September water shutdown. hot water shutdown schedule

It became known the period and terms in which hot water supply will be stopped in connection with planned work. The schedule for turning off hot water is somewhat different for Moscow and for the region. The term of work will be 10 days, but for some areas it has been reduced to three.

Shutdown of hot water supply in Moscow

The hot water shutdown period will begin in May of this year. It will be completed by September. The planned shutdown of hot water will take place in Moscow from May 13, 2019 to September 1. The same period is also relevant for New Moscow. The term for stopping the hot water supply will not exceed ten days. For some areas, it will be limited to 3 days. In some homes, water shutdowns are not expected at all.

The schedule for turning off hot water at the address can be specified in the form at the beginning of the article, on the official website of the Moscow United Energy Company. Or by calling a free hotline, which is available to citizens around the clock.

Notification must occur no later than 10 days before the start of work. The information will be constantly updated. Therefore, for individual districts and streets, it must be clarified during the period of preventive work.

In the form or on the MIPC website, hot water shutdown can be clarified for individual administrative districts of the capital and microdistricts.

Disconnection of hot water by district

In order to clarify the start date and the term for stopping the hot water supply for each individual district and microdistrict, it is necessary to select the administrative district from the drop-down list: SVAO, SZAO, VAO, ZAO, Central Administrative District, SEAD, SZAO SAO, SAO. Then determine the street and house number.

In the event that the schedule is not determined, this means that the object of interest is owned by another organization and the work schedule must be clarified directly with the Management Company.

The schedule is presented in full days. That is, the start from 00:00 of the specified date, the planned completion of work at 23:59 of the day indicated in the schedule.

Disconnection of hot water in the South Administrative District

At the beginning of May this year, it will be possible to get acquainted with the interactive list of addresses for the termination of hot water supply and the work schedule.

The list will include 16 districts. Including Biryulyovo, Chertanovo, Tsaritsyno, Orekhovo-Borisovo and others.

Shutdown of hot water in the North-Eastern Administrative Okrug

Termination of hot water supply in the North-Eastern Administrative District of the capital will also be presented in the form of an interactive list. Data on the schedule and timing of the work will be published by MIPC in the first days of May this year.

The list will include 15 districts. Among them will be Sviblovo, Maryina Roshcha, Otradnoye, Bibirevo, Rostokino and others. A detailed schedule for each district can be found separately.

Shutdown of hot water in the Moscow region

Termination of hot water supply in the Moscow region is somewhat different from the capital and may have its own characteristics. This is due to the fact that each of the municipalities sets its own rules and deadlines for the implementation of work.

So if the shutdown of water in Moscow in 2019 will be from 1 to 9 days for each site, then for regional cities the period can stretch up to 14 days. Detailed information on the schedule of work at the addresses can be clarified on the official websites of municipal administrations.

Shutdown of water in Zhukovsky

It is already known that the cessation of hot water supply in Zhukovsky will be carried out from May 16 to May 26. Hot water supply time is scheduled for 20:00. During this period, the equipment must be pressure tested, the defects in the heating networks have been identified and eliminated.

Turning off hot water in Khimki

You can get acquainted with the exact schedule of work on the official website of the Administration of the city district of Khimki. The period for the termination of water supply is tentatively scheduled from May 10 to August 20, 2019.

The list of boiler houses where preventive work will be carried out includes those that serve the microdistrict Ivakino, Planernaya, Podrezkino, Novogorsk and others.

Shutdown of hot water in Mytishchi

Work on the restoration of heating networks will be carried out by the Mytishchi Heating Network Company. All detailed information about the period of interruption of the water supply is located at the beginning of the article.

Here you can find the schedule for each street. They are sorted alphabetically with reference to the boiler room.

Shutdown of hot water in the city of Zelenograd

From May to the end of August 2019, work will be carried out in Zelenograd to restore heating networks. As a result, residential buildings will be disconnected from the supply of hot water. The maximum period of work will be 10 days for each section.

You can find out the exact schedule at the addresses for the city of Zelenograd at the beginning of the article.

Shutdown of hot water in Balashikha

To carry out work in preparation for the heating season will be "Thermal networks of Balashikha". Detailed information on the timing and addresses of the termination of hot water supply can be found at the beginning of the article.

Shutdown of hot water in the city of Korolev

Science City Korolev will provide information on the timing and areas of preventive work as part of the notification of the population on the official website of the Administration.

More than 20 boiler houses are included in the list of those subject to preventive maintenance. These include Novye podpilki, Tekstilshchiki, Samarovka, Komitetsky forest, Alfa Loval, Suvorovskaya, Tarasovskaya and others.

Shutdown of hot water in the city of Zheleznodorozhny

A detailed schedule and addresses of the shutdown can be found on the website of the city administration or the Government of the Moscow Region. Up-to-date information on this issue will be provided no later than the first days of May of the current year.

The list for work will include more than 25 boiler houses. During the planned period of DHW shutdown, defects in heating networks should be identified and eliminated and they should be prepared for the upcoming heating season.

Disconnection of hot water in the city of Dolgoprudny

Accurate information on the schedule for shutting down the hot water supply will be provided by the City Administration. The term of the work will not exceed 14 days.

The scheduled outage will be shown in the schedule in full days, that is, from 00:00 on the start date to 23:59 on the end date.

Why is hot water turned off?

Turning off the water in the summer is a common occurrence. This is due to the need for preventive work in preparation for the heating season.

Hydraulic tests are carried out in boiler houses and heating networks. They are aimed at:

  • assessment of the quality of repair of heating networks;
  • detection of defects and elimination of the causes of heat loss.

Turning off the water is a necessary measure. Without it, utilities will not be able to carry out the necessary work and testing. Therefore, without stopping the hot water supply, it is impossible to adequately prepare for the winter period.

Already on September 1, part of the inhabitants of Khabarovsk will be left without hot water - in the Far Eastern capital, autumn pressure testing of heating networks begins. Power engineers will have to test for strength before the heating season more than 200 kilometers of the heating main.

WHEN AND WHERE WILL THE HOT WATER BE TURNED OFF?

The first to be left without water are the consumers of the Industrial District and partially the Central - within the boundaries of Mukhina Street (from Postyshev to Slobodskaya), Gamarnik (odd side), Slobodskaya, Pushkin Street (up to Karl Marx Street)

Shutdowns will also affect some residents of the Zheleznodorozhny district - the Khabarovsk-2 district, Aerodromnaya, Tselinnaya, Kostromskaya streets, the area of ​​​​Geodesicheskaya, Washing, Shmakovskaya, DOS streets.

Two suburban settlements in the Khabarovsk district - Ilyinka and Rakitnoye - will also be in the shutdown zone at this time.

From 6 to 12 September hot water will be turned off in the houses of the Podgaeva street area due to the repair of the boiler house in the Volochaevsky town.

From 18 to 28 September - Krasnoflotsky, partially Kirovsky, Central and Zheleznodorozhny district

Following CHPP-1, hydraulic tests will begin at CHPP-3. All residents of the Krasnoflotsky District, as well as some consumers in the Central District of Khabarovsk, will remain without water for ten days: within the boundaries of Ussuriysky Boulevard, Leningradskaya, Amursky Boulevard and Sheronova streets. and Mukhina (from Postyshev to Leningradskaya). In the Zheleznodorozhny district, everyone will be left without water, except for the residents of Aerodromnaya, Tselinnaya, Geodetic, Washing, Shmakovskaya, Kostroma, DOSs and the Khabarovsk-2 district - these consumers will be provided with water by CHPP-1.

The last on the schedule is CHPP-2. For the period of pipeline testing, residents of the Kirovsky district will remain without hot water within the boundaries of the streets: Amursky Boulevard, Dzhambula, Metallistov, Pacific, Istomina.

Also, consumers of the Central District will not have water within the boundaries of the streets: Amur Boulevard, Sheronova, Lenin - from Blucher Square to st. Shevchenko.

Testing of thermal networks for strength is carried out to determine their readiness for the next heating season, - explains director of KhTSK Sergey Nehoroshikh.- The pressure in the pipelines is increased to a level about a quarter higher than the standard load. This is necessary in order to timely identify "weak points" of heating networks, to prevent the formation of defects and failures in heat supply in the upcoming heating season. Therefore, we ask consumers to understand the inconvenience associated with the temporary lack of hot water.

Every year in Moscow, as in other cities of Russia, hot water supply is turned off. Since hot water is a guarantee of comfort, many people are interested in when this will happen in order to adjust their plans for these inconveniences.

When will the water be turned off?

Usually, water is not turned off in all the city, but gradually in different areas (neighborhoods, sections of several streets, and so on). All water cuts occur according to a pre-developed plan, so residents can adjust their plans if they wish.

Enter the address of the house to determine the date of turning off hot water in Moscow in 2018


Check out date

Since MIPC is engaged in the maintenance of water supply networks, you can see the schedule for turning off hot water in Moscow on the official website of the company. Please note that in rare cases there are slight deviations from the schedule if the planned work does not have time to complete on time. To see the hot water shutdown schedule for 2018 at the address of the house, follow the link.

How long does a shutdown usually last?

The lack of hot water brings a lot of inconvenience to a modern person, so for many people the question of the duration of a water shutdown is very relevant. Usually hot water is turned off for a period of 10 days. If hot water supply has not been restored within 2 weeks, you have the right to demand a revision of utility bills.

Often the water is turned off for only a few days. Refers to new areas where new pipes and other equipment used to provide hot water and heat to apartments have been installed. Checking the operability of networks and their readiness for the heating season in this case takes 3-4 days, although it may vary depending on the characteristics of the system and the area. As the number of new pipes and equipment increases every year, the turnaround time for many areas is reduced. But about 70% of communication networks in the capital are still Soviet-era.

Why turn off the water?

An annual shutdown of hot water is necessary to check the health of the networks and their readiness for the next season. Stop hot water supply for preventive maintenance. They necessarily include high-pressure hydrotesting, which makes it possible to identify weaknesses in pipelines. Eliminating faults and weaknesses reduces the risk of accidents during the cold season.

Not only heating networks, but also heat exchangers, pumping and other equipment need regular maintenance. During the shutdown of hot water, maintenance and various preventive works are carried out, which prevent many troubles during the heating season.

The spring of 2017, which became the coldest in the past few decades, forced the power engineers of Moscow and St. Petersburg to adjust the hot water shutdown schedules for annual preventive maintenance of heating and water supply systems.

Due to unfavorable weather conditions, the heating season in the two capitals was extended, and the start of work was delayed by an average of two weeks.

When will they start turning off hot water in Moscow: terms, scope of work

A few days ago, heating began to be turned off in residential buildings and social facilities of Muscovites, and on May 22, an updated schedule for the interruption of hot water supply in the capital came into force. The adjusted hot water shutdown schedule in Moscow in 2017 can be viewed on the MIPC (Moscow United Energy Company) website. It shows when and in which areas shutdowns will take place.

It is known that in addition to diagnostics and repair of pipelines, hydraulic tests will also be carried out during shutdowns. In addition, specialists will have to check the operability of the equipment installed in district heating and pumping stations, as well as in central heating points. As a rule, all works take about 14 days. Works at all metropolitan facilities must be completed by August 25, 2017. There will be no planned shutdowns in the future.

According to MIPC, in the course of preventive maintenance, it is planned to check the operability of approximately 33,000 residential buildings. By the way, 3,000 residential buildings in Moscow will not be affected by hot water shutdown in the summer of 2017.

Schedule for turning off hot water in 2017 in St. Petersburg: online version

Petersburgers should also be prepared for the imminent shutdown of hot water in residential buildings. Resource-supplying organizations will begin preventive work in the very near future.

To find out the exact schedule for turning off the hot water supply in the house during the annual planned work in the summer of 2017, every Petersburger can use the convenient online service offered by resource supply organizations. To do this, go to the company's website and type your address in the search box.

Repair work of heating networks in the Northern capital will last, as expected, until the end of August. It is planned to carry out scheduled preventive maintenance of almost 300 energy sources and more than 200 central heating points.

Water / Water outages

Shutdowns of hot water in Moscow at addresses. interactive service. 2019

Hot water shutdowns in Moscow in 2019 will begin on May 13. Shutdown periods should not exceed 10 days. When there is no hot water in your house, you can see it using a special online service published by the Moscow authorities.

To clarify the terms for turning off hot water in your home, you need to open the item “When is hot water turned off?” in the form below. and start typing your address. By choosing the correct option from the lists of hints, you will receive information about your home.

You can also clarify information on the timing of turning off hot water on the website of the Moscow United Energy Company (MOEK).

The service looks like this:

To find out information about your home, you need to start typing the address you are interested in in the information input box, and then select it from the drop-down list of "tips».

If you did not find your address in the widget, please contact your management company for information about the timing of turning off hot water in your house. Most likely, hot water is supplied to your house not by MIPC, but by another company.

Hot water shutdown schedule by addresses. Administrative districts of Moscow

Shutdowns of hot water in Moscow at addresses. A bit of history and reasons

Publishing interactive graphs of hot water shutdowns at addresses in Moscow began about five years ago. Prior to this, MOEK, at best, posted Excel files on the Internet, with lists of houses and streets. Well, until the mid-2000s, it was possible to find out about hot water outages only from announcements in the entrance. And in this sense, of course, over the past ten years, the capital's communal services have come a long way.

Why is there a hot water problem? The fact is that the system of supplying heat and hot water in Moscow was formed in the Soviet period and is characterized by extreme centralization. From large thermal power plants, the coolant (they say in a simple way, steam) is supplied directly to the houses. And only in very rare cases do houses have their own boiler rooms (heating boilers have been installed).

As a result, in order to carry out the necessary preventive and repair work, it is necessary to turn off the coolant supply (and hot water is heated from it) for several quarters at once. Otherwise, the central heat pipe cannot be repaired. As a result, residents suffer. They have to sit for weeks without hot water.

Hot water shutdowns - dates and dates for the start of shutdowns in 2019

Hot water shutdowns in Moscow in 2019 begin on May 13. During shutdowns, preventive work and overhaul are carried out at district heating stations and central heating points. Repair is carried out using modern energy-saving technologies. Diagnosis of networks, hydraulic tests, and, if necessary, re-laying of pipelines are carried out.

A few years ago, Muscovites lived without hot water for almost a month, then three weeks (21 days), then 2 weeks (14 days), and today the maximum period for turning off hot water is 10 days.

Why are hot water shutdowns in summer in Moscow?

Hot water shutdowns are associated with the so-called "hydraulic tests" tests. They are carried out following the results of a repair campaign on heating networks. What for?

Here is how the public utilities themselves formulate the goals of hydraulic tests:

checking the strength and density of pipelines and their elements, including all welded joints, as well as identifying weak spots caused by corrosion and fatigue of the pipeline metal;

  • checking the quality of repairs performed on heating networks;
  • detection of defects and elimination of the causes of heat and coolant losses;
  • ensuring trouble-free operation of heating network equipment, reliable heat supply to consumers during the heating season.

What does the legislation say about the rights of citizens in connection with the mass shutdowns of hot water in the summer?

The current legislation of the Russian Federation forms the requirements for the organization of hot water supply in apartment buildings as follows.

Permissible duration of interruption of hot water supply:

  • 8 hours (total) within 1 month;
  • 4 hours at a time;
  • in case of an accident on a dead end highway - 24 hours;
  • during preventive maintenance (once a year);
  • shutdown of hot water systems should not exceed 10 days.

How is the payment for hot water when disconnected?

In the summer, when hot water is turned off for scheduled repairs, a recalculation must be made for consumers - hot water is not charged at this time.

In case of an unscheduled shutdown, which is associated with a malfunction of engineering equipment - both main and in-house, a recalculation is also made. If the owner of the housing (premises) did not receive hot water in the required volume or there were interruptions in its supply, he can count on the recovery of moral damages and the payment of a penalty provided for by the Law on the Protection of Consumer Rights. It is 3% of the monthly tariff for each day of non-fulfillment of obligations by the management company or supplier organization.

A deviation from the standard values ​​​​by 3 degrees during the day and 5 degrees at night (from 0 o'clock to 5 in the morning) is allowed. If the temperature of "hot" water is below 40 degrees, you can pay for it as for cold water.

Turn off hot water in summer. How to be saved?

According to opinion poll data, 45% of Russians heat water on the stove during hot water outages. Women (52%) and low-income respondents (51%) do this especially often. At the same time, some of them are thinking about buying a water heater, while others consider this invention dangerous.

To turn off the water, those who use the stove have different attitudes. Some are very annoyed: “I’m going crazy from this”; “This shutdown just infuriates me!”; “Three weeks of hot water shutdown is an excessively long period for carrying out repair and maintenance work on heating networks”; "Horror . And I try to live somewhere else. Others take this period calmly: "adapt- not a problem"; “Not the worst loss. A modern person can do without hot water for some time.”

Every fifth respondent (20%) has got a water heater. More often, this solution to the problem is preferred by Russians aged 40-49 years (27%) and respondents with high incomes (23%). “Three weeks without hot water is a disaster!” they explain their decision. True, many of those who decide to buy a water heater say that for them, turning off hot water lasts more than three weeks: from a couple of months to decades.

9% of respondents do not experience any inconvenience due to the disconnection of hot water, as they are hardened enough to take cold showers. Men (14%) and those with high incomes (11%) are more likely to brag about this hardening. In their opinion, a cold shower invigorates and is good for the skin.

6% of Russians go to wash with friends and relatives during difficult times. “Very convenient: I ate, washed, talked,” they comment.

Another 3% of respondents believe that turning off hot water is a good reason to go to the bathhouse. “There is nothing more beautiful than on a hot summer day to forget about the bustle of the metropolis and find yourself in a sauna among beautiful and interesting people, and at the same time take a bath. Moreover, the sauna is good for the skin,” the respondents said.

3% of respondents offered other answers. Here are the most interesting of them: “I go to the pool”; “I don’t wash”, “I wash at work”, “I swear”.

Some Russians are lucky and have no problems with hot water. 9% have a gas water heater.

Well, 5% of respondents do not turn off hot water in summer. Lucky))

What else to read