clean drinking water, and will satisfy all household needs, and will provide irrigation of the garden plot, but only if it will be configured correctly.
— materials and tools for waterproofing works.
Most modern wells are made of reinforced concrete rings. It is best to purchase such products that have a “quarter” locking part for centered and tight fit of the rings to each other. Standard ring size - 1000 mm - inner diameter, 1160 - outer diameter, wall thickness - 80 mm, maximum height - 900 mm. Such a product (KS-10-9) weighs 600 kg. If necessary, you can purchase rings of the same diameter, but of a lower height - 300, 500 or 600 mm. There are holes on the walls of such rings for inserting slings when hanging them and lowering them into the shaft.
You should immediately warn against the purchase of low-quality, illiquid rings that are damaged or have already been in operation. Such savings here are not only inappropriate, but can also be dangerous, since the practice of arranging wells knows many cases of rupture, distortion, bursting of rings with all possible consequences.
How many rings are needed is an individual question for each specific place. It is worth asking the neighbors how deep their well is, this figure should not change much. At the same time, the very design of the well is taken into account - the height of the aquifer itself, the trunk and the head.
If the ring has an outer diameter of 1160, then the shaft should be marked approximately 200 - 300 mm wider, i.e. Ø from 1350 to 1450 mm with the open method of constructing a well (more on this below). With the closed method, the minimum required gap is left - so that the ring passes into the shaft without distortion.
All selected land must be at least 3 meters from the pit from the place of work. You can even immediately take it away, for example, to a place where it is planned to build an "alpine hill". When the clay layer begins, it is better to store the selected clay separately - it will come in handy in the future for waterproofing the well.
1. You can install exactly the first ring and continue to dig under it - it will fall under its own weight.
As the subsidence proceeds, the next ring is installed on the first one, and they are fastened together with staples - and so on up to the aquifer. This method is called "closed", and is more relevant on problematic, quicksand soils, with quicksand, underground "rivers", etc. Thus, the excavator always works in a concrete ring, which descends with him as the soil is excavated.
This method is not considered optimal, as it has many disadvantages. So, a big boulder that has fallen under the wall of the ring can become a big problem when driving - it will not be easy to pull it out, and sometimes even impossible. But on the other hand, for the installation of the next rings, complex lifting equipment is not required, since it is always carried out at the top.
2. The second method is called "open" and involves digging the shaft to the entire required depth, followed by the installation of rings. Disadvantages - a much larger volume of soil to be selected, difficulties with mounting and fastening rings (work is carried out at a considerable depth), there is always a danger of shedding or even collapse of the walls of the mine, especially when unstable aquifers begin or a quicksand breaks through the wall - a source of "top water" .
3. Proceeding from the false, the mixed method will probably be optimal. At first, the work goes by the open method, but before the first sign of wall instability or the appearance of signs of perched water. Then, reinforced concrete rings are immediately lowered to the excavated depth, and further excavation is carried out using a closed technology, with the deposition of the growing well shaft. Most often, this approach is used in practice.
After the well is completely torn off throughout the depth, it is necessary to pump out all the water and silt from it in order to arrange a bottom filter.
Without this element, the water in the well will not have the purity that the owner probably expects. The keys beating at the bottom of the well can raise turbidity, sand, and in the case of quicksand (the current sand is extremely saturated with water), it will simply overgrow and become shallow very quickly.
The choice of a bottom filter depends on the state of the bottom - what kind of soil forms it:
To do this, large stones or crushed stone are laid on the bottom, with a maximum size of up to 150 — 200 mm. Then a layer of medium-sized gravel is poured (fraction 20-30 mm), up to 150 mm thick. And a layer of clean river pebbles is laid on top, also up to 150 mm thick. The total thickness of the resulting filter reaches half a meter.
In this case, washed river sand is first poured to the bottom. The second layer is river pebbles or gravel up to 10 mm in size (you can use shungite). And the top layer will be coarse gravel or pebbles with a size of 50 mm or more. The thickness of each layer is at least 150 mm.
So that it does not surface, they press it with large stones. From above, at least 200-300 mm layer of small pebbles or gravel is laid.
The work of digging a well is very specific and dangerous, requiring special precautions.
Usually, the work of high-quality digging of wells is carried out by teams of experienced professionals who have their own specialized equipment. It is almost impossible for a beginner to cope with such a task - there are too many nuances that are familiar only to masters, and there are too many dangers in the work.
At this, the construction of a well on a suburban area is far from over. There is still serious work to be done on waterproofing, insulation, building a clay castle, concrete pavement, laying water pipes, equipping a headroom and other stages. They will be discussed in more detail in other publications of our portal.
Sewer wells are an inseparable component of the drainage system. They are designed to collect wastewater, distribute the interchange of the main to the discharge zones and clean up certain sections of the pipeline.
A structure of this kind has its own purpose and method of construction. Sewer tanks differ in a number of ways.
There are several types of wells:
Collectors are made from various materials:
Reinforced concrete structures are distinguished by their strength, resistance to the negative effects of chemical compounds, and sufficient ease of installation.
The process of planning and construction of sewer systems is carried out by Special Rules and Regulations (SNiP), which regulate certain requirements, the main of which are:
Collectors should be installed at a distance from residential buildings and nearby areas
Preparation for the construction of sewer septic tanks consists of several stages:
The construction of a septic tank from reinforced concrete rings is carried out as follows:
Consider the construction technology of a brick collector:
The construction of a well made of natural stone is carried out in a similar way. Difficulties in the process of its construction arise due to the unequal size and shape of the stones. Therefore, the arrangement of the collector requires much more time and solution consumption.
When building a septic tank, it is important to take into account the installation features of each, depending on their purpose and material of manufacture.
The peculiarity of the filtering well is that its main task is to clean wastewater from harmful impurities. To accomplish this task, the bottom of the collector is covered with crushed stone about 1 meter high. In this case, the bottom is not completely filled with concrete mortar, but only along the perimeter. This prevents the foundation from collapsing and water from escaping through the center of the circle where drainage and cleaning takes place.
For the construction of a manhole, it is customary to use a pipe with a diameter of 46 cm. This pipe size makes it possible, if necessary, to clean the structure with water through a hose. If it is necessary to descend into the tank, the diameter of the pipe must exceed 92.5 cm.
When erecting a viewing manifold on a site without a pavement, an additional blind area is required, which contributes to the removal of wastewater. If the road surface is of high quality, the installation is carried out 7 cm above the ground surface.
Storage tanks are equipped at the bottom of the site to ensure the flow of water into the well. The structure is placed at a depth of 3-6.5 meters, no more than 7 rings are used during construction. At the bottom, special recesses are made, which are filled with sand or gravel. Water from the tank can be used for domestic needs.
1.
2.
3.
The sewerage system has a very ancient history, so its design and technology have been brought to a very high quality state. This article will address the main issues related to the use of sewer wells in the sewer system.
The normative act regulating the requirements for sewer wells and the procedure for their installation is SNiP 2.04.03-85 “Sewerage. External networks and structures”. The document displays all factors related to sewer wells, including their location, classification, dimensions and performance.
For the arrangement of sewerage in a private area, it is imperative to use manholes, placing them on the pipeline section between the building and the wastewater receiver. In addition, one of the possible options for the disposal of wastewater after it has passed through a septic tank is a filtering sewer well.
In addition, manholes are installed if the system contains:
Brick, concrete or reinforced concrete is used to make stone sewer wells, and rubble stone is used to create filter wells. Polymer wells can be made of PVC, polypropylene or polyethylene. In addition to structures made from a single material, there are structures on the market made from compounds of various resources.
According to SNiP, the dimensions of sewer wells vary as follows:
The order of actions will look like this:
As a rule, a pit is created according to this principle:
In the case of a concrete or reinforced concrete structure, the arrangement of the sewer well will look like this:
The device of a sewer well made of concrete rings, described above, is no different from the arrangement of a brick structure, with the only difference being that in the latter, concreting is replaced by brickwork. The rest of the workflow will look the same.
In addition to the tray, one or more conditions may be required to equip the overflow well:
Thus, the composition of the differential well includes:
According to regulatory enactments, the device of a well for sewerage is justified in such situations:
If the soil on the territory can move, then the pipes must be connected movably, for which each of them is wrapped with a plastic waterproofing packing. If necessary, a metal sleeve can be used to arrange the packing in its internal space.
Another advantage of plastic wells is the possibility of reducing the dimensions of the viewing window. For example, to replace a concrete well with a meter diameter, it will be enough to install a plastic 30 cm analogue, which is also much easier to maintain. Installing plastic sewer rings is easy and simple.
Conclusion
There are different designs of sewer wells, and the choice of a suitable device depends on the wishes of the owner of the site. This article answers the question of how a sewer well is arranged, and helps to choose the best option.
Many owners of private houses have to wonder: how to do it. Of course, it is always better to turn to professionals who are familiar with the installation technology and will be able to cope with the task. But if you don't have the funds to hire professionals, or if you want to save money on installation, then it's worth taking a closer look at this process and considering the individual steps.
To carry out the arrangement of the sewer well, you will need a number of materials:
After preparing the materials, you need to understand how to properly make a sewer well and where it is best to place it.
Performing a sewer well with your own hands, carefully approach the choice of a place to place it. It should be installed at some distance from the house in order to exclude the possibility of flooding with foundation drains. If there is a well for water intake on the site, then the distance between them must be at least thirty meters.
Other important parameters for choosing a place:
When making a sewer well with your own hands, you should pay attention to its tightness. According to the norms, it should not let water through, but this entails additional problems and will have to be cleaned more often. Therefore, most owners perform a filtering bottom that removes sewage.
You choose the size yourself, depending on the number of discharged drains. Many are interested in how to make a sewer well in a private house for 3 - 4 people and what depth to choose? The optimal solution for such a family is about 4 reinforced concrete rings, the larger the size, the less often you have to clean.
Now we will tell you how to build a sewer well. After choosing a location and depth, it would be nice to perform a simple scheme. It indicates the location of the house, the sewer pipe and the well, the dimensions of the future structure.
Manual development with shovels is a rather complicated option that takes a lot of time and effort. If you need to complete a structure with great depth, then only the first stage may take several days.
Another way to make a sewer well with your own hands is to attract specialized equipment, including an excavator. He will quickly cope with the task, significantly save time in the construction process.
After preparing the pit, you can proceed to the next steps.
For filtering structures, it is necessary to fill the bottom with crushed stone, its layer must be at least 40 centimeters. If the structure is completely sealed, then a reinforced concrete slab or concrete mortar for pouring is used as the base.
In practice, you can make a sewer well with your own hands from various materials, including:
Brick laying takes a sufficient amount of time, and wooden structures are damaged faster in high humidity. Plastic can be used, but it must be handled carefully so as not to damage the elements during installation. Therefore, it is best to use reinforced concrete, it is the most reliable and durable material today.
How to arrange a sewer well from reinforced concrete? Rings are installed on a prepared base. These structures are extremely heavy and may require a small crane or manipulator for installation. The joints should be smeared with sealants - they will prevent the flow of effluents into the soil.
After installation, you can fill up the trench with the pipe. An additional floor is installed directly on the structure. The cavities around are sprinkled with soil, the soil is carefully laid on the floor, a small free hole remains.
A cover is installed on top. It should be waterproofed so that rain and melt water do not get inside. It is not recommended to fill the cover with soil, it must be freely accessible and provide an outlet for accumulating gases.
Good ventilation is extremely important during further operation. Organic matter decomposes inside, methane and hydrogen sulfide are released. They must be brought to the surface, a large accumulation of methane poses a potential threat to the structure.
Now you know how to install a sewer well. Drawing conclusions, we can distinguish several main stages of construction:
It is best to purchase the standard cast iron version along with other elements. Making a sewer well cover with your own hands will require a lot of time and effort; additional materials and tools are needed for manufacturing.
But if the standard cover was destroyed during operation and it needs to be replaced, then you can make it yourself from the available materials. The simplest solution is to make it out of wood. You will need to pick up strong and high-quality boards, cut them to the required size, and connect them together. It is better to give a round shape after assembly, trim with electric saws and jigsaws. Wood is recommended to be treated with protective compounds, then it will serve you for a longer time.